32A_156D 5 Bridge Street PlanningCITY OF NORTHAWTON FEB 1 0 1997
PLANNING BOARD APPLICATION FOR:
1. Applicant's Name: `iCtt
Address:
/U iTC Telephone:
2. Parcel Identification: Zoning Map # Parcel # 5- Zoning District:
Street Address:
3. Status of Applicant: Owner; Contract Purchaser-, / Lessee
Other (explain)
4. Property Owner:
Address: ll� / N Telephone:
S. Describe Proposed Work/Project (Use additional sheets if necessary):
�CILc r (' FL
********************************************************************************************
Has the following information been included in the application?
Site/Plot Plan V List of requested waivers fee
2 sets of labels (supplied by the Assessor's Office)
Signed dated and denied Zoning Permit Application
SL Three (3) copies of the Certified Abutters List from Assessors' Office.
1
C. How will the proposed use promote a harmonious relationship of structures and open spaces to:
the natural landscape: /v; "-") I-,� & �, /L, L fa /,
to existing buildings:
other community assets in the area:
D. What measures are being taken that show the use will not overload the City's resources, including:
water supply and distribution system:_
sanitary sewage and storm water collection and treatment systems:
fire protection, streets and schools:
How will the proposed project mitigate any adverse impacts on the City's resources, as listed
above? Q-; ,.N / -".
E. List the section(s) of the Zoning Ordinance that states what special regulations are required for the proposed
project (flag lot, common drive, lot/size averaging, etc.)
How does the project meet the special requirements? (Use additional sheets if necessary)?
F. State how the project meets the following technical performance standards:
Curb cuts are minimized: r >6
/ECEIVF\
FEB 10 1997
Check off all that apply to the project:
use of a common driveway for access to more than one business
_mouse of an existing side street use of a looped service road
2• Does the project require more than one driveway cut?
NO YES (if yes, explain why)
3• Are pedestrian, bicycle and vehicular traffic separated on -site?
YES NO (if no, explain why)
For projects that require Intermediate Site Plan Approval, ONLY, sign application and end
here.
9. I certify that the information contained herein is true and accurate to the best of my
knowledge. The undersigned owner (s) Planning Board permission to enter the
property to review this application.
Date: Z /b /y '7 Applicants
Date: Owner's Signature:
r.
(If not same as applicant)
For projects that require a Special Permit or which are a major project, applicants must also
complete the following page.
�EI_VF,�
4
FEB 10 1997
11�
F. Explain why the requested use will:
not unduly impair the integrity or character of the district or adjoining zones:
F I=' f�% lc / C %-tu
not be detrimental to the health, morals or general welfare:
be in harmony with the general purpose and intent of the Ordinance:
G. Explain how the requested use will promote City planning objectives to the extent possible and will not
adversely effect those objectives, defined in City master study plans (Open Space and Recreation Plan;
Northampton State Hospital Rezoning Plan; and Downtown Northampton: Today, Tomorrow and the Future).
9. I certify that the information contained herein is true and accurate to the best of my
knowledge. The undersigned owner(s) grant the Planning Board permission to enter
the property to review this application.
Date: 2/-` /S 7 Applicants
Date: Owner's Signature:
(If not the same as applicant's)
MAJOR PROJECTS must also complete the following page:
CEIVE\
7��
5 ( FEB 1 01997
MAJOR PROJECT APPROVAL CRITERIA:
Does the project incorporate 3 foot sumps into the storm water control system?
YES NO (if no, explain why)
Will the project discharge stormwater into the City's storm drainage system?
YES NO IF NO, answer the following:
Do the drainage calculations submitted demonstrate that the project has been designed so that there is no
increase in peak flows from pre- to post -development conditions during the:
1, 2, or 10 year Soil Conservation Service design storm ?
YES NO (if no, explain why)
Will all the runoff from a 4/10 inch rainstorm (first flush) be detained on -site for an average of 6 hours?
t`� YES NO (if no, explain why)
Is the applicant requesting a reduction in the parking requirements?
� -NO YES
If yes, what steps have been taken to reduce the need for parking, and number of trips per day?
/ECEIVF\
FEB 10 1997
6
U"
SITE PLAN REQUIREMENTS
REQUEST FOR WAIVERS APPLICATION
The application MUST include a site plan containing the information listed below. The Planning Board may waive the
submission of any of the required information, if the Applicant submits this form with a written explanation on why a
waiver would be appropriate. To request a waiver on any required information, circle the item number and fill in
the reason for the request. Use additional sheets if necessary.
A. Locus plan
B. Site plan(s) at a scale of 1"=40' or greater.
B- L. Name and address of the owner and the developer, name of project, date and scale plans:
B-2. Plan showing Location and boundaries of-
- the lot
- adjacent streets or ways
- all properties and owners within 300 feet &
- all zoning districts within 300 feet
B-3. Existing and proposed:
- buildings
setbacks from property lines
building elevations_ c"k_- r
all exterior entrances and exits
(elevation plans for all exterior facades structures are encouraged)
B-4. Present & proposed use of:
the land
buildings:
B-5. Existing and proposed topography (for intermediate projects the permit granting authority may accept
generalized topography instead of requiring contour lines):
at two foot contour intervals
showing wetlands, streams, surface water bodies
showing drainage swales and fioodplains:
showing unique natural land features
��CEIVF\
7
FEB 10 1997
B-6. Location of
parking & loading areas
public & private ways_
driveways, walkways
access & egress points.
Proposed surfacing:_
B-7. Location and description of:
- all stormwater drainage/detention facilities
- water quality structures
- public & private utilities/easements
- sewage disposal facilities
water supply facilities
B-8. Existing & proposed:
- landscaping, trees and plantings (size & type of plantings)
stone walls,
buffers and/or fencing:
B-9. Signs - existing and proposed: T ` n c" '
Location
Ll
dimensions/height ? 1
color and illumination
B-10. Provisions for refuse removal, with facilities for screening of refuse when appropriate:
/ �r
FOR MAJOR PROJECTS ONLY:
0-11. An erosion control plan and other measures taken to protect natural resources & water supplies:
A.
C. Estimated daily and peak hour vehicles trips generated by the proposed use, traffic patterns for vehicles and
pedestrians showing adequate access to and from the site, and adequate vehicular and pedestrian circulation
within the site.
Site Plans submitted for major projects shall be prepared and stamped by a:
Registered Architect, Landscape Architect, or Professional Engineer
CEIVFO
8 /<��
FEB 10 1997
FILE I
F NOY 2 6 %6
APPLICANT/CONTACT PERSON:---
ADDRESS/PHONE:
PROPERTY LOCATION: �J-
MAP PARCEL:
961 r'60
ZONE -
THIS SECTION FOR -OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
FwrT .ncrn D'V ATTM1M+ n V% A 'T. .
M.-W.
i 1 . • M
F&MUMUffilifflF.1
r
a �e
••
1 �oULM . 1
_
TBE FOLLOWING ACTION HAS 1
Approved as presented/based on information presented - --_- -- -vy
Denied as presented: 10, tO �- 1O• �) ���^�� i� r�a4
q—hSe
ecial Permit nd/or Site Plan equired under: § cu �(�0
OARD ZONING BOARD J
Received & Recorded at Registry of Deeds Proof Enclosed
Finding Required under: § w/ZONING BOARD OF APPEALS
Received & Recorded at Registry of Deeds Proof Enclosed
Variance Required under: § w/ZONING BOARD OF APPEAI.S
Received & Recorded at Registry of Deeds Proof
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availabil FEB 10 1997
Septic Approval-Bd of Health Well Water Potability -Bd Health
____Permit from
Signature of Building
NOTE: kmuanoa of at zoning permit does not relieve "an appiioanta burden to oomply with aii
zoning requiramenta and obtain aii required permits from the Board of Haaith, Conservation
Commission, Departmant of Pubiio Works and other,appiioabie permit granting authorities.
ZI
WE
a
IT
AVAW sr.
A-k
I
1
�C!
o
r
>
a�
9%9 Z AON
a —f
'O Cl6)YIG Yr[aMY MALL Y I
• R3 4
•
—
o
x �
4 .. �t^pwg 2 •
o I
E 3 [rrsruw uur cauw
4 �atall "v
s
w $R
o
o _
e n �
i V1 it. 1
s
� � ` " y e � _ Y\ •I IRS �
L [m/uw uLLY Caurr _ ,?�, � I •I I� C�
w ^ II
a c tiIL
b � � 22tSS
w i
m II J
0 0
N a N r
[mrµc W.r Caurr
o I N j �I�I1lrrpppr--
j; i
� fi co s
n nrM uur tawµ ° i �\ I
2 7 a
O n y I
_ F
rz
o � 4 a � t• ^: x �° ^N lµ !
-"Z•] II ca
[rarvic uur tau.µ �• I IR =
I In
U r
y =
L teas
j �519 Z I