Loading...
Russell Joel Letter SS 76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Coleman D. Larsen, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com December 30, 2022 Ken Trappen Advanced Solar Solutions 2372 Morse Avenue #912 Irvine, CA 92614 Re: Engineering Services Russell Residence 25 Kensington Avenue apt 1, Northampton, MA 7.600 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B. Description of Structure: Roof Framing: Assumed 2x6 dimensional lumber at 29” on center. Roof Material: Composite Asphalt Shingles Roof Slope: 39.8. 42.5 degrees Attic Access: Inaccessible Foundation: Permanent C. Loading Criteria Used • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 PSF • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 psf • Live Load = 20 psf (reducible) – 0 psf at locations of solar panels • Ground Snow Load = 40 psf • Wind Load based on ASCE 7-10 o Ultimate Wind Speed = 117 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the 2015 IRC, including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity elements and 110% for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installed correctly. Page 2 of 2 D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent RT Mini installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non - uniformly, our office should be notified before proceeding with the installation. 2. The maximum allowable withdrawal force for a 5mm x 60mm wood screw in ½” plywood/OSB board is 43 lbs per screw (per APA technical note E830d). Considering the variable factors for the existing roof framing and installation tolerances, we require that a minimum (1) screw be attached to the existing rafter/truss min 1 ½” penetration (310 lbs) with the balance of the screws (5) connected into the existing decking (5 x 43 = 215 lbs) (total uplift = 525 lbs). Based on this, the connections will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of rafters, and condition of the roof, the panel supports shall be placed no greater than 48” on centers. 4. Panel supports connections shall be staggered to distribute load to adjacent framing members. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the 2015 IRC, current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE MA License No. 50507 12/30/2022