2023.08.24 Staff Report
August 24 2023 Staff Report
To: Conservation Commission
From: Sarah LaValley
RE: Staff Report, August 24 2023 Commission Meeting
5:30 PM, continuation. Notice of Intent for septic system replacement within
bordering land subject to flooding (Connecticut River). Jonathan Fogelson. 128
Cross Path Road. Map ID 32-014
Application Overview:
The application proposes construction of a septic system within BLSF to accommodate
additional bedrooms yet to be constructed. To achieve required separation from groundwater,
the system will be mounded, and create a 370 cubic yard mound. A 80 foot hole is proposed to
be dug one foot below grade to create 380 cy of storage, all below the elevation affected. The
application provides no elevation details beyond noting that all work will be within the
floodplain.
DEP Comments:
[1] The plan acknowledges that the site is within Bordering Land Subject to Flooding but the
Form 3 states this is a buffer zone only project. The Form 3 needs to be updated to reflect that
work is occurring in BLSF. The applicant needs to quantify the area of work as well as volumes
at each 1 foot increment. Please note the area may need to be surveyed for elevation. The FEMA
map study is based on the NGVD29 datum and if any other datum is used, there is a correction
factor that must be applied.
The original application on which DEP based their comment did not include any information
at all about cut and fill within BLSF.
[2] Mass Land Records shows the current owner is Talmas LLC.
Consistency with the WPA and Northampton Wetlands Ordinance, Staff
Recommendations:
The application does not clearly indicate the areas affected, does not include a survey, and does
not provide elevation data. It’s not clear how the storage would be achieved or maintained.
Additional information will be needed to be able to determine whether the work meets
performance standards. An alternative to creating a hole would be to demolish a structure or
create flow-through vents to increase flood storage in an existing structure, staff recommends
that this option be investigated.
The Commission will need to be able to find that the work meets the standard that:
“Compensatory storage shall mean a volume not previously used for flood storage and shall be
incrementally equal to the theoretical volume of flood water at each elevation, up to and
including the 100-year flood elevation, which would be displaced by the proposed project.”
August 24 2023 Staff Report
2
Removal of volume at only one incremental 1 foot elevation does not actually comply with the
performance standards, though the Commission has allowed storage at lower elevations in some
cases.
If the Commission can find through additional materials presented that the work will not
contribute to extent and level of floods, an Order of Conditions can be issued, with standard
conditions, and documentation of fill removed. The compensatory storage area will need to be
created prior to the septic work. If additional house footprint expansion is proposed, that will
require additional review. If an elevation certificate is required by the Building Department, the
Commission must be provided a copy. The Commission may continue the hearing to request
additional information.
5:45 PM Request for Determination of Applicability to determine if removal and
management of non-native invasive plant species is subject to the Wetlands
Protection Act or Northampton Wetlands Ordinance. Lathrop Communities, 680
Bridge Road, map ID 18C-141, and Florence Rd, Map ID 44-05
Application Overview:
The Commission issued separate negative determinations for this work in 2019, both of which will
soon expire. This application proposes continued removal of non-native invasive species in
accordance with a Habitat Management Plan at each property. Work is proposed within
riverfront area to an unnamed perennial tributaries to the Connecticut River, and potentially
within buffer zone to bank, but outside other resource areas. Species to be targeted include
multiflora rose, purple loosestrife, various honeysuckle varities, Japanese barberry, Asiatic
bittersweet, winged euonymus and (a new arrival in Northampton), Japanese stiltgrass. Removal
methods include cut stem treatment, targeted foliar spray. Both parcels are subject to
Conservation Restrictions held by the City.
Consistency with the Wetlands Protection Act and Northampton Wetlands
Ordinance:
The application only proposes removal of species that have no recognized habitat value, and
pose threats to native ecology.
Staff Recommendations:
The work proposed should result in no alteration, and an overall improvement to jurisdictional
resource areas. Issue a negative determination by checking box 2 to indicate that the work is
within an area subject to protection, but will not remove dredge fill or alter said area. Require
notification 48 hours prior to work being done, and again when complete each year, and require
copies of all monitoring reports.
6:00 PM Notice of Intent for improvements to existing driveway, creation of an 8
space parking area to serve Mineral Hills Greenway, and related stormwater
improvements. Work to take place in riverfront (unnamed tributary to Parsons
August 24 2023 Staff Report
3
Brook) and buffer zone. Rebecca Allen & Roland Ouelette. 332 Turkey Hill Rd.
Map IDs 34-02, 34 & 36.
Application Overview:
The application proposes refinements to an existing development plan. The easements and
initial permits for this have been in place for many years. The most recent addition to the
Mineral Hills Greenway was the third lot in a 3-lot development, which also included the hilltop
parcel and the condo lot. Work now proposed includes construction of a two family building at
the top of the hill outside resources areas, improvements to an existing 12’ wide paved driveway,
and associated stormwater management system. The lot on which an existing condominium unit
is located is still proposed to be built out with two additional multifamily buildings, parking,
associated utilities and stormwater management. On lot 2, the remaining portion of the 12’
residential drive is proposed along with an 8 space public parking lot for the conservation area,
which will be served by a stormwater system across the road.
Encroachments into the wetland buffer zone are limited to improvements being made to the
previously constructed 16’ wide driveway extending to the top of the hill. Disturbances within
the buffer zone are primarily limited to currently degraded areas. The design also includes a
limited plan to remove invasive vegetation from the riverfront area and buffer zones as
feasible.
The application also required a stormwater permit amendment from the Department of
Public Works which had not been issued as of the time of this report, but should be available
at the hearing.
DEP Comments:
[1] All stormwater BMPs must be designed, constructed, operated and maintained per the
Stormwater Handbook, Volume 2 Chapter 2.
Agreed, require that the O&M have clear requirements for responsible parties, with staff
review and approval prior to execution. This is critical since more than one parcel and
potentially several different property owners
[2] The commission should discuss the keeping of a log book detailing maintenance done
on the approved stormwater BMPs as this requirement is frequently not done by the owner of
record of the stormwater system.
[3] Please note that the perennial stream is a Cold Water Fishery Resource. Preventing
sediment from entering the water and maintaining and/or increasing shading of the water
column is important to protecting this valuable resource. Coldwater streams and rivers are
critical habitat for a variety of fish including rare (American Brook Lamprey, Longnose
Sucker, Lake Chub) and recreationally-important (Brook Trout) species.
Consistency with the WPA and Northampton Wetlands Ordinance, Staff
Recommendations:
The application includes an assessment of compliance with performance standards with
which staff agrees. All of the work proposed will take place within areas that were degraded
as part of quarrying and earth removal operations.
August 24 2023 Staff Report
4
Discuss DEP comments above with the applicant
Staff reviewed the delineation and did not have concerns.
Require a clear phasing plan with responsible parties, including delineation of which project
elements will be completed at each stage. This is important since condominium work is not
planned at this time. The stormwater basins and parking area must be constructed prior to
or concurrently with the house lot.
A detailed planting and maintenance plan, including watering, must be provided prior to the
preconstruction meeting
A request for certificate of compliance must include an assessment of all plantings within
resource areas, after no less than two growing seasons. Any plantings not surviving at that
time shall be replaced.
Other Items:
Request for Certificate of Compliance, 68 Blackberry Lane, Parcel 18C-136 DEP
File 246-617
The Commission issued an Order in 2008 for repair of a stone wall, demolition of a patio, and
construction of a sunroom within buffer zone to bank of a stream channelized in concrete
that emerges from a pipe at the edge of the property within a mown lawn area. Staff visited
the site and confirmed that work was completed as proposed; with . The Order required as-
built plans which were not provided, though there did not appear to have been any plans filed
with the application. Staff recommends issuance of a certificate, with a note to the applicant
that the deed must include language regarding the presence of resource areas as required as
an ongoing condition.