32A-238 (3) BP-2023-1196
6-8 POMEROY TERR COMMONWEALTH OF MASSACHUSETTS
Map:Block:Lot:
32A-238-001 CITY OF NORTHAMPTON
Permit: Exterior Res
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
BUILDING PERMIT
Permit# BP-2023-1196 PERMISSION IS HEREBY GRANTED TO:
Project# ROOF 2023 Contractor: License:
PEAK PERFORMANCE ROOFING
Est. Cost: 6850 LLC CS-103061
Const.Class: Exp.Date: 09/21/2024
Use Group: Owner: ROSENBACH ARNIE&RENATA S PIENKAWA
Lot Size (sq.ft.)
Zoning: URC Applicant: PEAK PERFORMANCE ROOFING LLC
Applicant Address Phone: Insurance:
1 LOVEFIELD ST 413-203-5888 R2WC342657
EASTHAMPTON, MA 01027
ISSUED ON: 09/06/2023
TO PERFORM THE FOLLOWING WORK:
PARTIAL STRIP AND REROOF
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House # Foundation:
Final: Final: Final: Rough Frame:
Gas: Fire Department Driveway Final: Fireplace/Chimney:
Rough: Oil: Insulation:
Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Signature: 9-' , "2
'
•
Fees Paid: $100.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Office of the Building Commissioner
DocuSign Envelope ID:EDA9E0B9-7622-4240-A4A3-05B2902F5DAD .,--- __,---,,,,I. :.
----
0 o
(.,..) z..
...p-
, 1
5!:•... The Commonwealth of Massachusetts 3 A- 72, FOR \ 1
Board of Building Regulations and Standards o c.,
''. IvIWICfPA
Massachusetts State Building Code,780 CMR
7 cc, U
qtiz1 i...3,1 .2
Building Permit Application To Construct,Repair,Renovate Or Demolish .to e ' cd Mar 20
One- or Two-Family Dwelling ill
This Section For Official Use Only
Buildin Permit Number: ,,273' /./*
Evai—/a55 Date A lied: .
q- i-2603
Building Official(Print Name) Signature Dare
SECTION 1:SI II.INFORMATION
1.1 Property Address:6 - POIV1EROY TERRACE
1.2 Assessors Map& Parcel Numbers
8
1.1a Is this an accepted street?yes no Map Number Parcel N mutter
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq ft) Frontage(ft)
1.5 Building Setbacks(ft)
Front Yard Side Yards . Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Zone: Outside Flood Zone?
Public 0 Private 0 — if yesEl Municipal 0 On site disposal system 0
Check
SECTION 2: PROPERTY OWNERSHIP'
2.1 Owner'of Record:
Arnie Rosenbach Northampton, MA
Name(Print) City,State,ZIP
6-8 Pomeroy Terrace 413-297-7735 Arnierosenbach@icloud.com
No.and Street Telephone Email Address
SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply)
New Construction I:3 Existing Building El Owner-Occupied 0 Repairs(s) 0 I Alteration(s) 0 Addition 0
Demolition El Accessory Bldg.0 Number of Units Other 4D specify: Roofing
Brief Description of Proposed Work2: PARTIAL: Strip and replace
asphalt roof.
I
SECTION 4:ESTIMATED CONSTRUCTION COSTS
Estimated Costs:
Item Official Use Only
(Labor and Materials)
I.Building s 6850 1. Building Permit Fee: $ Indicate how fee is determined:
0 Standard City/Town Application Fee
2.Electrical S
0 Total Project Cost:"(Item 6)x multiplier x
3.Plumbing s
2. Other Fees: S
4.Mechanical (HVAC) 1 S List:
Lc(
5.Mechanical (Fire
$
Suppression) Total All F.epsiit
0
Check Nonivi rtheck Amount: Cash Amount:
, 6.Total Project Cost: $ 6850
1 0 Paid in Full 0 OutsAndini Balance Due:
kv/0
ki
DocuSign Envelope ID:EDA9E0B9-7622-4240-A4A3-05B2902F5DAD
SECTION 5: CONSTRUCTION SERVICES
5.1 Construction Supervisor License(CSL) CSL-103061 09/21/2024 •
James J. Flannery
License Number Expiration Date
Name of CSL Holder U
List CSL Type(see below)
Type Description
No.and Hs o�t oke, MA 01040
y U Unrestricted(Buildings up to 35,000 cu.fl.)
R Restricted I8c2 Family Dwelling
City/Town,State,ZIP M Masonry
RC Roofing Covering
WS Window and Siding
413-203-5888 peakperformanceroofingllc@gmail.comi SF Solid Fuel Burning Appliances
I Insulation
Telephone Email address ;' D Demolition
5.2 e'a er1ormante ootiing, LL (HIC) 183698 11/03/2023
IIIC Registration Number Expiration Date
HIC f gr_n6n aide tt1jflC Registrant Name peakperformanceroofingllc@gmail.com
No.and StreetEasthampton, MA 01027 413-203-5888 Email address
City/Town,State,ZIP Telephone
SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M..G.L.c.152.§ 25C(6))
i l
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide I
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes 1 No 0
SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I,as Owner of the subject property,hereby authorize James J. Flannery/ Peak Performance Roofing LLC
to act on my behalf,in ail matters relative to work authorized by this building permit application.
8/21/2023
`Plilgl'C1 tier's Name(Electronic Signature) Date
SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information
contained in this application is true and accurate to the best of my knowledge and understanding,
James J. Flannery ,-a.)kes Reti^ivrtt 8/18/2023
j Print Owner's or Authorized Agent's Name(Electronic Signature) Date
NOTES:
I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(I IC)Program),will not have access to the arbitration
program or guaranty find under M.G.L.c. 142A.Other important information on the HIC Program can be found at
www.mass.nov/oca Information on the Construction Supervisor License can be found at vetvw.mass.eiovIdns
2. When substantial work is planned,provide the information below:
Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch)
Gross living area(sq.ft.) Habitable room count
Number of fireplaces Number of bedrooms
Number of bathrooms Number of half/baths
Type of heating system Number of decks/porches
Type of cooling system.. Enclosed Open
3. "Total Project Square Footage"may be substituted for"Total Project Cost"
DocuSign Envelope ID: EDA9E0B9-7622-4240-A4A3-05B2902F5DAD
Peak Performance Roofing LLC
1 Lovefield St.
Easthampton, MA 01027
P E
K
413-203-5888 PERFOR CE
peakperformanceroofingllc@gmail.com ROOFING
MA HIC#183698 MA CSL#103061
Contract
ADDRESS CONTRACT# 11066
Arnie Rosenbach DATE 08/18/2023
6-8 Pomeroy Terrace
Northampton
Arnierosenbach@icloud.com
413-297-7735
JOB LOCATION
6-8 Pomeroy Terrace,Northampto
DESCRIPTION
PARTIAL: Replace Areas 1 & 2 Only. See Attached visual.
Peak Performance Roofing will provide the labor and materials to perform the following:
1. Remove the existing roofing shingles.
2. Inspect the sheathing for any rot or deterioration. Any new plywood necessary will be $60 per sheet
installed. Any new roofing boards will be $6 per foot installed. (Wood prices subject to change based on
market fluctuations).
3. Install six feet of ice and water shield on eaves, three feet in any valleys, and three feet around all
penetrations.
4. Cover remaining roof with synthetic underlayment.
5. Install new 8" aluminum drip edge on all eaves and rake edges.
6. Install architectural shingles by CertainTeed:
Landmark: COLOR TBD
http://www.certainteed.com/residential-roofing/products/landmark/
7. Install Shingle Vent 11 ridge vent on peaks of roof(where applicable).
https://www.certainteed.com/residential-roofing/products/certainteed-ridge-vent-12-filtered/
8. Complete all necessary flashings including new LIFETIME pipe boots and base flashing around
chimney.
Remove all debris from premises, and throughout the job, continue cleanup and keep the premises
undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO
ATTIC/INTERIOR.
DocuSign Envelope ID:EDA9E0B9-7622-4240-A4A3-05B2902F5DAD
DESCRIPTION
Please use reasonable caution during the installation process: do not walk or drive under active work or on
areas of potential roofing debris. Installations are weather permitting; inclement weather will cause
scheduling delays.
Peak Performance Roofing LLC will obtain the building permit.
Warranty confirmation shall be provided upon final payment. Installation and manufacturer warranties
are not in effect until Paid In Full.
Includes CertainTeed Lifetime Limited Warranty (Transferable) with 10 year SureStart period.
https://www.certainteed.com/resources/Asphalt_Warranty CTR3 782_1912_E.pdf
Total: $6850
A one-third deposit of$2283 will secure contract, permitting, material order, and priority scheduling.
The balance shall be due upon completion, within 10 days of invoice. Accounts outstanding over 30 days
subject to 2% finance charge monthly.
TOTAL $6,850.00
,----DocuSigned by:
8/21/2023
8C9696 DB3AE243C...
Accepted By Accepted Date
City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111 , S 150A.
Address of the work: 6-8 Pomeroy Terrace
The debris will be transported by: Aaron's 24/7 Towing and Roll-On
The debris will be received by: Valley Recycling
Building permit number:
Name of Permit Applicant Peak Performance Roofing LLC/James Flannery
8/24/2023 James Flannery
Date Signature of Permit Applicant
The Commonwealth of Massachusetts
Department of Industrial Accidents
,pF-Air=7
Office of Investigations
600 Washington Street
P, 1 Boston,MA 02111
`47z
www.mass.govidia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (BusinesslOrginization/Individual): Peak Performance Roofing, LLC
Address: 1 Lovefield St.
City/State/Zip:
Easthampton, MA 01027 Phone #: 413-203-5888
Are you an employer? Check the appropriate box: Type of project(required):
1. I am a employer with 4 4. I 1 1 am a general contractor and 1
6. New construction
employees(full and/or part-time).* have hired the sub-contractors
2.1-1 I am a sole proprietor or partner- listed on the attached sheet. 7. El Remodeling
ship and have no employees These sub-contractors have 8. Demolition
working for me in any capacity. employees and have workers'
9. 0 Building addition
[No workers' comp.insurance comp.insurance.
required.] 5. We arc a corporation and its 10.0 Electrical repairs or additions
3. I am a homeowner doing all work officers have exercised their 11.11 Plumbing repairs or additions
right of exemption per NIGL
myself.[No workers' comp. 12.gRoof repairs
insurance required.]+ c. 152,§1(4),and we have no
employees. [No workers' 13.0 Other
comp.insurance required.]
''Any applicant that checks box#1 must also fill out the section below showing their workers compensation policy information.
;-Homeowners who submit this affidavit indicating they arc doing ail work and then hire outside contractors must submit a new affidavit indicating such,
'Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees, lithe sub-contractors have employees.they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Berkshire Hathaway Guard
Insurance Company Name:
Policy#or Self-ins.Lie.#: R2WC202869 Expiration Date: 04/27/2024
Job Site Address: 6-8 Pomeroy Terrace citystateizip,_Northampt9n,,;_MA
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to 5250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct.
r-SigiP-111-11C-L — - ;Sri' Date: 8/23/2023
413-203-5888
Phone
Official use only. Leo not write in this area,to be completed by city or town official.
City or Town; Permit/License-#
issuing Authority(circle one):
1.Board of Health 2.Building Department 3.Cityfrown Clerk 4.Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone it:
DocuSign Envelope ID: EDA9E0B9-7622-4240-A4A3-05B2902F5DAD
The Roofing Process : What to Expect
When will my roof be scheduled? Once the contract, deposit, and building permit
are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of
our crew is a priority. We must work around the weather forecast; here in New England, this
means we can't plan our schedule very far in advance, and can't promise specific installation
dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and
patience in our dealings with Mother Nature!
Your project manager will contact you a few days before they wish to proceed. Our crews are
hardworking and efficient; most residential installations take only 1-2 days to install.
Do I need to do anything to prepare? As noted on your contract, we are not
responsible for dirt/debris that may fall into the attic. Depending on the condition of the
plywood, you may see little to no debris, or it could be more substantial. If you store items in the
attic, we recommend covering with plastic sheeting.
Do I need to notify my neighbors? If your home is extremely close to other homes
or driveways, there's a possibility we may need to be on their property temporarily to lay
protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a
courtesy. Your neighbors will likely appreciate notification of the noise/traffic.
Materials and Dumpster Delivery: The materials and dumpster may arrive the day
before the scheduled installation (especially if your installation is taking place on a weekend).
Depending on your home's layout and driveway(s), we may need vehicles moved at this point.
Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL
driveways, and away from the house, to avoid any damage, and for our access.
How early will you start? Our crews will begin as early as 7.30am. They will work a
long day, often until dark if necessary. We aim to have the installation completed in as few days
as possible to minimize disruption to you and your neighbors.
Do I need to be home? It's up to you. Some customers like to keep an eye on what's
going on. Others would rather not be home because of the noise. Be aware that roofing is loud
(banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets.
Please do not plan on outdoor activities while we are working, for safety's sake. Please keep
pets inside, or on a leash away from the roofing activities.
DocuSign Envelope ID:EDA9E0B9-7622-4240-A4A3-05B2902F5DAD
What if I have an urgent question? If you have an urgent issue outside of regular
office hours, call or text your project manager directly on his cell.
Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying
sheathing. Your contract states we will replace a small amount of plywood at no additional cost
if needed. If more serious issues are found, the project manager will contact you to explain.
There may need to be an upcharge on the final bill, consistent with the per sheet or square foot
amount quoted in your estimate.
Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done,
we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew
may need to leave before cleaning up, or if the job ends midday, they may leave to start another
job. Another staff person will come later or the next day for more cleaning.
There are materials left over. Did I get charged for those?
Your job is priced according to the measurements. We always bring extra material for the
jobsite, just to be safe. You were not charged for those and we will be collecting them. One of
our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days.
When will the dumpster be removed? The dumpster is usually removed the next
business day after the main crew has finished. Weekends or holidays may delay pickup.
The dumpster company should check for any debris after removal, but please do a visual check
before walking or driving over the area where the dumpster was located. If you see any debris
there, please let us know.
The job is done but I have concerns, what should I do?
Please be aware that even after the main installation crew has left, that doesn't mean our job is
done. The project manager will be coming by as soon as possible to do a final inspection, and a
staff person will come by to do a final sweep, and pickup leftover items. Depending on our
schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days
after main installation is complete. If you have any other questions, please let us know.
Thank you for choosing Peak Performance Roofing!
We will do our very best to make this major home improvement a smooth experience for you!
8/21/2023
�eceaueoear.s.x..
P
E 1114(
1 Lovefield St., Easthampton MA 01027
P E R F R E 413-203-5888 M-F 9am-4pm
ROOFING peakperformanceroofinglIc@gmail.com