Loading...
Northampton MA 2022 Recert.pdfFEMA FORM 086-0-35A (10/23)Page 3 of 11 Community State CID (6-digit NFIP Community Identification Number) CRS Program Data Table A. In the SFHA B. In a regulated floodplain outside the SFHA C. In the rest of the community 1. Last report's number of buildings in the SFHA (bSF) (line 6, last report) 2. Number of new buildings constructed since last report + 3. Number of buildings removed/demolished since last report - 4. Number of buildings affected by map revisions since last report (+ or -) 5. Number of buildings affected by corporate limits changes (+ or -) 6. Current total number of buildings in the SFHA (bSF) (total lines 1-5) 7. Number of substantial improvement/damage projects since last report 8. Number of repetitive loss properties mitigated since last report 9. Number of LOMRs and map revisions (not LOMAs) since last report 10. Acreage of the SFHA (aSFHA) as of the last report (line 13, last report) 11. Acreage of area(s) affected by map revisions since last report (+ or -) 12. Acreage of area(s) affected by corporate limits changes (+ or -) 13. Current acreage of the SFHA (total lines 10−12) 14. Primary source for building data: 15. Primary source for area data: 16. Period covered:Current FIRM date If available, the following data would be useful: 17. Number of new manufactured homes installed since last report 18. Number of other new 1 -4 family buildings constructed since last report 19. Number of all other buildings constructed/installed since last report Comments: (Please note the number of the line to which the comment refers.) CC-213-2 [continued on next page] FEMA FORM 086-0-35A (10/23)Page 4 of 11 Community State CID (6-digit NFIP Community Identification Number) Instructions At the first verification visit after the effective date of the 2013 CRS Coordinator's Manual, ONLY LINES 6 AND 13 NEED TO BE COMPLETED. These lines form the baseline data about the number of buildings and area of the SFHA for when the table is completed as part of the next annual recertification. The "period covered" entered in line 16 is the date that lines 6 and 13 are first completed. At all subsequent annual recertifications and cycle verification visits, the entire table is completed. The information in lines 6 and 13 from the last report is transferred to lines 1 and 10 in the next report. Instructions for the Columns Column A numbers are for the SFHA (the A and V Zones shown on the Flood Insurance Rate Map) (FIRM)). Use the FIRM currently in effect, not a draft or pending revision. Column B is completed only if the community receives CRS credit for regulating floodplain development outside the SFHA under Activity 410 (Floodplain Mapping) or Activity 430 (Higher Regulatory Standards). Column C numbers help relate what happens in the floodplain to what is happening in the rest of the community. Enter "0" if there are no numbers to report for this period. Do not leave a cell blank. Do not fill in the shaded boxes. Instructions for the Lines Lines 1-7 deal with buildings. o Section 301.a of the CRS Coordinator's Manual defines what constitutes a "building" and lists examples of structures that are not counted as "buildings" by the CRS. o Section 302.a of the CRS Coordinator's Manual describes how the CRS counts buildings. For example, accessory structures are not counted. o As noted in Section 302.a, to determine building counts, communities may use any method that yields reasonably good estimates of the number of buildings. Examples of acceptable methods are listed in Section 302.a. Precision is less important for large numbers. For example, the impact of the numbers will not change much if there are 10,000 buildings or 10,100 buildings. o If a building is out of the SFHA, but in a parcel that is partly in the SFHA, it is not counted in column A --In the SFHA. o In line 14, note how the building counts were obtained or estimated. Use the comments area, if needed. Line 4 refers to map revisions. These include physical map revisions, Letters of Map Revision (LOMR), and Letters of Map Amendment (LOMA). If a building is removed from the SFHA by FEMA through a LOMA, but the community still administers its floodplain management regulations on the property, the building should not be included in the line 4 count in column A --In the SFHA. However, communities that still regulate areas removed by LOMAs can receive credit under Activities 410 or 430. If the community is receiving such credit, the building should be counted under column B --In a regulated floodplain outside the SFHA. Line 7 is for the total number of buildings that were substantially improved plus the number of buildings that were substantially damaged during the period covered. Lines 10 -13 deal with areas. o These areas are based on the areas shown on the community's FIRM including LOMRs or LOMAs. Section 403.b discusses those portions of the SFHA that are subtracted from the area of the SFHA to calculate the community's aSFHA used in credit calculations. o Section 403.e of the CRS Coordinator's Manual discusses calculating areas for CRS purposes. o Section 403.e notes that communities “should not spend an inordinate amount of time measuring areas.” As with buildings, communities may use any method that yields reasonably good estimates. Examples of acceptable approaches are listed in Section 403.e. o Line 13 asks for the current acreage of the SFHA. The best source for this number is a GIS layer that shows the SFHA. If the community does not have GIS, the county, regional agency, or state NFIP mapping office may have SFHA layers and may be able to provide the data. If the community has a relatively recent FIRM, the study contractor or consulting engineer may have the data. o In line 15, note how the area calculations were obtained or estimated. Use the comments area, if needed. Lines 17 -19 are voluntary, if the numbers are readily available. o Line 17 includes replacing an existing manufactured home with a new one. The newly placed manufactured home is counted as a new, post-FIRM, building. o The total of lines 17 -19 should equal the value entered in line 2. CC-213-3 Community Northampton, City of State MA CID 250167 County Hampshire COMMUNITY RATING SYSTEM ANNUAL RECERTIFICATION Community Certifications CC-213-1 Edition: 2017 Your community has been verified as receiving CRS credit for the following Activities. If your community is still implementing these activities the CRS coordinator is requiredto put his or her initials in the blank (do not use a checkmark or an “X”) and attach the appropriate items. A blank with no initials indicates you are not implementing that Activity anymore, and will result in loss of points (and possible CRS Class). If the word “attached” is used you must provide the requested documentation for thatActivity. If no documentation has been acquired for that Activity, please explain whythere is no documentation from the past year. ___ 310 EC: We are maintaining Elevation Certificates, Floodproofing Certificates, Basement Floodproofing Certificates, V Zone design certificates and engineered opening certificates on all new construction and substantially improved buildings in our Special Flood Hazard Area (SFHA) and make copies of all Certificates available at our present office location. [____] Initial here is you have had no new construction or substantial improvement in the SFHA in the last year. ___ 310 EC: Attached is the permit list for only new or substantially improved structures in the SFHA that have been completed in the last year. We have permitted ____new building and substantial improvements in the SFHA during this reporting period. ___ 310 EC: Attached are all the Certificates for new or substantially improved structures that have been completed during this reporting period that are in-cluded on the above permit list. (Note: The total number of Elevation and Flood-proofing certificates should match the number of permits issued and completed within the reporting period defined above. All permits issued for new construction or sub-stantial improvement within the V zone should have both an Elevation Certificate and a V Zone Certificate, and all buildings with basements within the basement exemp- tion communities should have both an Elevation Certificate and a Basement Flood-proofing Certificate). ___ 310 CCMP: We continue to follow our Construction Certificate Management Procedures and update them when needed. ___ 320 MI 1: We are providing basic flood information to inquirers. We also continue to provide the following to inquirers: ____ MI 6 historical flood information ____ MI 7 natural floodplain functions SL 0 SL SL SL SL SL SL SL Community Northampton, City of State MA CID 250167 County Hampshire COMMUNITY RATING SYSTEM ANNUAL RECERTIFICATION Community Certifications CC-213-2 Edition: 2017 ___ 320 MI: Attached is a copy of the publicity for the credited elements of this service this year. ___ 320 MI: Attached is a copy of one page of the log, or 3 letters if using letters or other like records to document the service. ___ 320 MI: We are continuing to keep our FIRM updated and maintain old copies of our FIRM. ___ 330 OP: We continue to conduct or provide all credited outreach projects. ___ 350 LIB/LPD: Our public library continues to maintain flood protection materials. ___ 350 WEB: We continue to conduct an annual review and update of the information and links in our flood protection website. ___ 420 OSP: We continue to preserve our open space in the floodplain. ___ 430: We continue to enforce the floodplain management provisions of our zoning, subdivision and building code ordinances for which we are receiving credit. [____] Initial here if you have amended your floodplain regulations. Attach a copy of the amended regulations, provide a summary of the changes and mark up the regulations indicating what’s been changed. ___ 440 AMD: We continue to use and update our flood data maintenance system on an annual basis as needed. ___ 450 SMR: We continue to enforce the stormwater management provisions of our zoning, subdivision and building code ordinances for new developments in the wa- tershed. [____] Initial here if you have amended your stormwater management regu- lations that will impact your CRS program. Attach a copy of the amended regulations, provide a summary of the changes and mark up the regulations indicating what’s been changed. ___ 450 ESC/WQ: We continue to enforce the provisions of our zoning, subdivision and building codes as they pertain to erosion and sediment control and water quality. ___ 502 RL: We currently have ____repetitive loss properties and send our notice to ____ properties in the repetitive loss areas. ___ 502 RL: Attached is a copy of this year's notice on property protection, flood insurance and financial assistance that we sent to our repetitive loss areas. SL SL SL SL SL SL SL SL SL 88 SL SL SL SL Community Northampton, City of State MA CID 250167 County Hampshire COMMUNITY RATING SYSTEM ANNUAL RECERTIFICATION Community Certifications CC-213-3 Edition: 2017 ___ 510 FMP: Attached is a copy of our floodplain management plan's annual progress report for the action items contained in the plan. We have included a progress report template for you to use (in the email notification) if you don’t have one of your own. ___ 510 FMP: We have provided copies of this/these progress report(s) to our governing board and local media. Additional Comments: Attachments: SL SL CRS Activity 510 Annual Progress Report on Implementation of Credited Plan Which Plan is this for (use separate templates for each credited Plan): Floodplain Management Plan (Hazard Mitigation Plan) Repetitive Loss Area Analysis Floodplain Species Plan Substantial Damage Plan Name of Community: Date this Annual Progress Report was prepared (not the date of adoption of the credited Plan): Name of Plan: Date of Adoption of Plan: 5 Year CRS Expiration Date: 1.How can a copy of the credited Plan be obtained: 2.Describe how this annual progress report (not the credited Plan) was preparedand how it was submitted to the governing body, released to the media, and madeavailable to the public: 3.Provide a description of the implementation of each recommendation or action itemin the action plan or area analysis report, including a statement on how the projectwas implemented or not implemented during the previous year: 4.Discuss why any objectives were not reached or why implementation is behindschedule: 5.What are the recommendations for new projects or revised recommendations? Northampton, Massachusetts May 1, 2022 May, 2026 Available online at https://northamptonma.gov/DocumentCenter/View/15793/20102-Northampton- HMP_2020_Update City of Northampton Multi-Hazard Mitigation Plan 2020 Emailed to CEO and made available online No new recommendations at this time Plan is current, ongoing actions are underway Notably, flood control system maintenance and inspections have been completed or are underway. WWTP upgrade plans have been developed and implemented