Dumpter options-Roundhouse lot-WF8.19.20AVE.STREET
OLD SOUTH STREET PETER PAN TERMINALROUND HOUSEPULASKI PARKJOSEPH H.MCDONALDHOUSEAPARTMENTBUILDINGNEW SOUTH STREET - RTE 10Parking Figures_FINAL.dwgCHECKED:DRAWN BY:FILE:ADFZPCEGBSCALE:APPROVED:Northampton, MARound HouseParking LotStudyCentral ServicesDepartmentDATE:JAN 2017PROJECT NO:N-0936-111 INCH0VERIFY SCALEIF NOT ONE INCH ONTHIS SHEET, ADJUSTSCALES ACCORDINGLYBAR IS 1 INCH ONORIGINAL DRAWINGPlotted On:Jan 10, 2017-2:59pm By: adfLast Saved:1/10/2017Tighe & Bond:\\Srv\projects\N\N0936 Northampton DPW\11 - Roundhouse Parking Lot\Drawings_Figures\AutoCAD\Sheet\Parking Figures_FINAL.dwg
PRELIMINARYwww.tighebond.comMARK DATEDESCRIPTION1" = 20'SHEET 4PROPOSEDPARKING LAYOUTPOTENTIAL DUMPSTERLOCATIONPROPOSEDMARKED BIKE PATHOLD SOUTH STREET 5242424232614116410101010APPROXIMATELY 11,500 SF OF CLEARINGAND GRUBBING AND 2,000 CY OF FILLREQUIRED TO CONSTRUCT ADDITIONALPARKING.PREFERRED PARKING CONCEPTPARKING STALLSEXISTING181CHANGE(+) 55PROPOSED236MARKED BIKE CONNECTIONTO PULASKI PARK (SHAREDWITH DRIVE AISLE)APPROXIMATELY 3,980 SFN3512'18'27'ROTATE TICKETKIOSK TO FACEDRIVE AISLEROTATE TICKETKIOSK TO FACEDRIVE AISLEPROPOSEDTAKING AREARECOMMENDEDFENCE OR RAILSECTIONSOLID YELLOWCENTERLINESTOP BAR