Loading...
PDF File May 3_latest,5 3'-0" x 5'-0" 35,-O" 3'-0" x 5'-0" 3'-0" x 5'-0" 3'-0" x 5'-0" 3,-0" x 5,-0" 0 0 0 0 m CA PLE46E NOTE: ALL DIMENSIONS ARE TO BE FIELD YER/F/ED 8/NCE EXACT OVERALL D/MFNSIONS M,4Y NOT BE EXACT ,4N0 THE FACT THAT EXISTING BU/LD/N65 .41?E NE/TNER PLUMB NOR SQU,4RF. ADUlST ALL DIMENSIONS ,46 NEEDED TO FIT FOR THE NEW GONSTRUGTION, All 244 I INCH = 4 FEET 10 FEET z o N 00 � d L z Li _^ -/ LU LU L1 F Ld V � cs cl O_ O Z 10 I L Z LU O � U z O N ~ V z U z � A Ld L 0 c� LZI.I � U 0 � 0 a w � z~ o wM Q� �Q (Y N 0 4J TAM PIZA\VN eY: TAN SCALE:,{ 1�411 = 11.011 STAMP DATE NOV 2023 511LI=T M0 RED/ 5 9'-41I V 51-0II 14'-C" CRI71C,41- NOTS: T,LIE OVERALL 14El61-17' MUST BE VERIFIED ON S/TE SINCE 1-IE/61-17" OF BU/LD/NCS /5 CONTROLLED B'r T,-IE C/T'r OF NOR71LIA I=710N ZON/NC /T 6kALL BE TILIE OF T,-IE CONTRACTOR TO VER/F'r 71-IE TOTAL qjS/CNT WILL NOT V101-ATE T,-IE ZONINI kEI6NT. ,AFTER T 4E CE/L /N6 JO/S TS ,ARE SET DIMEN8/ON6 614ALL BE CHECKED AND VERIFIED PR/OR TO THE R06E BEING SET. TkE ROOF PITCH MA)' BE AOX67ED /N ORDER FOR FULL COMPLIANCE TO ZON/N6 /5 TO BE AC141EYED, N _ C\ \ � r N Oj c� - AR — -m OF 4TER i N r m � N � m - CEILING N m 0 r 0 FINISHED FLOOR - N m r O � r O m O FINISHED FLOOR CEILING FINISHED FLOOR 111 N REAR ELEVATION I, I INCH = 4 FEET IN 10 FEET W e} V tY p n L1 ib � O Q Q Z3 Z w U 4 U Q �LU � O � O 'www U ui DO �� �O CLIECICED by, T�VN D2A\VN by; TAN .SCALE: 1/4II o V-oil '5TAMP DATE DEC 2024 51LLT MLS REV C BEAM ABOVE ro'-54" x 5'-4-ha" 0I-OII I12'-0" FIELD VERIFY ADDITION - SECOND FLOOR PLAN BEAM ABOVE v TYPICAL 2x6 SIDING EXTERIOR WALL: VINYL HORIZONTAL SIDING 1-1/32" ZIPWALL SHEATHING 2x6 STUDS a 24" o.c. CLOSED CELL SPRAY INSULATION 1/2" DRYWALL TAPED 8 SANDED NOTE: FINAL WINDOW SIZES AND MANUFACTURER SHALL BE DECIDED 5Y OWNER * CONTRACTOR PLF45F NOT�- ,4LL D/ jFNS/ONS ARE TO BF F/FL17 VERIFIED S/NCF EXACT OVERALL ZNMEN5/ON5 MA r NOT BF EXACT AND TIkE FACT rkA T FX/5 T/NO BU/1-D/N66 ARE NF/T,NFR PWMa NOR SQUARE ,4DJU57.ALL D1MEN5/ON5 ,45 NEEDED TO F/T FOR 7'11IE NEW CONS 7"RUCT/ON, INSURE THIS DURING CONSTRUCTION. THE NEW WALL SHALL BE CONSTRUCTED SO THE NEW DRYWALL ALIGNS WITH EXISTING WALL REMOVE ALL SIDING 4 TRIM TRIPLE 2x10 JOISTS TYPICAL 2x6 SIDING EXTERIOR WALL: VINYL HORIZONTAL SIDING I71/32 ZIPWALL SHEATHING 2x6 STUDS e 24" o.c. MID SPAN BLOCKIN CLOSED CELL SPRAY INSULATION 1/2" DRYWALL TAPED 6 SANDED 6'-Bia" x 12'-OII FIELD VERIFY ADDITION - F-llR5T FLOOR PLAN a P o a as EXISTING FOUNDATION o a ao a ao as D 0 15" GRAVEL BED Oi � DDP O [l �— POST UP TO FLOOR JOISTS 6x6 P.T. POST a _ � TRIPLE P.T. 2x12 BEAM 12 FT. LONG EZ-PIER - 4 REQUIRED WEIGHT -150 IBS HEIGHT 54" 8" x 8" TOP BASE SIZE IS 2 FOOT SQUARE LOAD CAPACITY 115,000 LBS, POST UP w/ 6x6 P.T. POST 611 6 CHECK THIS DIMENSION. 12'-0" THE NEW DRYWALL ONTO THE NEW FIELD VERIFY 2x6 STUD WALL SHOULD ALIGN WITH THE EXISTING DRYWALL, SEE ABOVE FIRST FLOOR NOTES. VERIFY BY SOME FOUNDATION PLAN DISTRUCTIVE HOLE BORING INTO WALL AFTER ADDITION IS CONSTRUCTED REMOVE SLIDER INSTALL DOUBLE 11 -1/&" LVL BEAM AND REMOVE WALL THEN PATCH REMOVE SIDING DECK REMOVE DECK # STAIRS 11'-4!/:2" FOUNDATION TO FOUNDATION EXISTING CONDITIONS 4 DEMOLITION ,AND JOIST ISTING FOUNDATION FLOOR JOISTS a 16" o.c. rRIPLE 2xIO JOISTS 13/41 2%4" 12'-OII lo FIELD VERIFY ADDITION - SECOND FLOOR FRAMING I=L4N TRIPLE 2x10 JOISTS MID SPAN BLOCKING 12'-0" FIELD VERIFY FIRST FLOOR FRAMING PLAN BAND JOIST KISTING FOUNDATION > FLOOR JOISTS a 16" o.c. TRIPLE 2x10 JOISTS 2, 1 INCH = 4 FEET 10 FEET z Q c)-' N 00 3 z a w Ld o O Z w z w � v elf u Ld w V1 ci Q w O to z L U F 0 s HzA Q Q C4 cl]Lcvs-p E'y T\VN w—A\VN e'y; TLN SCALE: I/4" - II-0" STAMP DATI=. J,4N 2024 siLLT M=T REV 1/15/24 1 1/4" RIMJOIST ALL SIDES 2 x 12 RIDGE BOARD 12 TOTAL HEIGHT CRITICAL - PLEASE SEE CAUTION NOTE ELOW (o ASPHALT ROOF _ MC4 FULL COVERAGE ROOF UNDERLAYMENT a) Ole 01 Ole 5/0" PLYWOOD T8G ROOFING SHEATHING �i N N ASPHALT SHINGLED ROOF I 2x10 RAFTERS w 16" o.c. SEE NOTE- - m le CENTERLINE OF ROOF m 2x4 x S FT, LONG COLLAR TIE r =� ZIP SYSTEM 5/5" T8G ROOFING SHEATHING INSTALL ON EVERY OTHER RAFTER SET PROPER VENT r 2x6 RAFTERS a 16" o.c. R60 BLOWN -IN INSULATION 2x8 CEILING JOISTS 2x8 RAISED PLATE 0R60 BLOWN -IN INSULATION I N / 9 1/2" DEEP SERIES 40 I -JOISTS a 16" o.c. 1/2" CEILING SHEETROGK TAPED 8 SANDED DOUBLE 2x10 WINDOW HEADER w/ 2 1/2" THICK RIGID INSULATI (X O � I _ O LL LU O � _ r � \fj W z EXISTING FLOOR ASSEMBLY FINSTALL NEW 3/4" THK, HARDWOOD FLOORING cal PROPER VENT Q RAISED 2x8 PLATE EXISTING CEILING z _ _ W Y_ LU AAlu ctl EXISTING SECOND FLOOR t— W \1 O I N FINISHED FLOOR I FINISHED CEILING � w T_ W 4 � w EXISTING FIRST FLOOR I (� W N z I O FINISHED FLOOR 4rW 4 4 - — Z N } N D°Q D°Q EXISTING GRADE D4, EXISTING BASEMENT D4, a; a .o a; a .o D I D TOP OF FOOTING 0 I 14'-0" 14 -O" 21" I INCH = 4 FEET 10 FEET FIELD VERIFY HOUSE GROSS SECTION w/ NEW THIRD FLOOR PLEASE NOTE: .ALL ZNMENS/ONO ARE TO BE FIELD VERIFIED SINCE OVERALL Z701MEN6/ON6 MA r NOT BE EXACT AND THE FACT TNA T EX/O T/N6 BU/LD/N66 ARE NF/714ER PLUMB NOR SQUARE. ADJUST ALL DIMENO/ONO AO NEEDED 70 FITFOR TIE NEW CONSTRUCT/ON. SOFFIT - TOP OF WALL PLATE TYPICAL 2x6 SIDING EXTERIOR WALL: VINYL HORIZONTAL SIDING mom Il/32" ZIP SYSTEM WALL SHEATHING al 2x6 STUDS a 24" o.c. R19 CELLULOSE BLOWN -IN INSULATION c 1/2" DRYWALL TAPED 8 SANDED CLOSED CELL INSULATION ON ALL BAND JOISTS TO R-30 TOP OF WALL PLATE DOUBLE 2x10 WINDOW HEADER w/ 2 1/2" THK RIGID INSULATION 2x6 SIDING EXTERIOR WALL: VINYL HORIZONTAL SIDING 1-T/32" ZIP SYSTEM WALL SHEATHING TAPE ALL SHEATHING JOINTS 2x6 STUDS a 24" o.c. RIS CELLULOSE BLOWN -IN INSULATION 1/2" DRYWALL TAPED 8 SANDED TRIPLE 2x10 BAND JOIST FINISHED CRITICAL NOrjE,- TNF OVERALL 14EICil4T MUST BE VERIFIED ON O/TE SINCE TIE 140CW4T OF BU/LD/NCi6 /S CONTROLLED B r T14E C/Ti' OF N0R7'14AMP7'0N ZON/NCs. lT 614ALL BE ryE REOPONO/B/L /T i' OF rNE CONTRAC rOR TO VERIFr rNE rOTAL kE16147'u/lLL NOT VIOLATE 7'14E ZON/NCs 14SC,4 r, AFTER THE CF/L/NCs JOTS TS ARE SET DINENO/ONO 614AL1- BE CNECKEO ,AND VER/F/EO PR/OR TO 714E R/DC=E BE/N6 SET. 714E ROOF P/TC14 MA )' BE ADJUO MP /N ORDER FOR FULL COMPL /ANCE TO ZONING lO TO BE AC1IIEVS5). N m m v ro —RIDGE VENT 2x12 RIDGE BOARD 2x4 COLLAR TIE - 4 FT. LONG r INSTALL ON EVERY OTHER SET DOUBLE 2XIO WINDOW HEADER w/ 2 1/2" THK RIGID INSULATION ro 2x8 CEILING JOISTS a 16" o.c. p 1/2" DRYWALL O Q z S, FLOOR SYSTEM: Z MATCH EXISTING FINISHED FLOORING 5/8' THICK SUBFLOORING W 2x10 FLOOR JOISTS a 16" o,c, U F BEAM FLOOR SYSTEM: MATCH EXISTING FINISHED FLOORING 5/8' THICK SUBFLOORING U 2x10 FLOOR JOISTS a 16" o.c. `m z CLOSED CELL INSULATION ALL BAYS �j 1/2" P.T. PLYWOOD BELOW r W U Q P.T. 6" x 6" POST w/ TOP 8 BOTTOM POST CAPS GRAVEL/ STONE EZ PIER by EZ CRETE LLC. 12'-0" 2' I FT, I INCH = 4 FEET 10 FEET REAR WALL CfROSS SECTION FIN CEILING EXISTING FOUNDATION Z "I O U L(1 00 L(1 3 N� �c iF L O � Z Q w f� 10 l� Z to .0 O Z L U L SO V � J U z tu O` (F d) z � U H O Ld N m ~ N Q Q p I O W LL O OQ N z m W J N Nz 4 W w W z O 4 In O OZO QQm Q D~ Q Q w Wz w= W(X� QW QW LLLLYYYY Q U 4* 4 (K Q CLIECa-D 5Y: T\VN PZA\VN aY TLN SCALE JAN 2024 0 4 REV C ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" ._1'-4" .L 2x/o SUB FASCIA BOARD ow PLEASE NOTE: ALL ZNMENSIONS ARE TO BE FIELD VERIFIED SINCE EXACT OVERALL ZNMEN5/ON5 MBA r NOT BE EXACT AND THE FAC T THA T EX/6 TINE 5U/LD/N66 ARE NEITHER PWMa NOR SQUARE ADJUST ALL ZNMEN8/ON6 AS NEEOEO TO F/T FOR 74E NEW CONSTRUCTION, MEN 0 N D ROOF RAFTERS,@ 16" o.c. 1', = 30 EACH SIDE 2x(o SUB FASCIA BOARD 2x12 RIDGE BOARD 2x4 x 8 FT, LONG COLLOR TIE INSTALL ON EVERY OTHER RAFTER SET ROOF FRAMING SCALE: 1/4" = 1'-0" 1 1/4" THICK RIMBOARD ALL SIDES CEILING JOISTS 9 1/2" DP, I -JOISTS SERIES 40 I(o" o,C. QTY, = 28 1 1/4" THICK RIMBOARD ALL SIDES 2x8 RAISED PLATE TO SECURE RAFTERS TO CEILINGS FRAMING SCALE: 1/4" = 1'-0" z O N ON N 00 � d 0 z L Lv d z U 7 Ld > u- k T Z� L Z U L .J 1__IJ V v � z N r..� � U � L L`— �l O O z w U - F N. 11111111 citcKEP B'Y: TAM DRAWN aY: TAN SCALE: 1/4" = 1'-O" STAMP DATE JAN 2024 51ALF T M=T FIELD VERIFY ASPHALT SHINGLES 2 X 10 ROOF RAFTER ROOF SHEATHING --- 7 SIMPSON GBC CONNECTOR CLIP EACH SIDE OF RAFTER I 2 X S PLATE FOR RAFTER USE 2 TRUSSLOK AT EACH JOISTS. 2 -1/S" LONG PRE -FINISHED ALUMINUM GUTTER 4 EAVE FLASHING 2X6 FASCIA PRE -FINISHED VINYL SOFFIT W/ EQUALLY SPACED VENTS G-P FIBERSTRONG RIMBOARD WALL SHEA7 S 1/2" DP. I -JOISTS R-49 BLOWN -IN INSULATION 1/2" DRYWALL ON TYPICAL 2X6 EXTERIOR WALL: VINYL SIDING Il/32" ZIP WALL SHEATHING 2X6 STUD S 6 24 " ors. DOUBLE TOP PLATE SINGLE BOTTOM PLATE CLOSED CELL SPRAY INSULATION 1/2" SHEETROCK SIDING EAYE TYPICAL 2X6 EXTERIOR WALL: VINYL SIDING Il/32" ZIP WALL SHEATHING 2X6 STUDS m 24 " or — DOUBLE TOP PLATE SINGLE BOTTOM PLATE CLOSED CELL SPRAY INSULATION 1/2" SHEETROCK SEALANT AND BACKER ROD METAL FLASHING SEALANT AND BACKER ROD TYPICAL 2X6 EXTERIOR WALL: VINYL SIDING Il/32" ZIP WALL SHEATHING 2X6 STUDS Q 24 " or-, DOUBLE TOP PLATE SINGLE BOTTOM PLATE CLOSED CELL SPRAY INSULATION 1/2" SHEETROCK MATC14 EX/67/N6 rRI ` UJORK BUILT-UP HEADER INTERIOR CASING SHIMS AND INSULATION WINDOW UNIT WINDOW UNIT INTERIOR CASING 2X6 SILL PLATE SIDING WEAD AND SILL FINISH WALL AND MOISTURE BARRIER TO LAP FLASHING AT WALL -- MAINTAIN GAP BETWEEN WALL FINISH AND ROOFING TO AVOID SOAKING SIDEWALL FLASHING PROVIDE HEMMED EDGE AT FLASHING TO FORM CHANNEL SO AS TO MAINTAIN AIR GAP TO PREVENT CAPILLARY ACTION KEEP ROOFING NAILS OUT OF FLASHING ROOFING LAPS BASE FLASHING 4 INCHES BASE FLASHING WRAPS CORNERS, EXTENDS UNDER SHINGLES AT SIDES 4 INCHES AND LAPS SHINGLES AT BASE MIN, 4 INCHES FLASHING DETAILS i NOTES CEILING JOIST or ROOF TRUSS 2-2X6 ATTIC HATCH FRAME 3 LAYERS 1 1/2" RIGID INSULATION GLUED TOGETHER 1X2 STOP 1/2" DRESSED ONE SIDE PLYWOOD ATTIC HATCH INSULATION 1/2" DRYWALL ON POLY VAPOR BARRIER ATTIC HATCH z NZZI O � N 00 111 � d O Ld Q Ld t _O Z ',Q Lu U t � U Ld N U z A w Q cA Lu Ld U � L �r N � W W oQ �o aQ W 3 O >O z �o CLIECICED SY: TAN I DRAWN aY: TAN SCALE: 1/4" = V-0" STAMP DATE: JAN 2024