Loading...
23B-046 Cooley Dickinson DPW Stormwater Permits and amendments~. - & - - -- - - - STORMWATER MANAGEMENT PERMIT- ~ ~. ., Amendment to Permit City of Northampton Department of Public Works Project Name /Permit #: Cooley Dickinson Hospital - Sur~;ical Center (Permit # SWP 05006 Project Street or Location /Assessor ID: 30 Locust St. / 23B-046 Applicant Name: Norm Welch c/o Cooley Dickinson Hospital Applicant Address/Phone: 30 Locust St., Northampton / 413-582-2312 ~ Amendment Submission Date: 3/26/2008 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: X Approval of the Stormwater Management Permit Amendment. Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development of the proposed 18 Space Parking Area Expansion shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit amendment. a. Cooley Dickinson Hospital Parking Area Expansion, Site Plans, Sheets C-1 to C- 4, stamped and dated 2/28/2008 by John Furman, P.E., Vanasse Hangen Brustlin, Inc. b. Stormwater Drainage Calculations for the main hospital campus, dated 3/24/2008 by Vanasse Hangen Brustlin, Inc. 2. All clearing, grading, drainage, construction, and development of the Cooley Dickinson Hospital Surgical Center Project shall be conducted in strict accordance with the plans, E:\Stormwater Permits\Permits_Active\Locust Street\CDH\CDH Surgical Center\0030 Locust St -Cooley Dickinson Surgical Center_Amendment 2.doc Page 1 of 2 - information, and conditions specified in the Stormwater Management Permit Approval dated 2/3/2005 and as amended by the above referenced plans and information. Qr~ Date cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development E:\Stormwater Permits\Permits_Active\I-ocust Street\CDH\CDH Surgical Center\0030 Locust St -Cooley Dickinson Surgical Center_Amendment 2.doc Page2of2 9 a' ,, ~ ~ ~ City of Northampton Department of Public Works Amendment to Permit Project Name /Permit #: Coolev Dickinson Hospital - Surgical Center (Permit # SWP 05006) Project Street or Location /Assessor ID: 30 Locust St. / 23B-046 Applicant Name: Richard Corder c/o Coolev Dickinson Hospital Applicant Address/Phone: 30 Locust St., Northam>7ton / 413-582-2216 Amendment Submission Date: 3/6/2006 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development of the proposed Wood Chip Heating Facility Expansion shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit amendment. a. Cooley Dickinson Hospital -Wood Chip Heating Facility Expansion, Site Plans, Sheets C-1 to C-5, revised 12/2/2005 by Vanasse Hangen Brustlin, Inc. b. Stormwater Management Report for the Woodchip Heating Facility Expansion dated December 5, 2005 by Vanasse Hangen Brustlin, Inc. c. Stormwater Management Permit Narrative, Wood Chip Heating Plant (Amended) attached to the Stormwater Management Pernit Application. 2. All clearing, grading, drainage, construction, and development of the Cooley Dickinson Hospital Surgical Center Project shall be conducted in strict accordance with the plans, STORMWATER MANAGEMENT PERMIT \\smb 1 \common\Dropbox\Doug McDonald\0030 Locust St -Cooley Dickinson Surgical Center Amendment 1.doc Page 1 of 1 - .. information, .and conditions specified in the Stormwater Management Permit Approval dated 2/3/2005 and as amended by the above referenced plans and information and conditions attached to this permit amendment. Specific Permit Conditions: 1. Due to the proposed increased flows to the drainage system adjacent to the Wood Chip Heating Facility, the applicant shall install additional measures approved by the Northampton DPW (i.e. rip rap or appropriate alternatives) to stabilize the area below the reconstructed 18 inch outfall located to the east of the "New Cooling Tower" as shown on sheet C-4. 2. This project will require an amendment to the existing Stormwater Pollution Prevention Plan (SWPPP) for the Surgical Center Project. Copies of the amended SWPPP shall be submitted to the Northampton DPW prior to issuance of a building permit. ~ ~~ 06 Signature of City En ' eer Date cc._ Planning Board c/o Office of Planning and Development. Building Department Conservation Commission c/o Office of Planning and Development \\smbl\cominon\Dropbox\Doug McDonald\0030 Locust St -Cooley Dickinson Surgical Center Amendment l.doc Page 2 of 2 - _ - - _ _