82 Bridge Plan-TCO email 2020-02-11Louis Hasbrouck <lhasbrouck@northamptonma.gov>
21611 Sergeant House |82 Bridge St
1 message
Kyle Young <kyley@dietzarch.com>Mon, Feb 10, 2020 at 3:54 PM
To: Louis Hasbrouck <lhasbrouck@northamptonma.gov>
Cc: Jonathan Flagg <jflagg@northamptonma.gov>, Kerry Dietz <kerryd@dietzarch.com>
Louis,
Just wanted to follow up on the TCO plan conversation we had a few weeks back. I hope you received the current drawing set.
The project team and I wanted to follow up with you regarding the plan for temporary occupancy. I have alerted all my consultants to make them aware of
the substantial completion documentation that will be required. I think we want to touch base just to understand that we are preparing everything on site
that you will require for temp. occupancy. Is there a checklist or synopsis of what you will be requiring?
-One question was the sprinkler system and the extent of the coverage/ can we separate the occupied area and the construction area temporarily for the
TCO or should the entire system be on including construction areas?
We just want to keep you informed of our plan and progress so there are no surprises. Please get back to me at your earliest convenience. I also
remember you saying you were interested in walking the site to understand the egress as well.
Let me know if there is anything else you need.
Kyle Young
Job Captain
Dietz & Company Architects, Inc.
55 Frank B. Murray Street, Suite 201
Springfield, MA 01103
Direct: (413) 846-1013
Office: (413) 733-6798 ext. 123
www.dietzarch.com
Design that looks good, does good.
From: Louis Hasbrouck <lhasbrouck@northamptonma.gov>
Sent: Friday, January 24, 2020 2:41 PM
To: Kyle Young <kyley@dietzarch.com>
Cc: Jonathan Flagg <jflagg@northamptonma.gov>
Subject: 82 Bridge St plans
Kyle,
As I said earlier, the most recent full plan set we have is the 9/28/18 set with revisions through 3/1/19.
The floorplans you just sent include revisions as recently as 1/14/20. I'm pretty sure other sheets have been revised since
March 2019.
We need a current set of plans. I'm not sure how you keep plans, but there should be a full current electronic set somewhere
and there should be a copy of the most recent set on site.
We need to keep up with the changes. I'm asking for a "working set", whatever the contractors are working from.
Louis Hasbrouck
Building Commissioner
City of Northampton
Town of Williamsburg
(413) 587-1240 office
(413) 587-1272 fax