23B-046 Cooley Dickinson DPW Stormwater Permits and amendments~. - & - - -- - - - STORMWATER MANAGEMENT PERMIT-
~ ~.
.,
Amendment to Permit
City of Northampton
Department of Public Works
Project Name /Permit #: Cooley Dickinson Hospital - Sur~;ical Center (Permit # SWP 05006
Project Street or Location /Assessor ID: 30 Locust St. / 23B-046
Applicant Name: Norm Welch c/o Cooley Dickinson Hospital
Applicant Address/Phone: 30 Locust St., Northampton / 413-582-2312 ~
Amendment Submission Date: 3/26/2008
THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC
WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN
ACTIVE PERMIT BASED ON INFORMATION PRESENTED:
X Approval of the Stormwater Management Permit Amendment.
Approval of the Stormwater Management Permit Amendment subject to any
conditions, modifications or restrictions required by the Department of
Public Works (see below)
Disapproval of the Stormwater Management Permit Amendment based upon
a determination that the proposed plan, as submitted, does not meet the
purposes set forth in the Northampton Stormwater Management.
Standard Permit Conditions:
1. All clearing, grading, drainage, construction, and development of the proposed 18 Space
Parking Area Expansion shall be conducted in strict accordance with the following plans
and information submitted with the application and as amended by any conditions
attached to this permit amendment.
a. Cooley Dickinson Hospital Parking Area Expansion, Site Plans, Sheets C-1 to C-
4, stamped and dated 2/28/2008 by John Furman, P.E., Vanasse Hangen Brustlin,
Inc.
b. Stormwater Drainage Calculations for the main hospital campus, dated 3/24/2008
by Vanasse Hangen Brustlin, Inc.
2. All clearing, grading, drainage, construction, and development of the Cooley Dickinson
Hospital Surgical Center Project shall be conducted in strict accordance with the plans,
E:\Stormwater Permits\Permits_Active\Locust Street\CDH\CDH Surgical Center\0030 Locust St -Cooley Dickinson Surgical
Center_Amendment 2.doc
Page 1 of 2 -
information, and conditions specified in the Stormwater Management Permit Approval
dated 2/3/2005 and as amended by the above referenced plans and information.
Qr~
Date
cc. Planning Board c/o Office of Planning and Development
Building Department
Conservation Commission c/o Office of Planning and Development
E:\Stormwater Permits\Permits_Active\I-ocust Street\CDH\CDH Surgical Center\0030 Locust St -Cooley Dickinson Surgical
Center_Amendment 2.doc
Page2of2
9
a'
,, ~
~ ~
City of Northampton
Department of Public Works
Amendment to Permit
Project Name /Permit #: Coolev Dickinson Hospital - Surgical Center (Permit # SWP 05006)
Project Street or Location /Assessor ID: 30 Locust St. / 23B-046
Applicant Name: Richard Corder c/o Coolev Dickinson Hospital
Applicant Address/Phone: 30 Locust St., Northam>7ton / 413-582-2216
Amendment Submission Date: 3/6/2006
THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC
WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN
ACTIVE PERMIT BASED ON INFORMATION PRESENTED:
Approval of the Stormwater Management Permit Amendment.
X Approval of the Stormwater Management Permit Amendment subject to
any conditions, modifications or restrictions required by the Department of
Public Works (see below)
Disapproval of the Stormwater Management Permit Amendment based upon
a determination that the proposed plan, as submitted, does not meet the
purposes set forth in the Northampton Stormwater Management.
Standard Permit Conditions:
1. All clearing, grading, drainage, construction, and development of the proposed Wood
Chip Heating Facility Expansion shall be conducted in strict accordance with the
following plans and information submitted with the application and as amended by any
conditions attached to this permit amendment.
a. Cooley Dickinson Hospital -Wood Chip Heating Facility Expansion, Site Plans,
Sheets C-1 to C-5, revised 12/2/2005 by Vanasse Hangen Brustlin, Inc.
b. Stormwater Management Report for the Woodchip Heating Facility Expansion
dated December 5, 2005 by Vanasse Hangen Brustlin, Inc.
c. Stormwater Management Permit Narrative, Wood Chip Heating Plant (Amended)
attached to the Stormwater Management Pernit Application.
2. All clearing, grading, drainage, construction, and development of the Cooley Dickinson
Hospital Surgical Center Project shall be conducted in strict accordance with the plans,
STORMWATER MANAGEMENT PERMIT
\\smb 1 \common\Dropbox\Doug McDonald\0030 Locust St -Cooley Dickinson Surgical Center Amendment 1.doc
Page 1 of 1 -
..
information, .and conditions specified in the Stormwater Management Permit Approval
dated 2/3/2005 and as amended by the above referenced plans and information and
conditions attached to this permit amendment.
Specific Permit Conditions:
1. Due to the proposed increased flows to the drainage system adjacent to the Wood Chip
Heating Facility, the applicant shall install additional measures approved by the
Northampton DPW (i.e. rip rap or appropriate alternatives) to stabilize the area below the
reconstructed 18 inch outfall located to the east of the "New Cooling Tower" as shown
on sheet C-4.
2. This project will require an amendment to the existing Stormwater Pollution Prevention
Plan (SWPPP) for the Surgical Center Project. Copies of the amended SWPPP shall be
submitted to the Northampton DPW prior to issuance of a building permit.
~ ~~ 06
Signature of City En ' eer Date
cc._ Planning Board c/o Office of Planning and Development.
Building Department
Conservation Commission c/o Office of Planning and Development
\\smbl\cominon\Dropbox\Doug McDonald\0030 Locust St -Cooley Dickinson Surgical Center Amendment l.doc