Loading...
181 Wton Rd basement 2019SSSSWH EXT 2412EXT 2412 EXT 2412 EXT 2668 EXT 3068 UP UP Home Alarm Control Unit EP Electrical Panel 26'-8"34'-9"13'-10"9'-4"20'-10"13'-1" 9'-4" 13'-1"2'-8"3'-5 1/2"5'-1" FURNACE DUCT WORK BOTTOM HEIGHT 6' - 6" CEILING BEAM BOTTOM HEIGHT 6' - 7" GARAGE C.H. : 7' - 8" STORAGE C.H. : 7' - 3 3/4"Valley Home Improvement, Inc.340 Riverside Drive, PO Box 60627, Northampton, MA 01062Office Phone 413.584.7522 Fax 413.585.0820Find us on the web at : www.ValleyHomeImprovement.com3181 WESTHAMPTON RD.NORTHAMPTON,MA 01060DRAWN BY: JTPDATE:8/1/2019SCALE: SEE VIEWSHEET NUMBERLEVINERevision #:0FLOOR PLAN 5/16"=1'This plan is the proprietary work product of Valley Home Improvement, Inc.(VHI). It is delivered for the limited and exclusive purpose of supporting the contract bid of VHI, and customer agrees that the elements of this plan shall not be republished or presented in anyform for the purpose of enabling or supporting the work of competing project contractors without the permission of, and compensation paid to, VHI.EXISTINGCONDTIONS SSSSWH EXT 2412EXT 2412 EXT 2412 EXT 2668 EXT 8062 EXT 2068EXT 2668UP UP 26'-8"13'-10"20'-10"12'-11 1/2"2'-0"12'-6" 6'-0"5'-5 1/2"FURNACE SOFFIT BOTTOM HEIGHT 6' - 5" CEILING BEAM BOTTOM HEIGHT 6' -5" GARAGE C.H. : 7' - 8" C.H. : 7' - 3 3/4" CONCRETE CUT CONCRETE FLOOR FOR INSTALLATION OF EJECTOR PUMP FOR BASEMENT BATHROOM POUR NEW CONCRETE OVER NEW PLUMBING FRAMING 2X4 16” O.C. STUD FRAME WALLS USING PT ON BASE PLATES WITH 2” AIR GAP OFF FOUNDATION WALL FRAME AROUND DUCTWORK ROOFING AND SIDING PATCH SIDING AT BATH FAN VENT PLUMBING INSTALL ROUGH PLUMBING UNDER CONCRETE SLAB, TIE INTO EXISTING SEWAGE LINE. INSTALL (1) AKER S-36 ALCOVE, 36”X36”, WHITE, FIBERGLASS SHOWER UNIT. INSTALL (1) DELTA R10000 UNIVERSAL ROUGH-IN SHOWER VALVE. INSTALL (1) DELTA MONITOR 17T SERIES T17T238 SHOWER TRIM WITH CHROME FINISH. INSTALL (1) DELTA LAHARA 538-DST, SINGLE HANDLE, DECK MOUNT FAUCET WITH CHROME FINISH. INSTALL (1) TOTO DRAKE 2, WHITE, ELONGATED, COMFORT HEIGHT TOILET WITH SOFTCLOSE SEAT SS114 SEAT. EJECTOR PUMP INSTALLED IN MECHANICAL ROOM MOVE GAS LINE TO BOTTOM OF FLOOR JOISTS INSULATION INSTALL 2” OF CONTINUOUS XPS RIGID FOAM DIRECTLY TO CONCRETE BEFORE FRAMING SHEETROCK & ACOUSTICAL CEILING ½ DRYWALL INSTALLED THROUGHOUT FAMILY ROOM ½” MOISTURE RESISTANT DRYWALL IN BATHROOM GARAGE IS ASSUMED TO BE FIRE TAPED AND NO WORK IS REQUIRED INSTALL 2’X4’ PRIME/ PAINT ONE COAT OF PRIMER ON ALL WALLS; READY FOR FINISH PAINTING FLOORING INSTALL VAPOR BARRIER UNDERLAYMENT IN BOTH BATHROOM AND REC ROOM INSTALL FLOATING LVT FLOORING IN FAMILY ROOM AND BATHROOM CABINETS INSTALL NEW PAINTED WHITE MAPLE SHAKER STYLE VANITY INSTALL WALL HUNG MIRRORED MEDICINE CABINET ABOVE VANITY INTERIOR TRIM 1X4 PRIMED FJP FLAT STOCK DOOR AND WINDOW CASINGS 1X6 PRIMED FJP FLAT STOCK BASEBOARDS INTERIOR DOORS/ LOCKSETS SOLID CORE 2/6 X 6/6, 6-PANEL WHITE INTERIOR DOOR 30” FOR BATHROOM SOLID CORE 6-PANEL BIFOLD DOORS TO MECHANICAL CLOSET ACCESSORIES INSTALL (1) DELTA LAHARA 24” TOWEL BAR, (1) TOILET PAPER HOLDER, (1) ROBE HOOK AND (1) TOWEL RING IN CHROME FINISHES. COUNTERTOPS INSTALL QUARTZ COUNTERTOP WITH INTEGRATED SINK IN VANITY DEMOBILIZATION REMOVE AND DISPOSE OF ALL CONSTRUCTION DEBRIS AND MATERIALS CLEAN UP Valley Home Improvement, Inc.340 Riverside Drive, PO Box 60627, Northampton, MA 01062Office Phone 413.584.7522 Fax 413.585.0820Find us on the web at : www.ValleyHomeImprovement.com4181 WESTHAMPTON RD.NORTHAMPTON,MA 01060DRAWN BY: JTPDATE:8/1/2019SCALE: SEE VIEWSHEET NUMBERLEVINERevision #:0This plan is the proprietary work product of Valley Home Improvement, Inc.(VHI). It is delivered for the limited and exclusive purpose of supporting the contract bid of VHI, and customer agrees that the elements of this plan shall not be republished or presented in anyform for the purpose of enabling or supporting the work of competing project contractors without the permission of, and compensation paid to, VHI.FLOOR PLAN 5/16"=1'MAIN FLOOR PLAN SSSSWH UP UP Home Alarm Control Unit Exhaust (light) R4 R4 33 R4 R4 R4 EP Electrical Panel R4 R4R4 R4 R4 R4 R4 R4 3 Three Way3 Three Way 3 Three WayDuplex 110V Duplex110V Duplex110V Duplex 110V Duplex 110V Duplex110V Duplex110V Duplex 110V Duplex C5/TV CAT5 w/ TV3 Three Way T Thermostat T Thermostat26'-8"13'-10"20'-10"12'-11 1/2"2'-0"12'-6" 6'-0"5'-5 1/2"GARAGE ELECTRICAL 13 LED RECESSED LIGHTS OUTLETS TO CODE 4 SWITCHES, 2 DIMMERS PANASONIC 110 CFM FAN/LIGHT TIMER ON VENT FAN/LIGHT IN BATHROOM INSTALL ELECTRIC BASE BOARD HEAT IN BATHROOM AND FAMILY ROOM AREA INSTALL OUTLET FOR SEWAGE EJECTION PUMP NO WORK TO ALARM SYSTEM Valley Home Improvement, Inc.340 Riverside Drive, PO Box 60627, Northampton, MA 01062Office Phone 413.584.7522 Fax 413.585.0820Find us on the web at : www.ValleyHomeImprovement.com5181 WESTHAMPTON RD.NORTHAMPTON,MA 01060DRAWN BY: JTPDATE:8/1/2019SCALE: SEE VIEWSHEET NUMBERLEVINERevision #:0This plan is the proprietary work product of Valley Home Improvement, Inc.(VHI). It is delivered for the limited and exclusive purpose of supporting the contract bid of VHI, and customer agrees that the elements of this plan shall not be republished or presented in anyform for the purpose of enabling or supporting the work of competing project contractors without the permission of, and compensation paid to, VHI.ELECTRICAL, DATA,& AUDIO PLANELECTRICAL PLAN - MAIN FLOOR 5/16"=1'