Loading...
18C-175 (2) BP-2023-1133 63 HATFIELD ST COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 18C-175-001 CITY OF NORTHAMPTON Permit: Exterior Res PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2023-1133 PERMISSION IS HEREBY GRANTED TO: Project# ROOFING 2023 Contractor: License: PEAK PERFORMANCE ROOFING Est. Cost: 5250 LLC CS-103061 Const.Class: Exp.Date: 09/21/2024 SCHOR, SOPHIE R.& BLOOM, RENA A. & SCHOR, Use Group: Owner: JACOB J. Lot Size (sq.ft.) Zoning: URB Applicant: PEAK PERFORMANCE ROOFING LLC Applicant Address Phone: Insurance: 1 LOVEFIELD ST 413-203-5888 R2WC342657 EASTHAMPTON, MA 01027 ISSUED ON: 08/21/2023 TO PERFORM THE FOLLOWING WORK: STRIP AND REROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: , . r'I • • � , yQ • I Fees Paid: $40.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Office of the Building Commissioner DocuSign Envelope ID:6B2D2C43-F29C-4E90-ADDE-970B335CC4C1 /1 Ci o I „, The Commonwealth of M-.sac -tts c7 7 �//��..��,, Board of Building Regulation d -:' ': ► . "c�1 FOR If Massachusetts State Building Code, `fir'•bNc� UEALiTY •T• Nsa Building Permit Application To Construct,Repair,Renovate C •u, ;too;,�s ' uisedMar 201.1 One- or Two-Fanrihv Dwelling This Section For Official Use Only Buildin Permit Number: ,P-•d''—' I1 i3 Date A lied: i 7-7i�vr.s /boss _—___ _ 8-21-W Building Official(Print Name) Signature Date SECTION 1:SITE INFORMATION 1.1 Prof e Address: 63 Hatfield St, Unit 8, Northampton 1.2 Assessors Map&Parcel Numbers i 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) i 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided i 1.6 Water Supply:(M.G.L c.40,g54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone: _ Outside Flood Zone? Municipal Li On site disposal system 0 Check if yesD SECTION 2: PROPERTY OWNERSIhIP1 2.1 Owner'of Record: Sophie Schor Northampton, MA Nance(Print) City,State,ZIP 63 Hatfield St, Unit 8 720-325-8015 sophie.schor@gmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building❑ Owner-Occupied Cl I Repairs(s) 0 Alteration(s) D Addition 0 Demolition 0 Accessory Bldg,D Number of Units I Other Specify: Roofing Brief:Description of Proposed Work2: Strip and replace asphalt roof. SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building s 5250 1. Building Permit Fee: $ Indicate how fee is determined: Electrical $ ❑Standard City/Town Application Fee ! 2. . ❑Tom]Project Cosi?(Item 6)x multiplier x 3.Plumbing $ 12. Other Fees: S 4.Mechanical (1-1VAC) S List: 5.Mechanical (Fire $ Suppression) Total All Fees: if Check Ncki3g1 Check Amount. 4 Cash Amount: 6.Total Project Cost: $ 5250 0 Paid in Full 0 Outstanding Balance Due: DocuSign Envelope ID:6B2D2C43-F29C-4E90-ADDE-970B335CC4C1 TION 5; CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) I CSL-103061 09/21/2024 James J. FInnery License Number Expiration Date Name of CSL Holder # U List CSL Type(see below) No.and t Type Description i oiyoke, MA 01040 ! U Unrestricted(Buildings up to 35,000 c;t.ft.) R Restricted l&2 Family Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding 413-203-5888 peakperformanceroofinglIc@gmail.comi SF Solid Fuel Burning Appliances j I Insulation Telephone Email address j D Demolition 5.2 Punk ertormante`I-(ooli Contractor, LL . tIC) 183698 11/03/2023 �; I-IIC Registration Number Expiration Date HIC cLoverIeiC� 1zIC Registrant Name peakperformanceroofingllc@gmail.com No.and Street Easthampton, MA 01027 413-203-5888 Email address City/T.awn,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes No . 0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Iz as Owner of the subject property,hereby authorize James J. Flannery/ Peak Performance Roofing LLC to act on my behalf,in ail matters relative to work authorized by this building permit application. 8/20/2023 "PtiVif oner's Name(Electronic Signature) Date SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. James J. Flannery -amesarv,rw 8/20/2023 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(MC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.novioca Information on the Construction Supervisor License can be found at ups+nv.mass.eov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" DocuSign Envelope ID:6B2D2C43-F29C-4E90-ADDE-970B335CC4C1 The Roofing Process : What to Expect When will my roof be scheduled? Once the contract, deposit, and building permit are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of our crew is a priority. We must work around the weather forecast; here in New England, this means we can't plan our schedule very far in advance, and can't promise specific installation dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and patience in our dealings with Mother Nature! Your project manager will contact you a few days before they wish to proceed. Our crews are hardworking and efficient; most residential installations take only 1-2 days to install. Do I need to do anything to prepare? As noted on your contract, we are not responsible for dirt/debris that may fall into the attic. Depending on the condition of the plywood, you may see little to no debris, or it could be more substantial. If you store items in the attic, we recommend covering with plastic sheeting. Do I need to notify my neighbors? If your home is extremely close to other homes or driveways, there's a possibility we may need to be on their property temporarily to lay protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a courtesy. Your neighbors will likely appreciate notification of the noise/traffic. Materials and Dumpster Delivery: The materials and dumpster may arrive the day before the scheduled installation (especially if your installation is taking place on a weekend). Depending on your home's layout and driveway(s), we may need vehicles moved at this point. Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL driveways, and away from the house, to avoid any damage, and for our access. How early will you start? Our crews will begin as early as 7.30am. They will work a long day, often until dark if necessary. We aim to have the installation completed in as few days as possible to minimize disruption to you and your neighbors. Do I need to be home? It's up to you. Some customers like to keep an eye on what's going on. Others would rather not be home because of the noise. Be aware that roofing is loud (banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets. Please do not plan on outdoor activities while we are working, for safety's sake. Please keep pets inside, or on a leash away from the roofing activities. DocuSign Envelope ID:6B2D2C43-F29C-4E90-ADDE-970B335CC4C1 What if I have an urgent question? If you have an urgent issue outside of regular office hours, call or text your project manager directly on his cell. Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying sheathing. Your contract states we will replace a small amount of plywood at no additional cost if needed. If more serious issues are found, the project manager will contact you to explain. There may need to be an upcharge on the final bill, consistent with the per sheet or square foot amount quoted in your estimate. Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done, we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew may need to leave before cleaning up, or if the job ends midday, they may leave to start another job. Another staff person will come later or the next day for more cleaning. There are materials left over. Did I get charged for those? Your job is priced according to the measurements. We always bring extra material for the jobsite, just to be safe. You were not charged for those and we will be collecting them. One of our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days. When will the dumpster be removed? The dumpster is usually removed the next business day after the main crew has finished. Weekends or holidays may delay pickup. The dumpster company should check for any debris after removal, but please do a visual check before walking or driving over the area where the dumpster was located. If you see any debris there, please let us know. The job is done but I have concerns, what should I do? Please be aware that even after the main installation crew has left, that doesn't mean our job is done. The project manager will be coming by as soon as possible to do a final inspection, and a staff person will come by to do a final sweep, and pickup leftover items. Depending on our schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days after main installation is complete. If you have any other questions, please let us know. Thank you for choosing Peak Performance Roofing! We will do our very best to make this major home improvement a smooth experience for you! 5.*,:. 8/20/2023 �-BBY)IB!/F901F. pE 1 Lovefield St., Easthampton MA 01027 P E R F 4 R CE 13-203-5888 M-F 9am-4pm ROOFING peakperformanceroofinglIc@gmail.com DocuSign Envelope ID:6B2D2C43-F29C-4E90-ADDE-970B335CC4C1 DESCRIPTION Ls Please use reasonable caution during the installation process: do not walk or drive under active work or on areas of potential roofing debris. Installations are weather permitting; inclement weather will cause scheduling delays. Peak Performance Roofing LLC will obtain the building permit. Warranty confirmation shall be provided upon final payment. Installation and manufacturer warranties are not in effect until Paid In Full. Includes CertainTeed Lifetime Limited Warranty (Transferable)with 10 year SureStart period. https://www.certainteed.com/resources/Asphalt_Warranty_CTR3 782_1912_E.pdf Total: ($5750) - $500= $5250 A one-third deposit of$1750 will secure contract, permitting, material order, and priority scheduling. The balance shall be due upon completion, within 10 days of invoice. Accounts outstanding over 30 days subject to 2% finance charge monthly. TOTAL $5,250.00 DocuSigned by. 8/20/2023 Accepted By BB447A814F904FA. Accepted Date DocuSign Envelope ID:6B2D2C43-F29C-4E90-ADDE-970B335CC4C 1 Peak Performance Roofing LLC 1 Lovefield St. F' E 1\'" K Easthampton, MA 01027 413-203-5888 PERFOR : , NCE peakperformanceroofingllc@gmail.com ROOFING MA HIC#183698 MA CSL#103061 Contract ADDRESS CONTRACT# 11067 Sophie Schor DATE 08/20/2023 63 Hatfield St, Unit 8: Prospect Woods Northampton sophie.schor@gmail.com 720-325-8015 JOB LOCATION 63 Hatfield St, Unit 8 DESCRIPTION 63 Hatfield St, Unit 8: Prospect Woods Peak Performance Roofing will provide the labor and materials to perform the following: 1. Remove the existing roofing shingles. 2. Inspect the sheathing for any rot or deterioration. Any new plywood necessary will be $60 per sheet installed.***Any new roofing boards will be $6 per foot installed. (Wood prices subject to change based on market fluctuations) 3. Install six feet of ice and water shield on eaves, three feet in any valleys, and three feet around all penetrations. 4. Cover remaining roof with synthetic underlayment. 5. Install new 8" aluminum drip edge on all eaves and rake edges. 6. Install architectural shingles by CertainTeed: Landmark PRO: BURNT SIENNA https://www.certainteed.com/residential-roofing/products/landmark-pro/ 7. Install Shingle Vent 11 ridge vent on peaks of roof(where applicable). https://www.certainteed.com/residential-roofing/products/certainteed-ridge-vent-12-filtered/ 8. Complete all necessary flashings. Remove all debris from premises, and throughout the job, continue cleanup and keep the premises undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO ATTIC/INTERIOR. City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: 63 Hatfield St, Unit 8: Prospect Woods The debris will be transported by: Aaron's 24/7 Towing and Roll-On The debris will be received by: valley Recycling Building permit number: Name of Permit Applicant Peak Performance Roofing LLG/James Flannery 8/21/2023 James Flannery Date Signature of Permit Applicant The Commonwealth of Massachusetts. C.FAlt.• .- 4'4 .,..... Department of Industrial Accidents .,4, .11•4 7' Office of Investigations 41, _ 600 Washington Street Boston,ALA 02111 www.mass.govidia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant information Please Print Legibly Name (Business!Organizationfindividual;: Peak Performance Roofing, LLC _ 1 Address: Lovefield St. Easthampton, MA 01027 413-203-5888 City/State/Zip: Phone #: , -- Are ..-pii an employer? Check the appropriate box: Type of project(required): I.VI am a employer with 4 4. ri 1 am a general contractor and I 6. 0 New construction employees(full and/or part-time).* have hired the sub-contractors 2.0 I am a sole proprietor or partner- listed on the attached sheet. 7. 0 Remodeling ship and have no employees These sub-contractors have 8. D Demolition working for Mc in any capacity. employees and have workers' 9. 0 Building addition (No workers- comp.insurance comp.insurance)- required.] 5. [1 We arc a corporation and its 10.0 Electrical repairs or additions 3.ti I am a homeowner doing all work officers have exercised their ILL] Plumbing repairs or additions myself.[No workers' comp_ right of exemption per MGL 12.gRoof repairs insurance required.] ' c. 152.§1(4).and we have no employees. [No workers' 13.0 Other comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers compensation policy information. I.Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. 'Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees, lithe sub-contractors have employees,they must proside their workers'comp.policy number. . . I am an tmployer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Berkshire Hathaway Guard losurance Company Name: Policy for Self-ins.Lie.th_ R2WC202869 Expiration Date: 04/27/2024 soh site Address:__63 Hatfield St, Unit 8: Prospect Woods cityislatt„:zip,_ Northampton , MA Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to S250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. -,A !?), , Signature: _ ‘,.. ,.-,,,,,,,, --4...„,,I , L Date: 8/21/2023 413-203-5888 :1 be )t Phone#: Official use only. Do not write in this area,to be completed by city or town official. City or Townr, -Permit/License it Issuing Authority[circle one): 1 1.Board of Health 2.Building Department 3.Cityff ov,n Clerk 4.Electrical Inspector 5.Plumbing inspector i 6.Other IContact Person:, Phone If: