Loading...
38B-133 BP-2024-0012 15 STEARNS CT COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 38B-133-001 CITY OF NORTHAMPTON Permit: Exterior Res PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2024-0012 PERMISSION IS HEREBY GRANTED TO: Project# roof 2023 Contractor: License: PEAK PERFORMANCE ROOFING Est.Cost: 10445 LLC CS-103061 Const.Class: Exp.Date: 09/21/2024 Use Group: Owner: CO-TRUSTEES KNAPP KARL E& KARI S KNAPP Lot Size(sq.ft.) Zoning: URB Applicant: PEAK PERFORMANCE ROOFING LLC Applicant Address Phone: Insurance: 1 LOVEFIELD ST 413-203-5888 R2WC342657 EASTHAMPTON, MA 01027 ISSUED ON: 01/05/2024 TO PERFORM THE FOLLOWING WORK: STRIP AND REROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: l/ {yam■J"{) I l �I J'wJ • V Fees Paid: S100.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 Versionl.7 Commercial Building Permit May 15,2000 Department use only -_ City of Northampton Status of Permit: .,C $_� p� wilding Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability JAN _ I Room 100 Water/Well Availability 4 2024 /Norfampton,� MA 01060 Two Sets of Structural Plans t9_ phonerl413-y587-1240 Fax 413-587-1272 Plot/Site Plans FAT o Nnr?tNaf1:y4 pr^o rn�cpFoTr J Other Specify APPLICATION'TT } 8TRUCT; REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Map Lot Unit 15 Stearns Court Northampton Zone Overlay District Elm St. District CB District SECTION 2 -PROPERTY OWNERSHIP/AUTHORIZED AGENT ;2.1 Owner of Record: 15 Stearns Court., Northampton Name(Print) Karl Knapp Current Mailing Address: f DoJSg dby 413-585-0209 Sig acre,ore as6P Telephone 2.2 Authorized Agent: James J. Flannery/ Peak Performance Roofing LLC 1 Lovefield St., Easthampton MA 01027 Name(Print) Current Mailing Address: 413-203-5888 (an^,OS (algv2Xtt Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 10445 (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from (6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 1 5. Fire Protection 6. Total = (1 + 2 + 3 +4 + 5) 10445 Check Number itq This Section For Official Use Only Building Permit Number Date 2 / / -7 Issued Signature: 1/7 /- 6- 2OZ9 Building Commissioner/Inspector of Buildings Date DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 Versionl.7 Commercial Building Permit May 15,2000 SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations El Existing Wall Signs El Demolition❑ Repairs 0 Additions El Accessory Building El Exterior Alteration El Existing Ground Sign 0 New Signs El Roofing D Change of Use❑ Other El Brief Description Strip and replace asphalt roof on four family property. Of Proposed Work: SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP (Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 0 A-2 ❑ A-3 El1A I 0 A-4 ❑ A-5 ❑ 1 B 0 B Business ❑ 2A ❑ E Educational ❑ 2B ❑ F Factory ❑ F-1 El F-2 ❑ 2C ❑ H High Hazard 0 3A ❑ I Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 3B ❑ M Mercantile 0 4 ❑ R Residential ❑ R-1 ❑ R-2 El R-3 El 5A ❑ S Storage 0 S-1 ❑ S-2 El 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS, ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) 1st I-- .„_,,, nd 29d t. . ... _ ._ 3rd ,.,_,a,...�,.� — _......�.»...o_...,.� —„ 3rd ._......�...,.._..._.,.. ...,.,.--- ..,., 4th �. �._.. 4m �_ Total Area (sf) 1 .... Total Proposed New Construction (sf) Total Height(ft) Total Height ft 7. Water Supply(M.G.L. c.40, § 54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public ❑ Private 0 Zone Outside Flood Zone❑ Municipal El On site disposal system DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 Versionl.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage ... �s Setbacks Front -1 Side L: R: -.. Rear Building Height 7""""" Bldg. Square Footage Open Space Footage (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO x DON'T KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YEsnl IF YES: enter Book Page and/or Document # B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained ® Obtained 0 , Date Issued: C. Do any signs exist on the property? YES I NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YEr." NO t ! IF YES, describe size, type and location: E. Will the construction activity disturb clearing, gradin excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 Versionl.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116 (CONTAINING MORE THAN 35,000 C.F. OF ENCLOSED SPACE) 9.1 Registered Architect: Not Applicable tir Name(Registrant): Registration Number Address Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor Peak Performance Roofing, LLC Not Applicable m Company Name: James J. Flannery Responsible In Charge of Construction 1 Lovefield St., Easthampton, MA 01027 Address Rouverw 413-203-5888 Signature Telephone DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 Versionl.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes EJ No fli7 SECTION 11 -OWNER AUTHORIZATION -TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Karl Knapp , as Owner of the subject property hereby authorize James J. Flannery / Peak Performance Roofing, LLC to act on my behalf, in all matters relative to work authorized by this building permit application. �—Docu5i9n d 6y: 12/26/2023 Siglawner Date James J. Flannery / PEAK PERFORMANCE ROOFING LLC as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. James J. Flannery Print Name afti^•e5arrent 12/21/2023 Signature of Owner/Agent Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable D Name of License Holder: James J. Flannery CS-103061 License Number Holyoke, MA 01040 09/21/2024 Address Expiration Date �ame� k?arner 413-203-5888 Signature Telephone SECTION 13 -WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L. c. 152, §25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the bui ing permit. Signed Affidavit Attached Yes No El DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 The Roofing Process : What to Expect When will my roof be scheduled? Once the contract, deposit, and building permit are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of our crew is a priority. We must work around the weather forecast; here in New England, this means we can't plan our schedule very far in advance, and can't promise specific installation dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and patience in our dealings with Mother Nature! Your project manager will contact you a few days before they wish to proceed. Our crews are hardworking and efficient; most residential installations take only 1-2 days to install. Do I need to do anything to prepare? As noted on your contract, we are not responsible for dirt/debris that may fall into the attic. Depending on the condition of the plywood, you may see little to no debris, or it could be more substantial. If you store items in the attic, we recommend covering with plastic sheeting. Do I need to notify my neighbors? If your home is extremely close to other homes or driveways, there's a possibility we may need to be on their property temporarily to lay protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a courtesy. Your neighbors will likely appreciate notification of the noise/traffic. Materials and Dumpster Delivery: The materials and dumpster may arrive the day before the scheduled installation (especially if your installation is taking place on a weekend). Depending on your home's layout and driveway(s), we may need vehicles moved at this point. Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL driveways, and away from the house, to avoid any damage, and for our access. How early will you start? Our crews will begin as early as 7.30am. They will work a long day, often until dark if necessary. We aim to have the installation completed in as few days as possible to minimize disruption to you and your neighbors. Do I need to be home? It's up to you. Some customers like to keep an eye on what's going on. Others would rather not be home because of the noise. Be aware that roofing is loud (banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets. Please do not plan on outdoor activities while we are working, for safety's sake. Please keep pets inside, or on a leash away from the roofing activities. DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 What if I have an urgent question? If you have an urgent issue outside of regular office hours, call or text your project manager directly on his cell. Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying sheathing. Your contract states we will replace a small amount of plywood at no additional cost if needed. If more serious issues are found, the project manager will contact you to explain. There may need to be an upcharge on the final bill, consistent with the per sheet or square foot amount quoted in your estimate. Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done, we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew may need to leave before cleaning up, or if the job ends midday, they may leave to start another job. Another staff person will come later or the next day for more cleaning. There are materials left over. Did I get charged for those? Your job is priced according to the measurements. We always bring extra material for the jobsite, just to be safe. You were not charged for those and we will be collecting them. One of our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days. When will the dumpster be removed? The dumpster is usually removed the next business day after the main crew has finished. Weekends or holidays may delay pickup. The dumpster company should check for any debris after removal, but please do a visual check before walking or driving over the area where the dumpster was located. If you see any debris there, please let us know. The job is done but I have concerns, what should I do? Please be aware that even after the main installation crew has left, that doesn't mean our job is done. The project manager will be coming by as soon as possible to do a final inspection, and a staff person will come by to do a final sweep, and pickup leftover items. Depending on our schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days after main installation is complete. If you have any other questions, please let us know. Thank you for choosing Peak Performance Roofing! We will do our very best to make this major home improvement a smooth experience for you! ,--Docu S,gned by' 644, .1^,^ff, 12/26/2023 '—F87BAO6DF78i4C5.. 1 Lovefield St., Easthampton MA 01027 p , PERFOR CE 413203588E M F9am4pm ROOFING peakperformanceroofinglIc@gmail.com The Commonwealth of Massachusetts A- a Y _ Department of Industrial Accidents e; 1 Congress Street, Suite 100 f Boston, MA 02114-2017 ,�e'`( www mass.gov/dia to Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): PEAK PERFORMANCE ROOFING, LLC Address: 1 LOVEFIELD STREET City/State/Zip: EASTHAMPTON, MA 01027 Phone#:413-203-5888 Are you an employer?Check the appropriate box: Type of project(required): LEI I am a employer with 4 employees(full and/or part-time).* 7. ❑ New construction 2.0 I am a sole proprietor or partnership and have no employees working for me in 8. 0 Remodeling any capacity.[No workers'comp.insurance required] 3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. ❑Demolition 10 ❑ Building addition 4.0 I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 1 1.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.0 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.is Roof repairs These sub-contractors have employees and have workers'comp.insurance.t 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14. Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:BERKSHIRE HATHAWAY GUARD Policy#or Self-ins.Lic.#: R2WC202869 Expiration Date:04/27/2024 Job Site Address: 15 Stearns Court City/State/Zip: Northampton, MA Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: James J Flannery Date: 12/26/2023 Phone#:413-203-5888 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: 15 Stearns Court The debris will be transported by: Aaron's 24/7 Towing and Roll-On The debris will be received by: Valley Recycling Building permit number: Name of Permit Applicant Peak Performance Roofing LLC/James Flannery 12/26/2023 James Flannery Date Signature of Permit Applicant DocuSign Envelope ID:0FF229F8-COE5-469C-86DB-995B6B755C70 Peak Performance Roofing LLC 1 Lovefield St. p E K. Easthampton, MA 01027 413-203-5888 PERFOR CE peakperformanceroofingllc@gmail.com ROOFING MA HIC#183698 MA CSL#103061 Contract ADDRESS CONTRACT# 11163 Karl Knapp DATE 12/21/2023 15 Stearns Court Northampton karlknapp123@gmail.com 413-585-0209 JOB LOCATION 15 Stearns Court, Northampton DESCRIPTION Peak Performance Roofing will provide the labor and materials to perform the following: 1. Remove the existing roofing shingles. 2. Inspect the sheathing for any rot or deterioration. Any new plywood necessary will be $60 per sheet installed.*** Any new roofing boards will be $6 per foot installed. (Wood prices subject to change based on market fluctuations) 3. Install six feet of ice and water shield on eaves, three feet in any valleys, and three feet around all penetrations. 4. Cover remaining roof with synthetic underlayment. 5. Install new 8" aluminum drip edge on all eaves and rake edges. 6. Install architectural shingles by CertainTeed: LANDMARK: COBBLESTONE GRAY http://www.certainteed.com/residential-roofing/products/landmark/ 7. Install Shingle Vent 11 ridge vent on peaks of roof(where applicable). https://www.certainteed.com/residential-roofing/products/certainteed-ridge-vent-12-filtered/ 8. Complete all necessary flashings including new LIFETIME pipe boots and base flashing around chimney. Remove all debris from premises, and throughout the job, continue cleanup and keep the premises undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO ATTIC/INTERIOR. DocuSign Envelope ID: 0FF229F8-COE5-469C-86DB-995B6B755C70 DESCRIPTION Please use reasonable caution during the installation process: do not walk or drive under active work or on areas of potential roofing debris. Installations are weather permitting; inclement weather will cause scheduling delays. Peak Performance Roofing LLC will obtain the building permit. Warranty confirmation shall be provided upon fmal payment. Installation and manufacturer warranties are not in effect until Paid In Full. Includes CertainTeed Lifetime Limited Warranty (Transferable)with 10 year SureStart period. https://www.certainteed.com/resources/Asphalt_Warranty_CTR3782_1912 E.pdf Total: $10,445 ***If Full Plywood Installation is Necessary: +$3100 A one-third deposit of$3481 will secure contract,permitting, material order, and priority scheduling. The balance shall be due upon completion, within 10 days of invoice. Accounts outstanding over 30 days subject to 2% finance charge monthly. TOTAL $10,445.00 DocuSigned by6uf : L y� " p 12/26/2023 F878A06DF7814C5 Accepted By ... Accepted Date