Loading...
MEP - Final Construction Control_BERVersion 06_11_2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the Ninth Edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: North Commons Date: January 7, 2022 Property Address: 140 Olander Drive – Northampton, MA 01060 Project: Check (X) One or Both as applicable: [X] New Construction [ ] Existing Construction Project Description: New building (Residential apartment building). I, Steven A. Karan, PE, MA Registration Number: 34989, Expiration Date: 06/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [X] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this Code. Nothing in this document relieves the Contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a “wet” or electronic signature and seal: \ Phone Number: (508) 230-0260 Email: skaran@ber-engineering.com Building Engineering Resources, Inc. Building Official Use Only Building Official Name: ___________________________ Permit No. ________________________ Date: ________________ Version 06_11_2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the Ninth Edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: North Commons Date: January 7, 2022 Property Address: 140 Olander Drive – Northampton, MA 01060 Project: Check (X) One or Both as applicable: [X] New Construction [ ] Existing Construction Project Description: New buildnkig (Residential apartment building). I, Daniel J. Carroll, PE, MA Registration Number: 41495, Expiration Date: 06/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [X] Electrical [ ] Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this Code. Nothing in this document relieves the Contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a “wet” or electronic signature and seal: \ Phone Number: (508) 230-0260 Email: dcarroll@ber-engineering.com Building Engineering Resources, Inc. Building Official Use Only Building Official Name: ___________________________ Permit No. ________________________ Date: ________________ Version 06_11_2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the Ninth Edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: North Commons Date: January 7, 2022 Property Address: 140 Olander Drive – Northampton, MA 01060 Project: Check (X) One or Both as applicable: [X] New Construction [ ] Existing Construction Project Description: New building (Residential apartment building). I, Steven A. Karan, PE, MA Registration Number: 34989, Expiration Date: 06/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [X] Other: Plumbing for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this Code. Nothing in this document relieves the Contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a “wet” or electronic signature and seal: \ Phone Number: (508) 230-0260 Email: skaran@ber-engineering.com Building Engineering Resources, Inc. Building Official Use Only Building Official Name: ___________________________ Permit No. ________________________ Date: ________________ Version 06_11_2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the Ninth Edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: North Commons Date: January 7, 2022 Property Address: 140 Olander Drive – Northampton, MA 01060 Project: Check (X) One or Both as applicable: [X] New Construction [ ] Existing Construction Project Description: New building (Residential apartment building). I, Steven A. Karan, PE, MA Registration Number: 34989, Expiration Date: 06/30/2022, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [ ] Mechanical [X] Fire Protection [ ] Electrical [ ] Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this Code and the design concept, shop drawings, samples and other submittals by the Contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this Code. Nothing in this document relieves the Contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a “wet” or electronic signature and seal: \ Phone Number: (508) 230-0260 Email: skaran@ber-engineering.com Building Engineering Resources, Inc. Building Official Use Only Building Official Name: ___________________________ Permit No. ________________________ Date: ________________