Loading...
82 Bridge Trench Permit 2019-10-21Mark Follett Project Manager Western Builders 73 Pleasant St. Granby, MA 01033 Mobile: 413.537.1683 Office: 413.437.5071 Email: mfollett@westernbuilders.com Louis Hasbrouck <lhasbrouck@northamptonma.gov> RE: [EXTERNAL] Trench Permit for 82 Bridge Street 1 message Follett, Mark <mfollett@westernbuilders.com>Mon, Oct 21, 2019 at 11:13 AMTo: Greg Newman <gnewman@northamptonma.gov> Cc: Donna LaScaleia <dlascaleia@northamptonma.gov>, Mike Antosz <mantosz@northamptonma.gov>, Louis Hasbrouck <lhasbrouck@northamptonma.gov>, Ann Furciniti <afurciniti@northamptonma.gov>, Steve Follett <Sfollett@gagliarducci.com>, "Boino, Christopher" <cboino@westernbuilders.com> Good morning Mike, Greg, Donna, and Louis Can you let me know if leaving the road in its current state is acceptable unl the spring. Aer speaking with the site/paving contractor we believe the road is in good shape to get through the winter. In the meanme, we would pave the driveway with binder and ramp up the binder at any areas that need access. We are currently waing for Columbia Gas to install their new feed and meter to the building. Once this is complete we will repair the sidewalks, which we have not touched at this me as part of this project. Can you please let me know if anybody has any issues with the above plan and if it would have any impact on anyone’s recommendaon for a TCO that would be ancipated in March? All final top would be applied shortly thereaer as soon as the plants open up in the spring. We are aware our permits expire this year and will need to renewed for work to be completed next year. Below is a revised summary of what we would ask permission for at this me: · The roadway pavement patch must be completed with prior to November 15th. – Looking to leave street in current state unl Spring and asphalt plants re- open. · The concrete sidewalk must be completed prior to November 15th. The Owner/Contractor shall be responsible for keeping sidewalk clear of ice and snow throughout the cold season. Do not apply materials containing salt to new sidewalks for at least 90 days in order to allow concrete and sealer to cure. – We will follow this recommendaon and try to complete ASAP. · The driveway entrance (from roadway to sidewalk) shall be final paved prior to November 15th. – We would request binder (ramped to avoid trip hazard) · The driveway beyond the sidewalk shall be paved with binder course (as a minimum) prior November 15th. It is also required that the contractor shall protect the sidewalk by installing a pavement ramp/transion from the driveway binder course to the top of the concrete sidewalk. – This would be completed as described. Greg thank you for your me last week. Thank you, Mark From: Greg Newman [mailto:gnewman@northamptonma.gov] Sent: Friday, October 18, 2019 10:39 AM To: Folle, Mark <mfollett@westernbuilders.com> Cc: Donna LaScaleia <dlascaleia@northamptonma.gov>; Mike Antosz <mantosz@northamptonma.gov>; Louis Hasbrouck <lhasbrouck@northamptonma.gov>; Ann Furcini <afurciniti@northamptonma.gov> Subject: [EXTERNAL] Trench Permit for 82 Bridge Street Mark This email is submitted in response to a request (10/17/2019) for guidance regarding work under the current Trench Permit for 82 Bridge Street by Mark Follett (Western Builders, 413-537-1683). All hardscapes within the City Right of Way must be completed prior to November 15th. This includes: 1. The roadway pavement patch must be completed with prior to November 15th. 2. The concrete sidewalk must be completed prior to November 15th. The Owner/Contractor shall be responsible for keeping sidewalk clear of ice and snow throughout the cold season. Do not apply materials containing salt to new sidewalks for at least 90 days in order to allow concrete and sealer to cure. 3. The driveway entrance (from roadway to sidewalk) shall be final paved prior to November 15th. 4. The driveway beyond the sidewalk shall be paved with binder course (as a minimum) prior November 15th. It is also required that the contractor shall protect the sidewalk by installing a pavement ramp/transition from the driveway binder course to the top of the concrete sidewalk. Please note that the City Building Department should be contacted to determine if there are any additional requirements proposed site work during the winter season Regards, Greg -- Greg Newman, P.E. Senior Engineer Northampton DPW125 Locust Street Northampton, MA 01060 413-587-1570 x4307 . . . This electronic mail message and any attachments thereto may contain confidential and/or privileged information intended only for the addressee(s) named herein. If you are not the intended recipient, you are hereby notified that the reading, disclosure, copying, distribution or use of all or any part of this communication is strictly prohibited. If you received this transmission in error, please permanently delete it and any copy or printout thereof and notify our e-mail security officer immediately either by telephone at 413-540-1401 or by sending an electronic message to support@oconnells.com.