Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
D Amour Residence - Change Order #1 - Fire Pump & Tank Assembly installation
Impact Fire, LLC. 533 Center Street Ludlow, MA 01056 Office - 413-589-0672 Fax- 413-583-6377 8/3/2023 1 Proposed Scope of Work: 1 2 3 4 5 6 7 8 9 10 3,972.11$ 5.0% 5.0% 6.25% Hours 8 0 0 0 0 Unit OH&P 0 10% 0 10% 10% Total Equipment & Subcontract 0.00% Change Order Total JU To:Wright Builders, Inc.Date:8/3/2023 Change Order 48 Bates Street Project:D'Amour Residence Northampton Massachusetts 01060 PCO #:1 WO Ref:Installation of a Pump & Tank Attn: Matt O-Rourke GC: Material Material Cost 3,972.11$ Overhead 198.61 Profit 208.54 Sales Tax 248.26 Total Material 4,627.51$ Labor Rate Hours - Regular 120.00$ 960.00$ Hours - Premium 60.00$ - Design/Engineering 110.00$ - Project Manager 95.00$ - Fab/Delivery 125.00$ - Total Labor 960.00$ Equip. & Sub. Lift Rental (week)-$ -$ Rate -$ -$ Totals Material-Labor-Equipment 5,587.51$ -$ 5,580.00$ Approved by: -$ -$ Service Tax Permit Change Order Amount Tools (lump) Prepared by: Signature required prior to completing work. 5,587.51$ This also excludes revision to the permit drawings due to the timeline needed to execute new plans This is for the installation of a 2 hp pump & tank system in lieu of the previous riser assembly due to a water supply issue discovered during the final inspection. This excludes: Electrical wiring, fire alarm wiring and plumbing the water supply to the auto-fill valve Quality, Integrity, Value Material Qty Description Hrs/Unit Total Labor Unit Cost Materials 1 2 hp pump and tank assembly 0 3,897.11 3,897.11 0- - 1 Misc Pipe & Fittings 0 75.00 75.00 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - 0- - Totals 0 3,972.11$