Loading...
34-016 176 Turkey Hill Road CofC.pdf Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8B – Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: 246-0751 Provided by DEP A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. This Certificate of Compliance is issued to: Linda Doucette-Ashman and Harvey Ashman Name 176 Turkey Hill Road Mailing Address Northampton City/Town MA State 01060 Zip Code 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Linda Doucette-Ashman and Harvey Ashman Name April 14, 2021 Dated 246-0751 DEP File Number 3. The project site is located at: 176 Turkey Hill Road Street Address Northampton City/Town 34 Assessors Map/Plat Number 016 Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Linda Doucette-Ashman and Harvey Ashman Property Owner (if different) Hampshire County 14286 Book 129 Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant’s agent, on: March 12, 2024 Date Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8B – Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: 246-0751 Provided by DEP B. Certification Check all that apply: Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). 33, 34, 35. Revised Condition #34 - The limit of work line and all other aspects of the original Condition #34 shall be revised by the Site Construction Erosion Control Plan LC122 dated May 10, 2021 as approved by the Conservation Commission at a hearing on May 13, 2021. The erosion control installation will be at the tree line in the area of wetland flags B38 to B45. The existing lawn area will be restored up to the tree line. The triangular shaped area, shown on this plan between flags B43 and B45, will be a "no mow zone" and not maintained as lawn. These changes supersede the requirements of Condition #34 in the original Order of Conditions dated April 14, 2021. C. Authorization Issued by: Northampton Conservation Commission March 14, 2024 Date of Issuance Signatures are made in accordance with M.G.L. c.110G, and pursuant to the board’s electronic signature authorization vote recorded on June 5, 2020 in Book 13653, page 165 at the Hampshire Registry of Deeds. Kevin Lake David Reckhow Jen Smith Elizabeth Spriggs C. Mason Maronn Paul Fosteer-Moore Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8B – Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: 246-0751 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: Conservation Commission Please be advised that the Certificate of Compliance for the project at: Project Location DEP File Number Has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant     12.20.2023  Sarah LaValley  Conservation, Preservation and Land Use Planner  Northampton Office of Planning and Sustainability  210 Main Street  Northampton, MA 01060    Re: Request for Certificate of Compliance  176 Turkey Hill Road Northampton, MA  Parcel 34‐016  Owners: Linda Doucette‐Ashman and Harvey Ashman  Site Assessor Map ID: Parcel 34‐016  Book and Page: BK 13666‐ Pg 341  DEP File #: 246‐0751  Orders Recording #: Bk 14286‐ Pg 129    Dear Sarah,    We are pleased to submit this letter requesting a Certificate of Compliance relating to the  Notice of Intent filed March 3, 2021, the Order of Conditions dated April 14, 2021 and the  clarification of condition #34 at the Conservation Commission hearing on May 13, 2021  (collectively “Order of Conditions”) on behalf of owners Linda Doucette‐Ashman and Harvey  Ashman at 176 Turkey Hill Road.  This project involved the demolition of an existing single‐ family home and building of a new single‐family home.    Berkshire Design conducted multiple site visits throughout construction and observed the  work in progress. The site was stabilized throughout construction: silt fences, and barriers  were maintained, and the resource areas were protected. Final finish work, seeding and  planting took place during the Summer of 2023. As of Fall of 2023, the limit of work associated  with the project is fully stabilized.  At this time, maintenance of silt fences has ceased and  removal of fencing is pending authorization provided by the Conservation commission.  All  areas upslope of the fencing is 100% stable with uniform vegetative cover.    The following documents accompany this request:    1. WPA Form 8A – Request for Certificate of Compliance    2. Letter from Don Teagno, President, Teagno Construction Incorporated dated  December 15, 2023 as general contractor on the project (a) confirming the Order of  Conditions has been satisfactorily completed, and (b) reporting that condition #36 has  been satisfactorily completed as further described in the letter.    3. Record Conditions Plan of Land dated October 2, 2023 signed and stamped by  registered professional land surveyor, Timothy D. Armstrong, and registered  Carolyn Misch, Director  City of Northampton Office of Planning & Sustainability  Berkshire Design Group                  176 Turkey Hill Road ‐Request for Certificate of Compliance  │  Page 2                          professional engineer, Greg P. Henson, showing the as‐built drainage structures and  other stormwater structures and elevations within 100 feet of wetland boundaries as  required by condition #32.     4. Affidavit from Greg P. Henson, Civil Engineer about the installation of stormwater  features.     6. Site Construction Erosion Control Plan LC122 dated May 10, 2021 as presented to the  Conservation Commission and approved at a hearing on May 13, 2021.  This  document clarified:     a. the limit of work line would be at the tree line (rather than at the 50 foot  buffer zone line) in the area of wetland flags B38 to B45;    b. the lawn would be restored up to the tree line; and     c. the triangular shaped area shown on this plan between flags B43 and B45 will  be a “no mow zone” and not maintained as lawn.    These changes supersede the requirements of condition #34 in the Order of  Conditions dated April 14, 2021.      Based on the above, I hereby certify that the project followed substantial compliance with the  plans, and the project is completed.  We respectfully request the Northampton Conservation  Commission issue a Certificate of Compliance for the project at 176 Turkey Hill Road.     If you have questions or need anything else, feel free to call or email.      Sincerely,         Rachel     Rachel Loeffler, RLA, ASLA, Principal  Berkshire Design Group, 413‐582‐7000 x 119  wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: 246-0751 Provided by DEP A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. This request is being made by: Rachel Loeffler, Principal, Berkshire Design Group Name 4 Allen Place Mailing Address Northampton City/Town MA State 01060 Zip Code 413-582-7000 Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Linda Doucette-Ashman and Harvey Ashman Applicant 04/14/2021 Dated 246-0751 DEP File Number Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 3. The project site is located at: 176 Turkey Hill Road Street Address Northampton City/Town Map 34 Assessors Map/Plat Number 016 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Hampshire County 14286 Book 129 Page Certificate (if registered land) 5. This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). Please note, that during the Conservation Commission meeting of May 13, 2021, the commission approved an administrative change to the limit of work line. The applicant was directed to reference the updated construction plan dated May 10, 2021 during the request for Certificate of Compliance to document this administratively at project end. . . the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: 246-0751 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). December 15, 2023 Northampton Conservation Commission 210 Main Street Northampton, MA 01060 Attention: Sarah LaValley E-mail: slavalley@northamptonma.gov RE: Order of Conditions dated April 14, 2021 176 Turkey Hill Road, Northampton, MA Parcel 34-016; MassDEP File No. 246-0751 Dear Ms. LaValley: This letter is submitted to you in connection with a request by Harvey Ashman and Linda Doucette-Ashman for a certificate of compliance for the order of conditions issued on April 14, 2021 as clarified at the Conservation Commission meeting on May 13, 2021 (collectively “Order of Conditions”). On behalf of TCI as general contractor on the project: 1. I confirm the Order of Conditions has been satisfactorily completed. 2. I report TCI and Taylor David Landscaping (TDL) satisfactorily completed the work required by condition #36 of the Order of Conditions. TCI ensured debris from the installation of the well was removed from the area. TDL performed the site work in the area of the well and confirmed the elevations of the property around the new well were restored in accordance with the Order of Conditions. The area has been restored to lawn; the area existed as lawn prior to construction. Very truly yours: Contractor: Teagno Construction, Inc. By: _________________________________ Name / Title: Don Teagno, President Missing flag B491-1/2ST WDFRAMESHEDSHEDSHEDGRAVEL DRIVEWell Bordering Vegetated Wetland4604704 6 0 4 5 0 4 4 0 43042041046 0 450 Perc 21651-20.50"REMOVERed Maple1646-22"SugarMaple1645-27.50" RemoveWhite Pine1642-34"1653-22.5"White Pine1659-21"White Pine1658-21"Black Oak1660-21.00"Red Maple1654-21"White Pine1655- 20" RemoveWhite Pine16"14"1644-17"Red Oak1643-17"White Oak1656-22"Red Oak1657-17.5"Hemlock1614-11.5"White Pine1652-17.5"Hemlock1647-10"Sassafras1648-8.5"PaperBirch1650-15.5"Hemlock1649-16"Hemlock1613-11"RedMaple1666-22"Red OakWETL A N D BUF F E R 50-1 0 0' B 29 A35 B18 WETL A N D BUF F E R 0'- 5 0' B14 B15 B16 B17 B19B20 B21 B22 B23 B24 B25 B26 B27 B28 B31 B32 B33 B38 B39 B42 B46 B52 B57 B43 B53 A5 A6 A7 A8 A10 A12 A11 C4 C1 C11 C6 C5 A1 A2 C2 C3 B37 B35 B34 A14 A15 A16 A33A48A49 D23 D22 D21 D6 D7 A19 A18 D4 D2 D1 D30 D25 D24 D27 D29 B47 B48 B51 B50 B54 B55 B56 D5 D8 D9 D10 D11D12 D13D14 D15 D16 D17 D18 D19 D20 A34A36A37A39A47A32A31A30A29A28 A27A26A25A24 A23 A22 A21 A20 C7C8 C9 C10 A4 A3 B44 B45 B41 B40 B36 B58 PROPERTY LIN E A50 B30 4"Deciduous3"Deciduous46246546746846746746445910" PVC467464OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW WETLANDBUFFER50-100 ' WETLANDBUFFER 0 ' -50 '20' Side SetbackS 07°06'16" E 1155.40'N 08°47'23" W 522.43'1EDCBA23456EDCBA123456c Kuhn Riddle Architects, Inc.KUHN RIDDLEA R C H I T E C T S28 AMITY ST. SUITE 2BA M H E R S TMASSACHUSETTS 010024 1 3 2 5 9 1 6 3 0www . kuhnriddle . comThis drawing is not intended nor shall it be used for constructionpurposes unless the signed professional seal of a registered architectemployed by Kuhn Riddle Architects, Inc., is affixed above.Keynotes/General Notes:Date:Drawn By:KRA Project #:Scale:SITE CONSTRUCTIONEROSION CONTROLPLAN(For Construction)May 10, 2021 1 EROSION CONTROL PLAN 5/10/214/12/2021 9:28:18 AM 5/10/21RL/ GPH (BDG)TURKEY HILL RD RESIDENCE20039176 TURKEY HILL ROADNOTHAMPTON, MA 01062Rev. No.DescriptionDateWeb: http://www.berkshiredesign.comEmail: bdg@berkshiredesign.com (413) 582-70004 Allen Place, Northampton, Massachusetts 01060Landscape ArchitectureCivil EngineeringBerkshireGroupDesignLand SurveyingMATCH LINE LC121MATCH LINE LC121PROPERTY LINESEPTIC PERCOLATION TEST LOCATION 2DEMO EXISTING STRUCTURES ON SITETYPICALREMOVE EXISTING SEPTIC STRUCTURE ANDASSOCIATED UTILITIESDEMO EXISTING HOUSE & SHED ANDDISCONNECT ALL UTILITIESREMOVE EXISTING TREE #1614, 11.5" WHITE PINEFOR STORMWATER IMPROVEMENTSEXISTING WELL TO DISCONNECT FROM EXISTING HOUSEPROTECT UNTIL DEMOLITION OF EXISTING HOUSEDEMO EXISTING DEGRADED GRAVEL DRIVEWAYREMOVE EXISTING WOOD SHEDLIMIT OF WORK LINE100' WETLAND BUFFER50' WETLAND BUFFERWETLAND EDGE100' WETLAND BUFFER50' WETLAND BUFFERCUT TREE #1649, 16" HEMLOCKLEAVE 3" OF TRUNKREMOVE TREE #1651, 20.5" RED MAPLE PER ARBORISTRECOMMENDATIONS, CUT TRUNK 3" FROM BASE LEAVE ROOTSEXISTING TREE SNAPPED DURING WIND STORM #1652,17.5" HEMLOCK WAS IDENTIFIED FOR REMOVAL PER ARBORISTRECOMMENDATIONSLEAVE 3" STUMPREMOVE EXISTING TREES #1645-27.5"WHITE PINE, & # 1655-20" WHITE PINEPER ARBORIST RECOMMENDATIONSL IM ITOF WORK L INEEXISTING BOULDER TO REMAIN ON SITESALVAGE EXISTING BOULDERS FOR REUSE ON SITEREMOVE EXISTING SHRUBSREMOVE EXISTING ORNAMENTAL TREESSALVAGE EXISTING BOULDERS FOR REUSE ONSITESALVAGE EXISTING BOULDER FORREUSE ON SITEREMOVE EXISTING VEGETATIONREMOVE EXISTING VEGETATIONREMOVE EXISTING VEGETATIONEXISTING LAWN TO REMAINREMOVE DEBRIS PILEREMOVE SMALL TREE/SHRUBNORTHAMPTONSIGNIFICANT TREE (20"CALIPER OR GREATER) TOREMOVE DUE TOCONSTRUCTION; REQUIRESREPLACEMENTTREE LESS THAN 20" TOREMOVEAT RECOMMENDATION OFARBORISTTREE LESS THAN 20" CALIPERTO REMOVE DUE TOCONSTRUCTION ASSOCIATEDWITH PROJECT SCOPEREMOVE TREE #1644, 17" REDOAK FORNEW STORMWATER MANAGEMENTREMOVE TREE # 1643, 17" OAK FORNEW STORMWATER MANAGEMENTLIMITOF WORK LINEEXISTING RIPRAP AND ARMORED SWALE TO REMOVESEE GRADING AND DRAINAGE PLANS FOR IMPROVEMENTSREMOVE THIS SECTION OF OVERHEAD ELECTRIC AND TELECOM LINEPROVIDE TREE PROTECTION FENCING TYPE 2- SNOW FENCINGPROVIDE EROSION CONTROL BARRIER BETWEENLIMIT OF DISTURBANCE AND DOWNSLOPE AREAS(TYPICAL)100' WETLAND BUFFERREMOVE EXISTING TREE # 1659- 21"WHITE PINENORTHAMPTONSIGNFICANT TREE SEEKINGWAIVER DUE TOARBORIST'sRECOMMENDATIONS FORTAKE DOWNREMOVE EXISTING TREE #165421" WHITE PINEREMOVE EXISTING TREE #1653 22.5"WHITE PINETEMPORARY LIMIT OF WORK LINELIMIT OF GRADINGTEMPORARY LIMIT OF WORK LINELIMIT OF GRADING0'20'10'SCALE 1"=20'-0" LC 122DEMOLITION & EROSIONCONTROL PLANS(Sheet 2 of 2)REMOVE SMALL TREE/SHRUBEXISTING HEMLOCK SNAPPED BY WINDLEAVE 3" STUMPEXISTING LAWN TO REMAINPER NORTHAMPTON CONSERVATION COMMISSION,NO FUTURE MOWING TO TAKE PLACE IN THIS AREA,"NO MOW ZONE."CUT TREE #1650, 15.5" HEMLOCKLEAVE 3" OF TRUNK