199 Pine Street Permit DrawingsA-1
Rev Date Description
Project Title
Proposed Renovations for
PIONEER VALLEY
BOOKS
199 Pine Street
Leeds, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 11/14/2019 Permitting
Sheet Title
Scale:
11/14/2019
JPB
JPB
19-044
AS NOTED
PERMITTING - 11/14/2019
PROPOSED
ELEVATION &
DETAILS
$7/$6&21&5(7(352'8&76
ZZZ$WODV&RQFUHWHFRP
%XUULWW6W
1HZ%ULWDLQ&7
)RXQGDWLRQ6XSSRUWE\$WODV
,QFOXGHGZLWK6WHS
,WHP&OEV
&KDPIHU
7\S
5HFRPPHQGHG3UHFDVW'HFN3LHU
6ROG6HSHUDWHO\1RWH7RSVWHSPD\YDU\EHWZHHQWR,629LHZ
6FDOH176
7RS9LHZ
6FDOH
5LJKW6LGH9LHZ
6FDOH
)D[
:LGH[5LVH
&RPPHUFLDO6WHS
PARTIAL ELEVATION AT LOADING DOCK
Scale: 1/4" = 1'-0"1
116 Pleasant StreetSuite 331Easthampton, MA 01027Phone: 1-413-529-9434Fax: 1-413-529-9434SIEGFRIED PORTH ARCHITECTL-1 SITE PLAN199 PINE STREET - RENOVATIONFLORENCE, MASite Plan
Scale - 1:30020'100'5'10'50'200'
N
PINE STR
E
E
T CORTICE
L
L
I
STREE
T
CORTICELLI STREETN
O
N
O
T
U
C
K
ST
R
E
E
TMILL RIVER199 PINE STREET
87,059 GROSS SQUARE
FEET
SEE PLAN ON SHEET A1
221 PINE STREET
277-299
NONOTUCK
STREET
159 PINE
STREET
9 CORTICELLI
STREET
LOADI
N
G
DOCK
EXISTING OPENINGS TO221 PINE STREET ARE
PERMANENTLY LOCKEDAND NOT A MEANS OFEGRESS FOR EITHER
BUILDING
1
AREA OF
WORK
116 Pleasant Street
Suite 331
Easthampton, MA 01027
Phone: 1-413-529-9434
Fax: 1-413-529-9434
SIEGFRIED PORTH ARCHITECT
L-1SITE PLAN
199 PINE STREET - RENOVATION
FLORENCE, MASite PlanScale - 1:30020'100'5'10'50'200'NPINE STREETCORTICELLI STREETCORTICEL
L
I
S
T
R
E
E
TNONOTUCKSTREET MILL RIVER
199 PINE STREET87,059 GROSS SQUAREFEETSEE PLAN ON SHEET A1221 PINE STREET277-299NONOTUCKSTREET159 PINESTREET9 CORTICELLISTREETLOADINGDOCK EXISTING OPENINGS TO221 PINE STREET AREPERMANENTLY LOCKEDAND NOT A MEANS OFEGRESS FOR EITHERBUILDING1
116 Pleasant Street
Suite 331
Easthampton, MA 01027
Phone: 1-413-529-9434
Fax: 1-413-529-9434
SIEGFRIED PORTH ARCHITECT
A-5RACK STORAGE PLAN
199 PINE STREET - RENOVATION
FLORENCE, MAStorage Rack PlanScale - 116" = 1'-0"4'-0"8'-034" AISLE8'-6"49'-214" CLEARBETWEEN COLUMNS8'-034" AISLE8'-6"8'-034" AISLE4'-0"4'-0"7'-6" AISLE8'-6"7'-534" AISLE8'-6"7'-534" AISLE4'-0"47'-512" CLEARBETWEEN COLUMNS50'-0"AISLE MAX11'-6"AISLE100'-0" MAX100'-0" MAX11'-6"AISLE50'-0"AISLE MAXMAINTAIN 7'-6" MINIMUM HEADROOMAT CROSS AISLES PER CODE,VERIFY CLEARANCE FOR STORAGECONVEYANCE EQUIPMENT11'-414"AISLECLASS 3 COMBUSTIBLE STORAGE - BOOKSMAX RACK HEIGHT = (SPRINKLER HEAD HEIGHT - 1'-6") ~ 20'-0" (VERIFY)RACK STORAGE AREA < 32,000 SFMAXIMUM EGRESS TRAVELDISTANCE ~240'2100'-0" MAX100'-0" MAX100'-0" MAX6"
Vreeland Design Associates Date: __________ Sht._____ of _____.
An integrative approach to design, engineering and site planning
116 River Road, Leyden, MA 01337 Phone: (413) 624-0126
Email: dvreeland@verizon.net Fax: (413) 624-3282
Re: Pioneer Valley Books, 199 Pine St, Florence, MA: Proposed CMU wall enclosing existing loading dock.
Vreeland Design Associates Date: __________ Sht._____ of _____. An integrative approach to design, engineering and site planning
116 River Road, Leyden, MA 01337 Phone: (413) 624-0126
Email: dvreeland@verizon.net Fax: (413) 624-3282
Re: Pioneer Valley Books, 199 Pine St, Florence, MA: Proposed CMU wall enclosing existing loading dock.
39'
11'-1/2"
EXISTING LOADING DOCK
8'9'
6'
8'
4'
EXISTING STEEL I-BEAM
2'11'-8"11'-8"11'-9"1'-11"
EXISTING MASONRYEND WALL AND CORNERSUPPORTING BEAM
4" STEEL POST 4" STEEL POST
Version 01_01_2018
Initial Construction Control Document
To be submitted with the building permit application by a
Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Pioneer Valley Books – Loading Dock Enclosure Date: 11/20/19
Property Address: 199 Pine St, Florence, MA
Project: Check (x) one or both as applicable: X New construction X Existing Construction
Project description: Construction of a non-load bearing 8” CMU enclosure under an existing steel beam that
supports the roof over the existing loading dock.
I, David Vreeland, MA Registration Number: 46317, Expiration date: 6/30/2020, am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning1:
Architectural X Structural Mechanical
Fire Protection Electrical X Other: Construction Control
for the above named project and that to the best of my knowledge, information, and belief such plans,
computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780
CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my
designee) shall perform the necessary professional services and be present on the construction site on a regular
and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work is being performed in a manner consistent
with the approved construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a ‘Final Construction Control Document’.
Enter in the space to the right a “wet” or
electronic signature and seal:
Phone number: 413-624-0126 Email: dvreeland@verizon.net
Building Official Use Only
Building Official Name: Permit No.: Date:
Vreeland Design Associates Date: __________ Sht._____ of _____.
An integrative approach to design, engineering and site planning
116 River Road, Leyden, MA 01337 Phone: (413) 624-0126
Email: dvreeland@verizon.net Fax: (413) 624-3282
Re: Pioneer Valley Books, 199 Pine St, Florence, MA: Proposed CMU wall enclosing existing loading dock.
Vreeland Design Associates Date: __________ Sht._____ of _____. An integrative approach to design, engineering and site planning
116 River Road, Leyden, MA 01337 Phone: (413) 624-0126
Email: dvreeland@verizon.net Fax: (413) 624-3282
Re: Pioneer Valley Books, 199 Pine St, Florence, MA: Proposed CMU wall enclosing existing loading dock.
39'
11'-1/2"
EXISTING LOADING DOCK
8'9'
6'
8'
4'
EXISTING STEEL I-BEAM
2'11'-8"11'-8"11'-9"1'-11"
EXISTING MASONRYEND WALL AND CORNERSUPPORTING BEAM
4" STEEL POST 4" STEEL POST