32A-122 (22) L• 3d/9 /d
Northampton Fire
' Department
x
Memorandum E 11
To: Tony Patillo ; MAY 3 0 2003 ! L.
From: Duane Nichols _. .. J
DEPT OF 61J LQ'M'G Ir,S2FC
Date: May 29, 2003 NORTHAITION,P"
CC: Brian Duggan
Re: 67 King St. Northampton Cooperative Bank
Secondary to a review of the plans and fire protection narrative submitted to me for
review, I concur with the issuance of a building permit subject to the following
conditions:
• Duct detectors shall be clearly labeled, with test switches located by Fire
Department when appropriate time for installation.
• A graphic representation of the structure needs to be installed at the Fire
Alarm Control Panel and/or Fire Alarm Annunciator Panel. The structural
members should be outlined in black and each fire alarm device should be
outlined in red. Points of egress should be indicated with blue shading, if the
building is multi-storied floors should be shown one above another. The
building name and address should be posted at the top of map.
• Pull stations referenced in the fire protection narrative are to be of the double
action type.
• Page 1
r ►
• A Fire Alarm Annunciator panel or Fire Alarm Control panel needs to be
located at the front entrance. All panels need to be clearly marked with red
engraved signage with one-inch white lettering clearly identifying panel.
• 5 lb ABC Fire extinguishers are needed, which should be located under pull
stations at each exit, in compliance with NFPA relative to maximum travel
distance. Appropriate signage in compliance with ADA should be located
above.
• Alarm verification must be active on all smoke detection zones.
• Installation of referenced items in fire protection narrative shall be in
compliance with the Northampton Fire Department Fire Prevention Features
for New Construction/Renovations.
• The Central Station monitoring service must be UL listed, FM approved
service.
• Page 2