001_608413_100% Design PlansROCKY HILL ROAD SIDEWALK BEGIN
STA 0+00
N2938339.1949
E341562.7184
ROCKY HILL ROAD SIDEWALK END
STA 5+79.99
N2938546.7589
E342028.4343
ROCKY HILL GREENWAY
MULTI-USE TRAIL END
STA 25+99.87
N2937482.5679
E343496.6877
ROCKY HILL GREENWAY
MULTI-USE TRAIL BEGIN
STA 0+00.01
N2938622.2072
E341979.9102 608143_HD(TITLE_SHEET).DWG10-Jun-2022 12:03 PMPlotted onFED. AID PROJ. NO.TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-1 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TITLE SHEET & INDEX
LENGTH OF PROJECT = 3166.78 FEET = 0.599 MILES
SHEET
NO.
DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
APPROVED:
DIVISION ADMINISTRATOR DATE DATE
CHIEF ENGINEER DATE
RECOMMENDED FOR APPROVAL
APPROVED
HIGHWAY ADMINISTRATOR
100% DESIGN SUBMISSION (REV 1)
500
SCALE: 1" = 500'
0 1000 1500 2000
ROCKY HILL GREENWAY
MULTI-USE TRAIL
PROJECT
LOCATION
ICE
POND
DR
IVE
DESIGN DESIGNATION
DESIGN SPEED N/A
ADT (2004)N/A
ADT (DESIGN YEAR)N/A
K N/A
D N/A
T (PEAK HOUR)N/A
T (AVERAGE DAY)N/A
DHV N/A
DDHV N/A
FUNCTIONAL CLASSIFICATION N/A
EASTHAMPTON R
OAD (R
OUTE 10)
N
NOTE:
HORIZONTAL DATUM IS MASS GRID.
Sustainable Environmental Solutions
www.horsleywitten.com
90 Route 6A
Sandwich, MA 02563
508-833-6600 voice
508-833-3150 fax
Horsley Witten Group, Inc.
ROCK
Y
HI
L
L
R
O
A
D (
R
O
U
T
E
6
6)
THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS FOR HIGHWAYS AND BRIDGES DATED 2020, THE 2017 CONSTRUCTION STANDARD
DETAILS, THE 1996 CONSTRUCTION AND TRAFFIC STANDARD DETAILS, (AS RELATED TO TRAFFIC
STANDARD DETAILS ONLY), THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR
STREETS AND HIGHWAYS WITH MASSACHUSETTS AMENDMENTS,
THE 1990 STANDARD DRAWINGS FOR SIGNS AND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR
TRAFFIC SIGNALS AND HIGHWAY LIGHTING, AND THE LATEST EDITION OF THE AMERICAN
STANDARD FOR NURSERY STOCK, WILL GOVERN.OLD WILSON ROADHAMPSHIRE
COUNTY
HOUSE OF
CORRECTIONS
VALLEY
RECYCLING
GROVE STREET
80' ELECTRICAL
EASEMENT
Sheet List Table
Sheet Number Sheet Title
1 TITLE-DOT (DESIGN)
2 LEGEND-DOT (DESIGN)
3 KEY PLAN
4 TYPICAL SECTIONS
5 BASE PLAN (1)
6 BASE PLAN (2)
7 CONSTRCUTION PLANS (1)
8 CONSTRUCTION PLANS (2)
9 CONSTRUCTION PLANS (3)
10 ROCKY HILL GREENWAY PROFILE PLAN (1)
11 ROCKY HILL GREENWAY PROFILE PLAN (2)
12 ROCKY HILL RD SIDEWALK PROFILE
13 GRADING PLAN (1)
14 GRADING PLAN (2)
15 GRADING PLAN (3)
16 SIGNS AND MARKINGS PLAN (1)
17 SIGNS AND MARKINGS PLAN (2)
19 TRAFFIC SIGNAGE DETAILS
20 TRAFFIC MANAGEMENT (1)
21 TRAFFIC MANAGEMENT (2)
22 DETAILS (1)
23 DETAILS (2)
24 DETAILS (3)
25 DETAILS (4)
26 LANDSCAPE PLAN (1)
27 LANDSCAPE PLAN (2)
28 LANDSCAPE DETAILS
29 CROSS SECTIONS - ROCKY HILL SIDEWALK (1)
30 CROSS SECTIONS - ROCKY HILL SIDEWALK (2)
31 CROSS SECTIONS - ROCKY HILL SIDEWALK (3)
32 CROSS SECTIONS - MULTI USE TRAIL
33 CROSS SECTIONS - MULTI USE TRAIL (2)
34 CROSS SECTIONS - MULTI USE TRAIL (3)
35 CROSS SECTIONS - MULTI USE TRAIL (4)
36 CROSS SECTIONS - MULTI USE TRAIL (5)
37 CROSS SECTIONS - MULTI USE TRAIL (6)
38 CROSS SECTIONS - MULTI USE TRAIL (7)
39 CROSS SECTIONS - MULTI USE TRAIL (8)
40 CROSS SECTIONS - MULTI USE TRAIL (9)
41 CROSS SECTIONS - MULTI USE TRAIL (10)
42 CROSS SECTIONS - MULTI USE TRAIL (11)
43 CROSS SECTIONS - MULTI USE TRAIL (12)
44 CROSS SECTIONS - MULTI USE TRAIL (13)
45 CROSS SECTIONS - MULTI USE TRAIL (14)
46 CROSS SECTIONS - MULTI USE TRAIL (15)
47 CROSS SECTIONS - MULTI USE TRAIL (16)
NEW HAVEN AND
NORTHAMPTON
CANAL GREENWAY
DATE DESCRIPTION REV #
08/04/2016 25% DESIGN SUBMISSION 1
11/27/2017 25% DESIGN SUBMISSION (REV 1)2
12/10/2019 75% DESIGN SUBMISSION 3
05/12/2020 75% DESIGN SUBMISSION (REV 1)4
12/18/2020 100% DESIGN SUBMISSION 5
06/10/2022 100% DESIGN SUBMISSION (REV 1)6
608143_HD(LEGEND_&_NOTES).DWG10-Jun-2022 12:03 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-2 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
LEGEND
TRAFFIC SYMBOLS
EXISTING PROPOSED DESCRIPTION
CONTROLLER PHASE ACTUATED
TRAFFIC SIGNAL HEAD (SIZE AS NOTED)
WIRE LOOP DETECTOR (6' x 6' TYP UNLESS OTHERWISE SPECIFIED)
VIDEO DETECTION CAMERA
MICROWAVE DETECTOR
PEDESTRIAN PUSH BUTTON, SIGN (DIRECTIONAL ARROW AS SHOWN) AND SADDLE
EMERGENCY PREEMPTION CONFIRMATION STROBE LIGHT
VEHICULAR SIGNAL HEAD
VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED
FLASHING BEACON
PEDESTRIAN SIGNAL HEAD, (TYPE AS NOTED OR AS SPECIFIED)
RAILROAD SIGNAL
SIGNAL POST AND BASE (ALPHA-NUMERIC DESIGNATION NOTED)
MAST ARM, SHAFT AND BASE (ARM LENGTH AS NOTED)
HIGH MAST POLE OR TOWER
SIGN AND POST
SIGN AND POST (2 POSTS)
MAST ARM WITH LUMINAIRE
OPTICAL PRE-EMPTION DETECTOR
CONTROL CABINET, GROUND MOUNTED
CONTROL CABINET, POLE MOUNTED
FLASHING BEACON CONTROL AND METER PEDESTAL
LOAD CENTER ASSEMBLY
PULL BOX 12"x12" (OR AS NOTED)
ELECTRIC HANDHOLE 12"x24" (OR AS NOTED)
TRAFFIC SIGNAL CONDUIT
PAVEMENT MARKINGS SYMBOLS
EXISTING PROPOSED DESCRIPTION
PAVEMENT ARROW - WHITE
LEGEND "ONLY" - WHITE
STOP LINE
CROSSWALK
SOLID WHITE LINE
SOLID YELLOW LINE
BROKEN WHITE LINE
BROKEN YELLOW LINE
DOTTED WHITE LINE
DOTTED YELLOW LINE
DOTTED WHITE LINE EXTENSION
DOTTED YELLOW LINE EXTENSION
DOUBLE WHITE LINE
DOUBLE YELLOW LINE
ABBREVIATIONS
GENERAL
AADT ANNUAL AVERAGE DAILY TRAFFIC
ABAN ABANDON
ADJ ADJUST
APPROX. APPROXIMATE
A.C.ASPHALT CONCRETE
ACCM PIPE ASPHALT COATED CORRUGATED METAL PIPE
BIT.BITUMINOUS
BC BOTTOM OF CURB
BD.BOUND
BL BASELINE
BLDG BUILDING
BM BENCHMARK
BO BY OTHERS
BOS BOTTOM OF SLOPE
BR.BRIDGE
BVW BORDERING VEGETATED WETLAND
CB CATCH BASIN
CBCI CATCH BASIN WITH CURB INLET
CC CEMENT CONCRETE
CCM CEMENT CONCRETE MASONRY
CEM CEMENT
CI CURB INLET
CIP CAST IRON PIPE
CLF CHAIN LINK FENCE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CSP CORRUGATED STEEL PIPE
CO.COUNTY
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CR GR CROWN GRADE
DHV DESIGN HOURLY VOLUME
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DW STEADY DON'T WALK - PORTLAND ORANGE
DWY DRIVEWAY
ELEV (or EL.)ELEVATION
EMB EMBANKMENT
EOP EDGE OF PAVEMENT
EXIST (or EX)EXISTING
EXC EXCAVATION
F&C FRAME AND COVER
F&G FRAME AND GRATE
FDN. FOUNDATION
FLDSTN FIELDSTONE
GAR GARAGE
GD GROUND
GG GAS GATE
GI GUTTER INLET
GIP GALVANIZED IRON PIPE
GRAN GRANITE
GRAV GRAVEL
GRD GUARD
HDW HEADWALL
HMA HOT MIX ASPHALT
HOR HORIZONTAL
HYD HYDRANT
INV INVERT
JCT JUNCTION
L LENGTH OF CURVE
LB LEACH BASIN
LOD LIMIT OF DISTURBANCE
LP LIGHT POLE
LT LEFT
MAHW MEAN ANNUAL HIGH WATER
MAX MAXIMUM
MB MAILBOX
MH MANHOLE
MHB MASSACHUSETTS HIGHWAY BOUND
MIN MINIMUM
NIC NOT IN CONTRACT
NO.NUMBER
OCS OUTLET CONTROL STRUCTURE
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
P.G.L. PROFILE GRADE LINE
PI POINT OF INTERSECTION
POC POINT ON CURVE
POT POINT ON TANGENT
PRC POINT OF REVERSE CURVATURE
PROJ PROJECT
PROP PROPOSED
PSB PLANTABLE SOIL BORROW
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE
PVI POINT OF VERTICAL INTERSECTION
ABBREVIATIONS (cont.)
GENERAL
PVT POINT OF VERTICAL TANGENCY
PVMT PAVEMENT
PWW PAVED WATER WAY
R RADIUS OF CURVATURE
R&D REMOVE AND DISPOSE
RCP REINFORCED CONCRETE PIPE
RD ROAD
RDWY ROADWAY
REM REMOVE
RET RETAIN
RET WALL RETAINING WALL
ROW RIGHT OF WAY
RR RAILROAD
R&R REMOVE AND RESET
R&S REMOVE AND STACK
RT RIGHT
SB STONE BOUND
SHLD SHOULDER
SMH SEWER MANHOLE
ST STREET
STA STATION
SSD STOPPING SIGHT DISTANCE
SHLO STATE HIGHWAY LAYOUT LINE
SW SIDEWALK
T TANGENT DISTANCE OF CURVE/TRUCK %
TAN TANGENT
TEMP TEMPORARY
TC TOP OF CURB
TOS TOP OF SLOPE
TYP TYPICAL
UP UTILITY POLE
VAR VARIES
VERT VERTICAL
VC VERTICAL CURVE
WCR WHEEL CHAIR RAMP
WF WETLAND FLAG
WG WATER GATE
WIP WROUGHT IRON PIPE
WM WATER METER/WATER MAIN
X-SECT CROSS SECTION
TRAFFIC SIGNAL
CAB. CABINET
CCVE CLOSED CIRCUIT VIDEO EQUIPMENT
DW STEADY DON'T WALK
FDW FLASHING DON'T WALK
FR FLASHING CIRCULAR RED
FRL FLASHING RED LEFT ARROW
FRR FLASHING RED RIGHT ARROW
FY FLASHING CIRCULAR AMBER
FYL FLASHING AMBER LEFT ARROW
FYR FLASHING AMBER RIGHT ARROW
G STEADY CIRCULAR GREEN
GL STEADY GREEN LEFT ARROW
GR STEADY GREEN RIGHT ARROW
GSL STEADY GREEN SLASH LEFT ARROW
GSR STEADY GREEN SLASH RIGHT ARROW
GV STEADY GREEN VERTICAL ARROW
OL OVERLAP
PED PEDESTRIAN
PTZ PAN, TILE, ZOOM
R STEADY CIRCULAR RED
RL STEADY RED LEFT ARROW
RR STEADY RED RIGHT ARROW
TR SIG TRAFFIC SIGNAL
TSC TRAFFIC SIGNAL CONDUIT
W STEADY WALK
Y STEADY CIRCULAR AMBER
YL STEADY AMBER LEFT ARROW
DBYL
DBWL
BWL
SWL
CW
ONLY
SL
DYLEx
DWLEx
DYL
BYL
DWL
SYL
20'
20'
1
M*
RRSG
GENERAL SYMBOLS
EXISTING PROPOSED DESCRIPTION
JERSEY BARRIER
CATCH BASIN
CATCH BASIN CURB INLET
FLAG POLE
GAS PUMP
MAIL BOX
POST SQUARE
POST CIRCULAR
WELL
ELECTRIC HANDHOLE
FENCE GATE POST
GAS GATE
BORING HOLE
MONITORING WELL
TEST PIT
HYDRANT
LIGHT POLE
COUNTY BOUND
GPS POINT
CABLE MANHOLE
DRAINAGE MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
MISC MANHOLE
SEWER MANHOLE
TELEPHONE MANHOLE
WATER MANHOLE
MASSACHUSETTS HIGHWAY BOUND
MONUMENT
STONE BOUND
TOWN OR CITY BOUND
TRAVERSE OR TRIANGULATION STATION
TROLLEY POLE OR GUY POLE
TRANSMISSION POLE
UTILITY POLE W/ FIREBOX
UTILITY POLE WITH DOUBLE LIGHT
UTILITY POLE W / 1 LIGHT
UTILITY POLE
BUSH
TREE
STUMP
SWAMP / MARSH
WATER GATE
PARKING METER
SILT SACK
OVERHEAD CABLE/WIRE
CURBING
CONTOURS (ON-THE-GROUND SURVEY DATA)
CONTOURS (PHOTOGRAMMETRIC DATA)
UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)
BALANCED STONE WALL
GUARD RAIL - STEEL POSTS
GUARD RAIL - WOOD POSTS
CHAIN LINK OR METAL FENCE
WOOD PEDESTRIAN BARRIER
HAY BALES/SILT FENCE
TREE LINE
SAWCUT LINE
TOP OR BOTTOM OF SLOPE
LIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAY
BANK OF RIVER OR STREAM
BORDER OF WETLAND
100 FT WETLAND BUFFER
200 FT RIVERFRONT BUFFER
STATE HIGHWAY LAYOUT
TOWN OR CITY LAYOUT
COUNTY LAYOUT
RAILROAD SIDELINE
TOWN OR CITY BOUNDARY LINE
PROPERTY LINE OR APPROXIMATE PROPERTY LINE
EASEMENT
COMPOST SOCK
TURTLE FENCE / SILT FENCE
COMPOST FILTER TUBE
TREE REMOVAL
LIMIT OF DISTURBANCE
JB
CB
FP
GP
MB
WELL
EHH
GG
BHL #
MW #
TP #
MHB
TPL or GUY
UFB
UPDL
ULT
UPL
WG
PM
CB
SF
20'
CFT
ROCKY HILL GREENWAY END
STA 25+99.87
N2937482.5679
E343496.6877
ROCKY HILL RD SIDEWALK END
STA 5+79.96
N2938546.7589
E342028.4343
CROSSWALK BEGIN
STA 0+00
N2938360.9260
E341500.7297
ROCKY HILL RD SIDEWALK BEGIN
STA 0+00
N2938339.1949
E341562.7184XCROSSWALK END
STA 1+03.90
N2938348.1808
E341573.1937
ROCKY HILL GREENWAY BEGIN
STA 0+00
N2938622.8262
E341980.8583 608143_HD(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on80
SCALE: 1" = 80'
0 200 300
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-3 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
KEY PLAN
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
NSEE SHEET 7 & 13
SEE SHEET 9
&
1
5 SEE SHEET 8 & 14ROCKY HILL ROADN
E
W
H
A
V
E
N
A
N
D
N
O
R
T
H
A
M
P
T
O
N
C
A
N
A
L
G
R
E
E
N
W
A
Y
608143_HD(DETAILS).DWG10-Jun-2022 12:04 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-4 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TYPICAL SECTIONS
PAVEMENT TYPE 1 NOTES
PROPOSED FULL DEPTH PAVEMENT
SURFACE COURSE: 1 1/2" SUPERPAVE - 9.5 (SSC-9.5) OVER
INTERMEDIATE COURSE: 2 LIFTS OF 2" SUPERPAVE - 12.5 (SIC-12.5) OVER
BASE:8" GRAVEL BORROW (M1.03.0 TYPE B)
TYPICAL 16' ROCKY HILL GREENWAY MULTI-USE TRAIL / DRIVEWAY
CROSS SECTION
STA 1+00.00 TO 7+77.39
NOT TO SCALE
TYPICAL 10' ROCKY HILL GREENWAY MULTI-USE TRAIL W/ SWALE
CROSS SECTION
STA 10+35.83 TO STA 13+85.99
NOT TO SCALE
TYPICAL 10' ROCKY HILL GREENWAY MULTI-USE TRAIL W/ SWALE
CROSS SECTION
STA 23+05.30 TO STA 25+39.50
NOT TO SCALE
10' PAVED TRAIL
℄
1.5%
1.5' WIDE VEGETATED
GRASS SWALE
9"
TYP.
2'2'6' TYP.
10' PAVED TRAIL
℄
COMPACTED BASE
(SEE PAVEMENT TYPE 2
DETAIL)
1.5%
1.5' WIDE VEGETATED
GRASS SWALE
9"
TYP.
2'2'6' TYP.
2:1 MAX. SIDE SLOPE TO EXISTING
GRADE. 4" LOAM (M1.05.0) AND
SEED (SEE LANDSCAPE PLANS)
16' PAVED TRAIL
℄
1.5%
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
3:1 MAX. SIDE SLOPE TO
EXISTING GRADE. 4" LOAM
(M1.05.0) AND SEED (SEE
LANDSCAPE PLANS)COMPACTED BASE
(SEE PAVEMENT TYPE 1
DETAIL)
2'2'
TYPICAL 10' ROCKY HILL GREEN WAY MULTI-USE TRAIL
CROSS SECTION
STA 7+77.39 TO 10+35.83
STA 13+85.99 TO STA 15+50.00
STA 25+39.50 TO 26+00.00
NOT TO SCALE
10' PAVED TRAIL
℄
1.5%
COMPACTED BASE
(SEE PAVEMENT TYPE 2
DETAIL)
2'2'
TYPICAL ROCKY HILL ROAD SIDEWALK W/ RETAINING WALL
CROSS SECTION
STA 4+80.00 TO STA 5+69.00
NOT TO SCALE
8' PAVED SIDEWALK
1:6
MAX
℄
3.5'
MAX
BLOCK RETAINING WALL
8" OF GRAVEL BORROW (M1.03.0 TYPE b)
SHOULDER
WOOD PEDESTRIAN
BARRIER
COMPACTED SUBBASE
(SEE PAVEMENT TYPE 2
DETAIL)
1.5%
MATCH TO EXISTING GRADE
TYPICAL ROCKY HILL ROAD SIDEWALK
CROSS SECTION
STA 0+00.00 TO STA 2+19.00
STA 3+50.00 TO STA 4+80.00
NOT TO SCALE
8' PAVED SIDEWALK
1:6
MAX
℄
2'
COMPACTED SUBBASE (SEE
PAVEMENT TYPE 2 DETAIL)
1.5%
MATCH TO
EXISTING GRADE
TYPICAL ROCKY HILL ROAD SIDEWALK
W/ MODIFIED STONE
CROSS SECTION
STA 2+19.00 TO STA 3+50.00
NOT TO SCALE
1' +/-
HEIGHT VARIES
(4' MAX)
ROCKY HILL RD SIDEWALK ROCKY HILL GREENWAY MULTI-USE TRAIL
REMOVE AND RESET
EXISTING CURB
EXISTING PAVEMENT
4' SHOULDEREXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING
5' BIKE LANE
EXISTING GRASS SHOULDER
TYPICAL 10' ROCKY HILL GREEN WAY MULTI-USE TRAIL W/ WOOD BARRIER
CROSS SECTION
STA 15+50.00 TO 20+76.10
NOT TO SCALE
10' PAVED TRAIL
℄
1.5%
2'2'
WOOD PEDESTRIAN
BARRIER VARIES SEE
PLAN FOR LOCATION
℄
NOTES:
1. EXISTING ROAD CROSS SECTION VARIES
CONTRACTOR TO VERIFY IN THE FIELD.
2. NO CONSTRUCTION IS PROPOSED IN THE
EXISTING ROAD.
3. 0.5% TOLERANCE FOR CONSTRUCTION OF
PATH CROSS SLOPES.
NOTES:
1. EXISTING ROAD CROSS SECTION VARIES
CONTRACTOR TO VERIFY IN THE FIELD.
2. NO CONSTRUCTION IS PROPOSED IN THE
EXISTING ROAD.
3. 0.5% TOLERANCE FOR CONSTRUCTION OF
PATH CROSS SLOPES.
PAVED SURFACE
(SEE PAVEMENT TYPE 2
DETAIL)
PAVED SURFACE
(SEE PAVEMENT TYPE 2 DETAIL)
6" X 18"
GRANITE CURB
8' PAVED SIDEWALK
1:1
MAX℄
2.5' MAX 12" DEPTH MODIFIED ROCKFILL SLOPE STABILIZATION
COMPACTED SUBBASE (SEE
PAVEMENT TYPE 2 DETAIL)
1.5%
MATCH TO EXISTING GRADE
REMOVE AND RESET
EXISTING CURB
EXISTING
PAVEMENT
4' SHOULDEREXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING
5' BIKE LANE
EXISTING GRASS SHOULDER
℄
PAVED SURFACE
(SEE PAVEMENT TYPE 2 DETAIL)
6" X 18"
GRANITE CURB
GENERAL PAVEMENT NOTES:
1. SUB-GRADE (EXISTING MATERIAL) SHALL CONSIST OF GRANULAR MATERIAL - GRAVEL, CRUSHED STONE, RECLAIMED MATERIAL OR A COMBINATION OF
THESE MATERIALS. EXCAVATE SANDY-LOAM AND/OR LOAMY-SAND TOPSOIL MATERIAL FROM ALL PAVED AREAS PRIOR TO SUB-BASE INSTALLATION.
3. COMPACT SUB-GRADE FILL TO 95% COMPACTION.
4. COMPACT BASE COURSE TO 95% COMPACTION.
5. SEE SITE LAYOUT PLAN FOR PAVEMENT WIDTH AND LOCATION.
6. SEE GRADING PLANS FOR PAVEMENT SLOPE AND CROSS SLOPE.
7. SWEEP CLEAN THE INTERMEDIATE COURSE SURFACE BY A STREET SWEEPING MACHINE AND APPLY A TACK COAT PER SPECIFICATIONS, PRIOR TO
INSTALLING THE SURFACE COURSE.
PAVEMENT TYPE 1 DETAIL
16' MULTI-USE TRAIL AND PARKING LOT
NOT TO SCALE
APPROVED SUB-BASE
BASE COURSE: 8" GRAVEL BORROW
(M1.03.0 TYPE B)
SURFACE COURSE: 1 1/2" SUPERPAVE
(SSC-9.5)INTERMEDIATE COURSE: 2 LIFTS OF
2" SUPERPAVE
(SIC-12.5)
TACK COAT
NOTES:
1. 0.5% TOLERANCE FOR CONSTRUCTION OF
PATH CROSS SLOPES.
NOTES:
1. 0.5% TOLERANCE FOR CONSTRUCTION OF PATH CROSS SLOPES.
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0)
AND SEED (SEE
LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0) AND
SEED (SEE
LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
1.5'
PAVEMENT TYPE 2 DETAIL
SIDEWALK AND 10' MULTI-USE TRAIL
NOT TO SCALE
COMPACTED BASE
(SEE PAVEMENT TYPE 2
DETAIL)
COMPACTED BASE
(SEE PAVEMENT
TYPE 2 DETAIL)
6" THICK LAYER OF 3/4"
CRUSHED STONE
(M2.01.4)
NON-WOVEN GEOTEXTILE FABRIC
FOR SUBSURFACE DRAINAGE
(M9.50.0) BENEATH STONE
8" OF DENSE GRADED
CRUSHED STONE
(M2.01.7) LEVELING PAD
NON-WOVEN GEOTEXTILE FABRIC FOR
SUBSURFACE DRAINAGE (M9.50.0)
1-1/2" CRUSHED STONE (M2.01.1) TO
EXTEND AT LEAST 12" BEHIND
BLOCKS. SEE RETAINING WALL DETAIL
FOR INTERACTION WITH WOODEN
POST
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
1
2 MAX
1
2 MAX
APPROVED SUB-BASE
BASE COURSE: 8" GRAVEL BORROW
(M1.03.0 TYPE B)
SURFACE COURSE: 1 1/2" SUPERPAVE
(SSC-9.5)INTERMEDIATE COURSE: 2" SUPERPAVE
(SIC-12.5)
TACK COAT
PAVEMENT TYPE 2 NOTES
PROPOSED FULL DEPTH PAVEMENT
SURFACE COURSE: 1 1/2" SUPERPAVE - 9.5 (SSC-9.5) OVER
INTERMEDIATE COURSE: 2" SUPERPAVE - 12.5 (SIC-12.5) OVER
BASE:8" GRAVEL BORROW (M1.03.0 TYPE B)WOOD PEDESTRIAN BARRIER
VARIES SEE PLAN FOR LOCATION
PAVED SURFACE
(SEE PAVEMENT
TYPE 1 DETAIL)
PAVED SURFACE
(SEE PAVEMENT
TYPE 2 DETAIL)
PAVED SURFACE
(SEE PAVEMENT
TYPE 2 DETAIL)
PAVED SURFACE
(SEE PAVEMENT
TYPE 2 DETAIL)
PAVED SURFACE
(SEE PAVEMENT TYPE 2 DETAIL)
SAWCUT
SAWCUT
3:1 MAX. SIDE SLOPE TO
EXISTING GRADE. 4" LOAM
(M1.05.0) AND SEED (SEE
LANDSCAPE PLANS)
3:1 MAX. SIDE SLOPE TO EXISTING
GRADE. 4" LOAM (M1.05.0) AND
SEED (SEE LANDSCAPE PLANS)
3:1 MAX. SIDE SLOPE TO
EXISTING GRADE. 4" LOAM
(M1.05.0) AND SEED (SEE
LANDSCAPE PLANS)
TYP.
EXISTING GRADE
EXISTING GRADE
EXISTING GRADE
EXISTING GRADE
EXISTING GRADE
EXISTING GRADE
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
BLOCK RETAINING WALL
MATCH TO
EXISTING GRADE
1' +/-
HEIGHT VARIES
(4' MAX)
DENSE GRADED
CRUSHED STONE
(M2.01.7) LEVELING PAD
NON-WOVEN GEOTEXTILE FABRIC FOR
SUBSURFACE DRAINAGE (M9.50.0)
1-1/2" CRUSHED STONE (M2.01.1) TO
EXTEND AT LEAST 12" BEHIND
BLOCKS. SEE RETAINING WALL DETAIL
FOR INTERACTION WITH WOODEN
POST
COMPACTED BASE
(SEE PAVEMENT TYPE 1
DETAIL)
PAVED SURFACE
(SEE PAVEMENT
TYPE 1 DETAIL)
WOOD PEDESTRIAN
BARRIER
2.9'
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
2'
0.6'
TYPICAL 10' ROCKY HILL GREEN WAY MULTI-USE TRAIL W/ WOOD BARRIER (ONE SIDE)
CROSS SECTION
STA 20+76.10 TO 23+05.30
NOT TO SCALE
10' PAVED TRAIL
℄
1.5%
2'2'
GRASS SHOULDER
4" LOAM (M1.05.0) AND
SEED (SEE
LANDSCAPE PLANS)
GRASS SHOULDER
4" LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
COMPACTED BASE
(SEE PAVEMENT TYPE 2
DETAIL)
PAVED SURFACE
(SEE PAVEMENT
TYPE 2 DETAIL)
3:1 MAX. SIDE SLOPE TO
EXISTING GRADE. 4"
LOAM (M1.05.0) AND SEED
(SEE LANDSCAPE PLANS)
EXISTING GRADE
WOOD PEDESTRIAN
BARRIER VARIES SEE
PLAN FOR LOCATION
18' PARKING STALL 18' PARKING STALL21' PARKING AISLE
0.25'
ROCKY HILL ROAD60' PUBLIC ROWMATCHLINEMATCHLINEΔ
Δ
Δ CONTINUED ONSHEET NO. 6608143_SV.DWG10-Mar-2015 3:39 PMPlotted onPREPARED BY:
OFSHEETPARS. NO:
FILE NAME:
37-049-001 DATE:
608143_sv.dwg
REV.COMMENTS
REVISIONS
DATE
FIELD BOOK. NO:XXXX
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-
PLAN OF TOPOGRAPHIC SURVEY OF
SCALE: 40 FEET TO THE INCH AS ORDERED BY
THE MASSACHUSETTS DEPARTMENT OF
TRANSPORTATION, HIGHWAY DIVISION
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION
0
SCALE: 1" = 40'
40 160100
FIELD CHIEF: DM
DRAWN BY:CHECKED BY:
ROCKY HILL GREENWAY MULTI-USE TRAIL
ROCKY HILL ROAD
IN THE CITY OF
NORTHAMPTON, MASSACHUSETTS
GSG RAC
Sustainable Environmental Solutions
www.horsleywitten.com
90 Route 6A
Sandwich, MA 02563
508-833-6600 voice
508-833-3150 fax
Horsley Witten Group, Inc.
5 46JUNE 2022
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
BASE PLAN (1)
608413
5 46
SURVEY NOTES
1. THE TOPOGRAPHY AND EXISTING SITE CONDITIONS DEPICTED HEREON ARE THE RESULT OF AN ON THE GROUND FIELD SURVEY
CONDUCTED BY THE HORSLEY WITTEN GROUP, INC. MARCH 26 & 27, 2015. WITH SUPPLEMENTAL FIELD SURVEYS ON AUGUST 23, 2017 &
SEPTEMBER 11, 2017
2. HORIZONTAL DATUM IS MASS STATE PLANE, ESTABLISHED WITH GPS.
3. THE ELEVATIONS DEPICTED HEREON ARE BASED ON NAD83 DATUM.
4. THE PROPERTY LINES AND RIGHTS OF WAYS ARE THE RESULT OF PLANS OF RECORD AND READILY AVAILABLE FIELD SURVEY
MEASUREMENT. IT DOES NOT DEPICT AN AUTHORITATIVE BOUNDARY OPINION.
5. PROPERTY LINES BETWEEN ABUTTING PROPERTY OWNERS ARE APPROXIMATE ONLY.
6. THE ACCURACY OF MEASURED PIPE INVERTS AND PIPE SIZES IS SUBJECT TO FIELD CONDITIONS, THE ABILITY TO MAKE VISUAL
OBSERVATIONS, DIRECT ACCESS TO THE VARIOUS ELEMENTS AND OTHER CONDITIONS.
7. THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AND STRUCTURES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF
VARIOUS UTILITY COMPANIES, AND WHEREVER POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THIS INFORMATION IS NOT TO BE RELIED
UPON AS BEING EXACT OR COMPLETE. THE LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHALL BE VERIFIED IN THE
FIELD PRIOR TO THE START OF ANY CONSTRUCTION. THE CONTRACTOR MUST CONTACT THE APPROPRIATE UTILITY COMPANY, ANY
GOVERNING PERMITTING AUTHORITY IN THE CITY OF NORTHAMPTON, AND "DIGSAFE" (1-888-344-7233) AT LEAST 72 HOURS PRIOR TO ANY
EXCAVATION WORK IN PREVIOUSLY UNALTERED AREAS TO REQUEST EXACT FIELD LOCATION OF UTILITIES.
8. THE WETLAND DELINEATION SHOWN HEREON WAS CONDUCTED BY THE HORSLEY WITTEN GROUP, INC. ON MARCH 26, 2015.
9. REFERENCE PLANS: HAMPSHIRE COUNTY REGISTRY OF DEEDS
1.) PLAN BOOK 119 PAGE 31
2.) PLAN BOOK 17 PAGE 24
3.) PLAN BOOK 53 PAGE 99
4.) PLAN BOOK 196 PAGE 70
5.) PLAN BOOK 23 PAGE 23A
6.) PLAN BOOK 92 PAGE 60
7.) PLAN BOOK 231 PAGE 62
8.) PLAN BOOK 190 PAGE 69 & 70 NSURVEY TRAVERSE TABLE
MATCHLINEMATCHLINECONTINUED ONSHEET NO. 5608143_SV.DWG10-Mar-2015 3:39 PMPlotted onPREPARED BY:
OFSHEETPARS. NO:
FILE NAME:
37-049-001 DATE:
608143_sv.dwg
REV.COMMENTS
REVISIONS
DATE
FIELD BOOK. NO:XXXX
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-
PLAN OF TOPOGRAPHIC SURVEY OF
SCALE: 40 FEET TO THE INCH AS ORDERED BY
THE MASSACHUSETTS DEPARTMENT OF
TRANSPORTATION, HIGHWAY DIVISION
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION
0
SCALE: 1" = 40'
40 160100
FIELD CHIEF: DM
DRAWN BY:CHECKED BY:
ROCKY HILL GREENWAY MULTI-USE TRAIL
ROCKY HILL ROAD
IN THE CITY OF
NORTHAMPTON, MASSACHUSETTS
MC JL/RC
Sustainable Environmental Solutions
www.horsleywitten.com
90 Route 6A
Sandwich, MA 02563
508-833-6600 voice
508-833-3150 fax
Horsley Witten Group, Inc.
6 46FEBRUARY 2016
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
6 46
BASE PLAN (2)
608413
ROCKY HILL ROAD60' PUBLIC ROW1
2 3 4 5 6 7 8 9 10
11
2345
L2 C1 L3
C2
L4
L5 L6 L7
C3
C14C15C16
L20L21 L2216.00'PROP 16' WIDE SHARED
MULTI-USE TRAIL AND
DRIVEWAY
REDUCE TRAIL
WIDTH TO 10'
PROP CULVERT AT STA. 5+85
24' X 29" X 45" RC HEP
(SEE GRADING PLAN & PROP
PROFILE)
PROP WOOD
PEDESTRIAN BARRIER
PROP WOOD
PEDESTRIAN
BARRIER
PROP CULVERT AT
STA. 8+54
26.5' X 2' X 2' BOX
CULVERT
(SEE GRADING PLAN &
PROP PROFILE PLAN)
PROP BOULDERS AT
PATH EDGE (2 TOTAL)
2' OFFSET FROM PATH
PROP WOOD
PEDESTRIAN BARRIER
PROP WOOD
PEDESTRIAN BARRIER
REM EXISTING
12" CMP
MATCHLINE- SHEET 7MATCHLINE- SHEET 8MATCHLINE- SHEET 9REM EXISTING
12" CMP
ROCKY HILL RD SIDEWALK END
STA 5+79.96
N2938546.7589
E342028.4343
PROP
LOD
PROP HEADWALL
PROP STONE
AT PIPE ENDS
PROP HEADWALL
PROP STONE
AT PIPE ENDS
PROP WOOD
PEDESTRIAN
BARRIER
PROP WOOD
PEDESTRIAN
BARRIER
PROP STONE
AT PIPE ENDS
PROP STONE
AT PIPE ENDS
BVW
DISTURBANCE
AREA 288 SF
BVW
DISTURBANCE
AREA 140 SF
BVW
DISTURBANCE
AREA 152 SF
BVW DISTURBANCE
AREA 375 SF
START PROP SWALE
10+28.00
CT OFFSET RT: 10.00
PROP COMPOST
FILTER TUBE (TYP)
+86.32
OFFSET: 5.00
+85.22
OFFSET: 5.00
ELECTRIC COMPANY
EASEMENT PROPERTY
LINE
PROP TREE PROTECTIONSAWCUT AND MATCH
EXISTING GRADE
R&R EXISTING
GRANITE CURBING
PROP SIDEWALK THROUGH
DRIVEWAYS NO CURB RETURN
PROP 8' WIDE
HMA SIDEWALK
R&D EXISTING
SIDEWALK
PROP MODIFIED
ROCKFILL SLOPE
STABILIZATION
SEE DETAIL
BEGIN +00.00
PI +00.67
PI +81.21
PI +77.55
PI +81.10
PI +99.80
PC +28.40
PC +46.80
PC +12.47
PT +51.25
PT +18.25
X+65.83
OFFSET: 10.00
X+66.33
OFFSET: 10.00MATCHLINE- SHEET 7ROCKY HILL GREENWAY BEGIN
STA 0+00
N2938622.8262
E341980.8583
+86.47
OFFSET: 7.00
PROPOSED BIKE PATH CONSTRUCTION BASELINE DATA
NUMBER
L2
C1
L3
C2
L4
L5
L6
L7
C3
STARTING
STATION
PT STA 0+99.80
PC STA 1+46.80
PT STA 1+51.25
PC STA 2+12.47
PT STA 2+18.25
PT STA 7+77.55
PT STA 8+81.21
PT STA 10+00.67
PC STA 11+28.40
NORTHING
2938537.930
2938496.470
2938492.591
2938439.915
2938435.030
2937971.086
2937882.629
2937786.420
2937690.570
EASTING
342033.146
342055.274
342057.457
342088.659
342091.747
342404.110
342458.153
342528.972
342613.396
CURVE DATA
R=100.00' Δ 2°33'03"
L=4.45' T=2.23'
R=100.00' Δ 3°18'42"
L=5.78' T=2.89'
R=100.00' Δ 18°03'00"
L=31.50' T=15.88'
LINE DATA
S28°05'21"E
47.00'
S30°38'24"E
61.22'
S33°57'06"E
559.30'
S31°25'21"E
103.66'
S36°21'24"E
119.46'
S41°22'25"E
127.73'
ENDING
STATION
1+46.80
1+51.25
2+12.47
2+18.25
7+77.55
8+81.21
10+00.67
11+28.40
11+59.90 608143_HD(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on0
SCALE: 1" = 40'
40 160100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-7 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CONSTRCUTION PLANS (1)
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE BELOW NCONTINUED ONSHEET NO. 8REFER TO
SHEET NO. 9
FOR DETAILS
FOR MULTI-USE TRAIL PROFILE:
SEE SHEET 10 & 11
CONTINUED ON
SHEET NO. 9
CFT
CFT CFTCFT
CFTCFTTP 1
TP 2
1
0
11
12
13 14
15 161718
192021
22
2
324 25
26
L7
C3
L8
C4 L9
C5
L10
C6
L11C7 L12 C
8
L13
L14C9
C10L15
C1
1
L16 C12L
1
7C13 L18
INLAND
WETLAND
REPLICATION
AREA 4127 SF
SEE SHEET 28
ROCKY HILL GREENWAY END
STA 25+99.87
N2937482.5679
E343496.6877
REM TREE
TYPPROP WOODPEDESTRIANB
A
R
R
I
E
R
PROP STONE
CHECK DAM
EVERY 50' (TYP)
PROP RESTING AREA
2% MAX W/BENCH
STONE CHECK
DAM EVERY 50'
(TYP)START PROP WOOD
PEDESTRIAN BARRIER
15+50.00
OFFSET RT: 7.00
END PROP WOOD
PEDESTRIAN BARRIER
20+76.78
OFFSET RT: 7.00
END PROP WOOD
PEDESTRIAN BARRIER
25+39.50
OFFSET LT: 7.00
MATCHLINE- SHEET 7MATCHLINE- SHEET 8PROP RESTING AREA
2% MAX W/BENCH
PROP WAYFINDING
KIOSK
PROP RIGHT OF WAY
END +29.50
PC +28.40
PC +51.00 PC +18.48
PC +54.19
PC +53.30
PC +25.43
PC +15.81
PC +85.01
PC +09.65
PC +65.81
PC +53.96
PT +59.90
PT +86.91
PT +28.34
PT +48.17
PT +23.30
PT +64.82
PT +77.99
PT +99.04
PT +58.73
PT +93.46
PT +09.23
PROPOSED BIKE PATH CONSTRUCTION BASELINE DATA
NUMBER
L8
C4
L9
C5
L10
C6
L11
C7
L12
STARTING
STATION
PT STA 11+59.90
PC STA 12+51.00
PT STA 12+86.91
PC STA 14+18.48
PT STA 14+28.34
PC STA 15+54.19
PT STA 16+48.17
PC STA 16+53.30
PT STA 17+23.30
NORTHING
2937670.571
2937624.230
2937611.845
2937588.993
2937586.804
2937552.847
2937602.589
2937607.718
2937652.040
EASTING
342637.569
342716.001
342749.501
342879.066
342888.680
343009.858
343073.597
343073.455
343117.620
CURVE DATA
R=100.00' Δ 20°34'26"
L=35.91' T=18.15'
R=100.00' Δ 5°39'06"
L=9.86' T=4.94'
R=50.21' Δ 107°14'44"
L=93.98' T=68.16'
R=43.14' Δ 92°58'49"
L=70.00' T=45.44'
LINE DATA
S59°25'25"E
91.10'
S79°59'51"E
131.56'
S74°20'45"E
125.85'
N1°35'29"W
5.13'
S88°36'41"E
2.12'
ENDING
STATION
12+51.00
12+86.91
14+18.48
14+28.34
15+54.19
16+48.17
16+53.30
17+23.30
17+25.43
PROPOSED BIKE PATH CONSTRUCTION BASELINE DATA
NUMBER
C8
L13
C9
L14
C10
L15
C11
L16
C12
STARTING
STATION
PC STA 17+25.43
PT STA 18+64.82
PC STA 19+15.81
PT STA 19+77.99
PC STA 19+85.01
PT STA 20+99.04
PC STA 21+09.65
PT STA 21+58.73
PC STA 21+65.81
NORTHING
2937651.988
2937567.219
2937516.819
2937456.401
2937450.144
2937342.742
2937334.432
2937304.861
2937302.045
EASTING
343119.741
343216.155
343223.907
343214.262
343211.091
343221.971
343228.569
343267.125
343273.625
CURVE DATA
R=100.00' Δ 79°52'03"
L=139.40' T=83.71'
R=100.00' Δ 35°37'35"
L=62.18' T=32.13'
R=100.00' Δ 65°20'04"
L=114.03' T=64.12'
R=100.00' Δ 28°07'18"
L=49.08' T=25.05'
R=54.49' Δ 134°12'48"
L=127.65' T=129.04'
LINE DATA
S8°44'38"E
50.99'
S26°52'57"W
7.01'
S38°27'06"E
10.61'
S66°34'25"E
7.08'
ENDING
STATION
18+64.82
19+15.81
19+77.99
19+85.01
20+99.04
21+09.65
21+58.73
21+65.81
22+93.46
PROPOSED BIKE PATH CONSTRUCTION BASELINE DATA
NUMBER
L17
C13
L18
STARTING
STATION
PT STA 22+93.46
PC STA 23+53.96
PT STA 25+09.23
NORTHING
2937371.384
2937427.949
2937514.979
EASTING
343346.235
343324.762
343412.043
CURVE DATA
R=67.53' Δ 131°44'20"
L=155.27' T=150.75'
LINE DATA
N20°47'13"W
60.50'
S69°02'53"E
120.27'
ENDING
STATION
23+53.96
25+09.23
26+29.50 608143_HD(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-8 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CONSTRUCTION PLANS (2)N
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE BELOW
CONTINUED ONSHEET NO. 70
SCALE: 1" = 40'
40 160100
ROCKY HILL RD 8' SIDEWALK CONSTRUCTION BASELINE DATA
NUMBER
L19
C14
L20
C15
L21
C16
L22
STARTING
STATION
PT STA 0+00.00
PC STA 2+31.30
PT STA 4+09.94
PC STA 4+49.69
PT STA 4+91.49
PC STA 5+28.58
PT STA 5+76.05
NORTHING
2938339.195
2938489.768
2938582.201
2938597.096
2938585.259
2938553.865
2938544.638
EASTING
341562.718
341738.291
341890.247
341927.101
341963.733
341983.488
342025.150
CURVE DATA
R=550.00' Δ 18°36'37"
L=178.65' T=90.12'
R=30.00' Δ 79°49'35"
L=41.80' T=25.10'
R=30.00' Δ 90°39'50"
L=47.47' T=30.35'
LINE DATA
N49°23'00"E
231.30'
N67°59'36"E
39.75'
S32°10'48"E
37.09'
N57°09'22"E
3.91'
ENDING
STATION
2+31.30
4+09.94
4+49.69
4+91.49
5+28.58
5+76.05
5+79.96 608143_HD(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-9 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CONSTRUCTION PLANS (3)
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE BELOW
N
FOR SIDEWALK PROFILE:
SEE SHEET 12
NAVD 88
BASE ELEV
120.00
PROPOSED BIKE PATH
130
140
150
160
170
180
190
200
210
220
230
240
227.550+00 226.52224.841+00 222.43221.442+00 220.94220.443+00 219.94219.444+00 218.94218.445+00 217.94217.436+00 216.89216.027+00 214.82213.578+00 212.32211.079+00 209.81208.3510+00 206.52204.5211+00 202.52200.5212+00 198.52196.5213+000+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00
-2.50%
-5.01%
-4.60%
-1.25%
-4.00%
-1.00%MATCHLINEMATCHLINE24' (L) X 29" (R) X 45" (S) RC HEP
US INVERT EL: 213.50'
DS INVERT EL: 212.90'
26.5' (L) X 2'(W) X 2'(H) BOX CULVERT
US INVERT EL: 207.70'
DS INVERT: 206.20'
UTILITY CROSSING
ROCKY HILL GREENWAY
ALIGNMENT
STATION = 8+54.00
ELEV = 212.15
ROCKY HILL GREENWAY
ALIGNMENT
STATION = 5+85.00
ELEV = 217.60
PROPOSED
GRADE PROFILE
EXISTING
GRADE PROFILE
PVI STA = 0+71.88
PVI ELEV = 226.25
A.D. = -3.76%
K = 6.65
25' VC
PVC: 0+59.38ELEV: 226.41PVT: 0+84.38ELEV: 225.63299.4' SSD
PVI STA = 9+96.66
PVI ELEV = 208.65
A.D. = -1.50%
K = 66.67
100' VC
PVC: 9+46.66ELEV: 209.90PVT: 10+46.66ELEV: 206.65769.4' SSD
PVI STA = 6+75.40
PVI ELEV = 216.68
A.D. = -1.50%
K = 66.71
100' VC
PVC: 6+25.40ELEV: 217.18PVT: 7+25.40ELEV: 215.43769.9' SSD
PVC: 13+35.81PVI STA = 1+59.90
PVI ELEV = 221.84
A.D. = 4.01%
K = 12.47
50' VC
PVC: 1+34.90ELEV: 223.09PVT: 1+84.90ELEV: 221.59GRADE BREAK STA = 0+00.00
ELEV = 227.55
END OF ROCKY HILL ROAD SIDEWALKSTA. 5+79.99 (SEE SHEET 12)START OF ROCKY HILL GREENWAYMULTI-USE TRAILSTA. 0+89.80EXIST. ELEVATIONPROP. ELEVATION608143_HD(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-10 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY PROFILE PLAN (1)
MULTI-USE TRAIL PROFILE
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'CONTINUED ONSHEET NO. 11FOR CONSTRUCTION AND GRADING PLANS:
SEE SHEET NOS. 7 & 1350
SCALE IN FEET
0 100 150 200
100 20 30 40
HORIZONTAL
VERTICAL
120
130
140
150
160
170
180
190
200
210
220
230
240
196.5213+00 194.50192.3114+00 189.87187.3715+00 184.87182.3716+00 179.87177.3717+00 174.95172.8718+00 171.09169.3419+00 167.59165.8420+00 164.08162.3321+00 160.58158.8322+00 157.07155.3223+00 153.57151.8224+00 150.32149.3325+00 148.58147.8226+00 27+0013+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
-3.50%
-1.50%
-5.00%MATCHLINEMATCHLINE82' (L) X 2'(W) X 2'(H) BOX CULVERT
US INVERT EL: 160.50'
DS INVERT EL: 156.50
ROCKY HILL GREENWAY
ALIGNMENT
STA. 18+80.00
ELEV = 170.10'
PROPOSED
GRADE
EXISTING
GRADE
PVI STA = 13+85.81
PVI ELEV = 193.08
A.D. = -1.00%
K = 100.00
100' VC
PVC: 13+35.81ELEV: 195.08PVT: 14+35.81ELEV: 190.581129.2' SSD
PVI STA = 24+49.16
PVI ELEV = 150.09
A.D. = 2.00%
K = 50.00
100' VC
PVC: 23+99.16ELEV: 151.85PVT: 24+99.16ELEV: 149.34PVI STA = 17+68.37
PVI ELEV = 173.95
A.D. = 1.50%
K = 66.88
100' VC
PVC: 17+18.37ELEV: 176.45PVT: 18+18.37ELEV: 172.20GRADE BREAK STA = 26+01.11
ELEV = 147.81
END OF PROPOSED MULTI -USE TRAIL
TO TIE INTO EXISTING GRADE OR
EXISITNG RAIL TRAIL
18' (L) X 2' (W) X 2' (H) BOX CULVERT
US INVERT EL: 189.2
DS INVERT EL: 188.5'
ROCKY HILL GREENWAY
ALIGNMENT
STATION = 13+85.00
ELEV = 193.08
NEW HAVEN AND NORTHAMPTON
CANAL LINE RAIL TRAIL R/W
STA. 25+77.00
EXIST. ELEVATIONPROP. ELEVATION608143_HD(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-11 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY PROFILE PLAN (2)
MULTI-USE TRAIL PROFILE
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'CONTINUED ONSHEET NO. 10FOR CONSTRUCTION AND GRADING PLANS:
SEE SHEET NOS. 8 & 1450
SCALE IN FEET
0 100 150 200
100 20 30 40
HORIZONTAL
VERTICAL
NAVD 88
BASE ELEV
200.00
210
220
230
240
250
260
270
200
210
220
230
240
250
260
270
256.270+00 253.40250.581+00 247.48244.922+00 241.84239.023+00 236.43233.164+00 230.89226.095+00 223.136+000+00 1+00 2+00 3+00 4+00 5+00 6+00
-4.38%
-5.65%
-3.85%
-5.65%
-7.50%
-5.65%
-3.10%-5.65%
-7.50%
-5.64%-7.50%
-5.80%
-1.10%
-5.45%
-5.80%
GRADE BREAK STA = 0+00.00
ELEV = 256.27
GRADE BREAK STA = 5+66.77ELEV = 225.67GRADE BREAK STA = 1+43.00
ELEV = 248.15 GRADE BREAK STA = 3+73.28ELEV = 235.15SIDEWALK THROUGH
DRIVEWAY #1
43.60
SIDEWALK THROUGH
DRIVEWAY #2
28.50
SIDEWALK THROUGH
DRIVEWAY #3
47.54
CENTERLINE OF
CROSSWALK AT
ROCKY HILL ROAD
EXISTING
GRADE
MEET GRADE AT
PROPOSED 16' WIDE
MULTI - USE TRAIL
STA. 0+90
SEE PLANS
EXIST. ELEVATIONPROP. ELEVATION608143_HD(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-12 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL RD SIDEWALK PROFILE
ROCKY HILL ROAD SIDEWALK PROFILE
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'
FOR CONSTRUCTION AN GRADING PLANS:
SEE SHEET NOS. 9 & 15
50
SCALE IN FEET
0 100 150 200
100 20 30 40
HORIZONTAL
VERTICAL
12345678910113 4 5ROCKY HILL RD SIDEWALK ENDSTA 5+79.96N2938546.7589E342028.4343ROCKY HILL GREENWAY BEGINSTA 0+00N2938622.8262E341980.8583CFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFT
CFTCFTCFTCFTCFTROCKY HILL ROAD 60' PUBLIC ROWΔΔ ΔΔΔ225226229210209PROP CULVERT AT STA. 5+8524' X 29" X 45" RC HEPPROP COMPOSTFILTER TUBE (TYP)PROP STONEFOR PIPE ENDSUS INV. = 213.60'DS INV. = 213.10'US INV. = 207.70'DS INV. = 206.20'PROP STONEFOR PIPE ENDSPROP CULVERT AT STA. 8+5429' X 2' X 2' BOX CULVERTNOTIFY GAS COMPANY PRIORTO EXCAVATION IN THIS AREA.THE GAS COMPANY NEEDS TOBE ON SITE WHEN WORK ISOCCURRING IN THIS AREAPROP. LODPROP STONEFOR PIPE ENDSPROP RESTING AREA ANDBICYCLE RACK 2% MAX W/ BENCHPROP HEADWALLPROP JUTE MESH SLOPESTABILIZATION TO EXTEND MAX.8' FROM EDGE OF PATH ON ALLFILL SLOPES 3:1 & GREATER225222223224 226227205210215220203204206207208209211212213214216217218219221215213214216217218219212230235240226227228229231232233234236237238239241242243244
PROP STONEFOR PIPE ENDSMATCHLINE- SHEET 14
MATCHLINE- SHEET 13PROP STONE CHECKDAMS AT 50' TYP.PROPHEADWALL211PROP HEADWALLMATCHLINE- SHEET 13MATCHLINE- SHEET 15
608143_HD(GRADING).DWG 10-May-2016 8:03 AMPlotted on FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATEMAPROJECT FILE NO.-1346NORTHAMPTON, MASSACHUSETTSROCKY HILL GREENWAY MULTI-USE TRAIL608413GRADING PLAN (1)HIGHWAY GUARD DETAILSNONETRAFFIC SIGNAL CONDUITNONEWATER SUPPLY ALTERATIONSNONEDRAINAGE DETAILSSEE BELOWN
CONTINUED ON
SHEET NO. 140SCALE: 1" = 40'40160100REFER TOSHEET NO. 15FOR DETAILS
TP 1
TP 2
1
0
11
12
13 14
15 161718
192021
22
2
324 25
26
ROCKY HILL GREENWAY END
STA 25+99.87
N2937482.5679
E343496.6877MATCHLINE- SHEET 7MATCHLINE- SHEET 8+73.99
OFFSET: 6.79
CFTCFTCFTCFT CFT CFTCFTCFT
CF
T
CF
T
CFTCFTC
F
T
CF
T
CFT
CFT
CFT CFTCFT
CFTCFTNEW HAVEN AND NORTHAMPTONCANAL GREENWAYΔ
1
6
1
PROP CULVERT AT STA. 18+80
82' X 2' X 2' BOX CULVERT
PROP STONE
AT PIPE ENDS
DS INV. = 156.50'
PROP STONE AT
PIPE ENDS
PROP RESTING AREA
2% MAX W/BENCH
PROP STONE CHECK
DAMS AT 50', TYP.
US INV. = 189.2'
DS INV. = 188.50'
PROP STONE
AT PIPE ENDS
PROP STONE CHECK
DAMS AT 50', TYP.
PROP CULVERT AT STA. 13+85
18' X 2' X 2' BOX CULVERT
PROP RESTING AREA
2% MAX W/BENCH
US INV. = 160.50'
PROP RESTING
AREA 2% MAX
W/BENCH
PROP
WAYFINDING
KIOSK148149150
PROP COMPOST
FILTER TUBE (TYP)
PROP RIGHT OF WAY
PROP EXTENT OF
JUTE MESH (TYP)
PROP JUTE MESH SLOPE STABILIZATION
TO EXTEND MAX. 8' FROM EDGE OF PATH
ON ALL FILL SLOPES 3:1 & GREATER
PROP JUTE MESH SLOPE STABILIZATION
TO EXTEND MAX. 8' FROM EDGE OF PATH
ON ALL FILL SLOPES 3:1 & GREATER
P
R
O
P
J
U
T
E
M
E
S
H
S
L
O
P
E
S
T
A
B
I
L
I
Z
A
T
I
O
N
T
O
E
X
T
E
N
D
M
A
X
.
8'
F
R
O
M
E
D
G
E
O
F
P
A
T
H
O
N
A
L
L
FI
L
L
S
L
O
P
E
S
3
:
1
&
G
R
E
A
T
E
R
150
1551601651701751801851901952002051
4
8
1
4
9
151
152
153154156157
158
15
9161162163164166
1671681691711721731741
7
6
17
7
178
179
181
182
18
3
1
8
418618718818919119219319419619719819920120220320420620720820921
5
21
3
21
4
21
6
21
7
21
8
21
9212 MATCHLINE- SHEET 14MATCHLINE- SHEET 13P
R
O
P
S
T
O
N
E
C
H
E
C
K
D
A
M
S
A
T
5
0
'
T
Y
P
.608143_HD(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-14 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
GRADING PLAN (2)
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE BELOW
N
CONTINUED ONSHEET NO. 130
SCALE: 1" = 40'
40 160100
1 12345MATCHLINE- SHEET 91
MATCHLINE- SHEET 7CFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTROCKY HILL ROAD 60' PUBLIC ROWΔΔΔΔ2
2
5 DRIVEWAYSIDEWALKCROSSING #1DRIVEWAYSIDEWALKCROSSING #2DRIVEWAY SIDEWALKCROSSING #3226
229PROP LODPROP BIORETENTION AREA ASTA. 0+83 16'LTAREA = 156 SFBOT ELEV. = 224.50'OVERFLOW NOTCH: 224.75'2' WIDE NOTCH IN PROPOSEDBLOCK RETAINING WALLINV 6" PERF PVC PIPE = 222.41'SEE SHEET 22 FOR DETAIL6" PERF PVC PIPEINV OUT = 223.2'6" PERF PVC PIPELENGTH = 19 LFS = 1.0%6" PERF PVC PIPELENGTH = 20 SFSLOPE = 1.0%PROP BIORETENTIONINFLOWDRIVEWAY SIDEWALKCROSSING #4PROP STONEFOR PIPE ENDSPROP BIORETENTION AREA BSTA. 0+69 15'RTAREA = 60 SFBOT ELEV. = 225.50'OVERFLOW STRUCTURE RIM = 225.75'INV 6" PERF PVC PIPE = 223.40'SEE SHEET 22 FOR DETAIL6" PERF PVC PIPEINV OUT = 222.21'2252
2
2 2232242
2
6
227
230
235240245250
226
2
2
7 228229231
232
233
234
236
237
238239241242243244246247248249251252253254
X226.6X226.9X225.8X225.1MATCHLINE- SHEET13MATCHLINE- SHEET15EOP PARKING CONSTRUCTION BASELINE DATANUMBERC47C41C42C43C44C45C46STARTINGSTATION-0+32.080+36.760+57.820+76.061+05.431+72.181+93.24NORTHING2938544.4982938587.1102938600.5352938608.3752938594.4132938563.3382938548.705EASTING342014.672341967.294341951.507341964.383341986.987342003.461342016.473CURVE DATAR=26.00' Δ70°41'41"L=32.08' T=18.44'R=33.76' Δ35°45'01"L=21.06' T=10.89'R=2.00' Δ139°32'21"L=4.87' T=5.43'R=15.01' Δ76°11'39"L=19.96' T=11.77'R=3.00' Δ89°58'02"L=4.71' T=3.00'R=3.00' Δ90°01'04"L=4.71' T=3.00'R=2.64' Δ120°01'42"L=5.53' T=4.58'Curve Table: AlignmentsCurve #C1C2C3C4C5C21C22C23C24C41C42C43C44C45C46C47Radius5.00'3.00'3.00'5.00'5.00'546.00'26.00'34.73'20.00'33.76'2.00'15.01'3.00'3.00'2.64'26.00'Length9.501'4.712'4.712'3.544'3.131'177.973'36.194'38.698'23.388'21.064'4.871'19.958'4.711'4.713'5.535'32.080'Tangent6.993.003.001.851.6289.7821.7221.6413.2410.895.4311.773.003.004.5818.44Delta108°52'43.25"90°00'00.00"90°00'00.00"40°36'59.35"35°52'47.19"18°40'33.57"79°45'38.44"63°50'41.50"67°00'05.78"35°45'01.39"139°32'20.70"76°11'39.04"89°58'02.05"90°01'04.30"120°01'41.69"70°41'40.61"1
5
2
2
5
226
229
2252
2
6
227
230
226
2
2
7 228229231232
C1C2C4C5C22C23C24C41C42C43C44C45C47+15.70OFFSET: 17.37+37.38OFFSET: 10.75+74.38OFFSET: 13.75+92.48OFFSET: 12.09+99.26OFFSET: 8.94+48.72OFFSET: 4.00+27.61OFFSET: 4.00+61.33OFFSET: 4.91+73.21OFFSET: 3.85+66.80OFFSET: 4.01+89.96OFFSET: 4.00+03.21OFFSET: 21.68+27.20OFFSET: 10.75+62.24OFFSET: 13.75+82.72OFFSET: 10.12C3PIPIPCPCPCPCPTPTPTPTPTPIPIPCPCPCPCPCPTPTPT
PTPT PRCPCPTPRCL530
1
C46608143_HD(GRADING).DWG 10-May-2016 8:03 AMPlotted on FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATEMAPROJECT FILE NO.-1546NORTHAMPTON, MASSACHUSETTSROCKY HILL GREENWAY MULTI-USE TRAIL608413GRADING PLAN (3)HIGHWAY GUARD DETAILSNONETRAFFIC SIGNAL CONDUITNONEWATER SUPPLY ALTERATIONSNONEDRAINAGE DETAILSSEE BELOWN20SCALE: 1" = 20'050100PARKING LOT CURB TIE PLANSCALE: 1" = 10'
MATCHLINEMATCHLINE1
2 3 4 5 6 7 8 9 10
11
12
12345
1
PATHNARROWS
NOMOTORVEHICLES
ROCKY HILL
GREENWAYTRAIL
ROCKY HILLGREENWAYTRAIL
WARNING SIGN (W7-5)
STA 7+85.83 7.50' RT
WOODEN POST
"PATH NARROWS" SIGN (W5-4a)
"NO MOTOR VEHICLES" SIGN (R5-3).
STA 7+32.90 11.00' RT
WOODEN POST
"HANDICAP PARKING" SIGN
(R7-8 & R7-8p)
STA 0+62.00 30.00' LT
"ROCKY HILL
GREENWAY TRAIL"
(D11-1d & M5-1R)
STA 3+21.60 LT 4.7'
"ROCKY HILL
GREENWAY TRAIL"
SIGN
(D11-1d & M5-1L)
PROTECT SWL MARKINGS
DURING CONSTRUCTION
ROCKY HILL RD SIGN MA-D-3
STA 0+20.00 15.50' LT
R&R STOP SIGN.
NEW LOCATION TO BE JUST
PRIOR TO CROSSWALK
"NO PARKING ANY TIME" SIGN
(R7-1)
STA 0+71.61 13.2' RT
WARNING SIGN (W8-6)
STA 7+85.83 7.50' LT
WOODEN POST
R&D EXISTING
W11-2 SIGN
"STOP" SIGN (R1-1) AND
"AUTHORIZED VEHICLES ONLY"
SIGN (R5-11) AT PROPOSED GATE
STA 1+2.31 13.2' RT
STA 1+2.31 13.2' LT
16.00'
8.00'
10.00'
PROP 10' WIDE CROSSWALK
APPLY 10' THERMAL MARKINGSROCKY HILL ROADICE POND
DRIVE
4" SWL PARKING STALL LINES
8' X 18' PARKING SPACES
CURVE RIGHT
WARNING SIGN (W1-2R)
STA 4+46.47 4.7' RT
CURVE RIGHT
WARNING SIGN
(W1-2L)
STA 1+12.08 8.6' RT
WOODEN POST
"TRAIL ENDS"
(W11-15b)
STA 0+23.44 LT 4.7'
TRAIL
ENDS
PROP STOP BAR
PROPOSED RECTANGULAR RAPID-FLASHING
BEACONS (RRFBs)
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
46
STATE
MA
PROJECT FILE NO.
-
SIGNS AND MARKINGS PLAN (1)
608413
16
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
608143_HD(TRAFFIC_SIGNAGE).DWG10-Mar-2015 3:39 PMPlotted on0
SCALE: 1" = 40'
40 160100 NCONTINUED ONSHEET NO. 17
MATCHLINENEW HAVEN AND NORTHAMPTONCANAL GREENWAYMATCHLINETP 1
TP 2
10
11
12
13 14
15 161718
192021
22
2
324 25
26
MATCHLINE- SHEET 7MATCHLINE- SHEET 8B
V
W
DISTURBANCEAREA 63 SFBVW
DISTURBANCE
AREA 1353 SF
BVW
DISTURBANCE
AREA 325 SF
ROCKY HILL
GREENWAYTRAIL
CANAL LINERAIL TRAIL
WARNING SIGNS (W1-5)
STA 15+18.16 8.00' RT
WOODEN POST
WARNING SIGNS (W1-5)
STA 25.31.30 8.00 LT
WOODEN POST
"ROCKY HILL GREENWAY TRAIL" SIGN
(D11-1d & M6-1)
STA 25+88.16 44.00 LT & STA 26+22.55 22.5 RT
WOODEN POST
"CANAL LINE RAIL TRAIL" SIGN
(D11-1e & M6-4)
STA 25+75.00 6.75 RT
WOODEN POST
1
0
.
0
0
'
1
0
.
0
0
'
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
46
STATE
MA
PROJECT FILE NO.
-
SIGNS AND MARKINGS PLAN (2)
608413
17
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
608143_HD(TRAFFIC_SIGNAGE).DWG10-Mar-2015 3:39 PMPlotted onN
CONTINUED ONSHEET NO. 160
SCALE: 1" = 40'
40 160100
608143_HD(DETAILS).DWG10-Jun-2022 12:06 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-18 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TRAFFIC SIGNAGE DETAILS
AND
POST SIZE
REQUIRED
NUMBER
OF
NUMBER
REQUIRED
SIGNSTEXT
HEIGHT
IDENTIFI-
NUMBER
CATION
WIDTH
SIZE OF SIGN
NOTES:
1. SIGN SIZE, LETTERING, TEXT, AND COLORS PER MUTCD STANDARDS. ALL ROADWAY TRAFFIC SIGNS ARE HIGH INTENSITY GRADE REFLECTIVE YELLOW-GREEN WHEN AVAILABLE.
2. ALL WARNING, REGULATORY AND ROUTE MARKERS ARE FABRICATED WITH HIGH INTENSITY ENCAPSULATED LENS REFLECTIVE SHEETING (SEE SECTION M9.30.0) TYPE III OR IV.
3. ALL P5 POSTS ARE TELESCOPIC BREAKAWAY SQUARE TUBE POSTS PAINTED BLACK UNLESS OTHERWISE REQUIRED. POSTS LOCATED IN PAVEMENT SHALL BE SET IN A BOLLARD PER THE DETAILS.
4. QUANTITIES OF SIGNS AND POSTS SHOWN ON THIS SHEET MAY DIFFER FROM THE SITE PLAN. WHERE DIFFERENCES OCCUR, THE PAVEMENT MARKINGS AND SIGNAGE PLANS WILL PREVAIL.
5. SIGNS LISTED WITHOUT POSTS ARE EITHER SECURED TO A PROPOSED OR EXISTING FEATURE OR MOUNTED ON A POST WITH ANOTHER SIGN LISTED.
PATH
NARROWS18" 18"1W5-4a
NOT TO SCALE
BORDERBACK-
GROUNDHEIGHT
LETTER
TEXT DIMENSIONS (INCHES)
SPACING
VERTICAL
COLOR
LEGEND
R7-1 12"18"1 P5
(1 REQ'D)
W8-6 24"24"1
R1-1 18"18"2 P5
(2 REQ'D)
AND
POST SIZE
REQUIRED
NUMBER
OF
NUMBER
REQUIRED
SIGNSTEXT
HEIGHT
IDENTIFI-
NUMBER
CATION
WIDTH
SIZE OF SIGN
18"18"
18"24"
2W1-5
W7-5
D11-1d
18"18"
4
12"18"1
1
ROCKY HILL
GREENWAY
TRAIL
P5
(2 REQ'D)
WOODEN POST
(2 REQ'D)
NO
MOTOR
VEHICLES
R5-3 24"24"1
P5
(1 REQ'D)
18"9"1
R7-8
R7-8p
CANAL LINE
RAIL TRAIL18"24"D11-1e 1 WOODEN POST
(1 REQ'D)
12"9"1
0 REQ'D
M6-4
12"9"
2
M6-1
BORDERBACK-
GROUNDHEIGHT
LETTER
TEXT DIMENSIONS (INCHES)
SPACING
VERTICAL
COLOR
LEGEND
R5-11 30"24"2
WOODEN POST
(1 REQ'D)
WOODEN POST
(1 REQ'D)
WOODEN POST
(2 REQ'D)
WOODEN POST
(1 REQ'D)
0 REQ'D
0 REQ'D
0 REQ'D
M5-1R 21"15"1
M5-1L 21"15"1 0 REQ'D
0 REQ'D
0 REQ'D
N/A N/A GREEN WHITE WHITE
N/A N/A GREEN WHITE WHITE
N/A N/A
N/A N/A YELLOW BLACK BLACK
YELLOW BLACK BLACK
2" C 1" GREEN WHITE WHITE
2.25"/2" D 1"GREEN WHITE WHITE
4" C/B 2.5"WHITE BLACK BLACK
3" C 1.625"YELLOW BLACK BLACK
N/A WHITE BLACK BLACKN/A
N/A WHITE BLACK BLACKN/A
0.875",
0.625"WHITE RED RED
3" C/B,
2" C
4" C 2.5"YELLOW BLACK BLACK
6" C N/A RED WHITE WHITE
4" C/D 2.5"WHITE BLACK BLACK
8"29"D-3 1 P5
(1 REQ'D)4"/3" C N/A GREEN WHITE WHITE
ROCKY HILL
GREENWAY
TRAIL
3"5"
24"
24"
3"
2"
2"
2"
2"
0.625"0.375"
3" C
SEE DETAIL 2" GREEN WHITE WHITE
SIGN DETAILS
NOT TO SCALE
3"5"
24"
24"
3"
5"
2"
4"
0.625"0.375"
CANAL LINE
RAIL TRAIL 2"
3" C
SEE DETAIL 2" GREEN WHITE WHITE
W1-2R 24"24"1 P5
(1 REQ'D)N/A N/A YELLOW BLACK BLACK
W1-2L 24"24"1 WOODEN POST
(1 REQ'D)N/A N/A YELLOW BLACK BLACK
W11-15b 24"24"1 P5
(1 REQ'D)YELLOW BLACK BLACK
4" C 2.5"
608143_HD(DETAILS).DWG10-Jun-2022 12:06 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-19 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TRAFFIC MANAGEMENT (1)
P/F
NUMBER OF LANES NUMBER
OF
STUDIES
AVERAGE CAPACITY
MEASURED AVERAGE WORK ZONE CAPACITIES
LEGEND:
NOTES:
ROAD TYPE DISTANCE BETWEEN SIGNS **
BA C
SUGGESTED WORK ZONE WARNING SIGN SPACING
STOPPING SIGHT DISTANCE AS A FUNCTION OF SPEED
SPEED*
(mph)
DISTANCE
(ft)
FORMULAS FOR DETERMINING TAPER LENGTHS
TYPE OF TAPER TAPER LENGTH (L)*
TAPER LENGTH CRITERIA FOR TEMPORARY TRAFFIC CONTROL ZONES
SPEED LIMIT (S)TAPER LENGTH (L)
FEET
608143_HD(DETAILS).DWG10-Jun-2022 12:06 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-20 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TRAFFIC MANAGEMENT (2)
panelStyle:construction_guide.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
panelStyle:regulatory.ssmpanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:0panelHeightLock:0marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
LEGEND
DIRECTION OF TRAVEL
DOWNSTREAM TAPER: GUIDES
TRAFFIC BACK TO ITS
ORIGINAL TRAVEL PATH
TERMINATION AREA:
LETS TRAFFIC
RESUME NORMAL
OPERATIONS
ACTIVITY AREA:
WHERE WORK
TAKES PLACE
TRANSITION AREA:
MOVES TRAFFIC
OUT OF ITS
NORMAL PATH
ADVANCE WARNING
AREA: TELLS
TRAFFIC WHAT TO
EXPECT AHEAD
LONGITUDINAL
BUFFER SPACE
LONGITUDINAL BUFFER SPACE:
PROVIDES PROTECTION FOR TRAFFIC
AND WORKERS = STOPPING SIGHT
DISTANCE. NOTHING SHALL BE
PLACED/STORED IN BUFFER SPACE
SHOULDER TAPER: GUIDES
TRAFFIC AWAY FROM
SHOULDER/ BREAK-DOWN LANE
LATERAL BUFFER SPACE:
PROVIDES PROTECTION FOR
TRAFFIC AND WORKERS
TRAFFIC SPACE: ALLOWS
TRAFFIC TO PASS THROUGH
THE ACTIVITY AREA
WORK SPACE: SET ASIDE FOR
WORKERS, EQUIPMENT, AND
MATERIAL STORAGE
USE "G20-1" SIGN
AT PROJECT LIMIT
IF WORK OCCURS
OVER A DISTANCE
OF MORE THAN 2
MILESW20-1
MA-R2-10a
MA-R2-10e
G20-1
B
OR
C
ROADWORKAHEAD
ROAD WORK
NEXT XX MILES
panelStyle:construction_guide.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
END ROADWORKDOUBLEFINES END
WORK ZONES
SPEEDINGFINESDOUBLED
A
THE "A" DISTANCE CAN BE
MEASURED FROM THE START OF
THE TRAVEL LANE RESTRICTION
OR THE SHOULDER/BREAKDOWN
LANE RESTRICTION (IF
SHOULDER/BREAKDOWN LANE IS
ONLY LANE BEING CLOSED)
CHANNELIZING DEVICE
WORK AREA
SIGN
COMPONENT PARTS OF A TEMPORARY
TRAFFIC CONTROL (TTC) ZONE
12*1
14
24" (MIN.)
REFLECTORIZED
DRUM
NOT TO SCALE
LIMIT OF EXCAVATION
TEMPORARY BIT.
CONC. PAVEMENT
GRAVEL BORROW/SUBBASE
EXIST.
PAVEMENT
LONGITUDINAL DROP-OFF DETAIL
TRAVEL WAY
WORK AREA
DIRECTION OF TRAFFIC
W8-1
* - INCREASE SLOPE RATIO
FOR HIGHER SPEEDS
NOT TO SCALE
Depth≥4"
LATERAL DROP-OFF DETAIL
LATERAL AND LONGITUDINAL
DROP-OFF DETAILS
B
W5-1W21-5a
RIGHTSHOULDERCLOSED
ROAD
NARROWS
AWORK ZONE 100 FT
BUFFER L/3100 FT
TWO LANE ROAD
SHOULDER CLOSED
WORK
ZONE
100FT
MAX.
100FT
MAX.
BUFFER
100-150FT
W20-4
W13-1p
ONE LANEROADAHEAD
XXM.P.H.
W20-4
W13-1p
ONE LANEROADAHEAD
XX
P/F
W20-7
W20-7
P/F
A B
AB
M.P.H.
TWO LANE ROAD ONE LANE
ALTERNATING TRAFFIC
AND
POST SIZE
REQUIRED
NUMBER
OF
NUMBER
REQUIRED
SIGNSTEXT
HEIGHT
IDENTIFI-
NUMBER
CATION
WIDTH
SIZE OF SIGN
48"36"
W21-5aR
W13-1p
R2-10e 2 P5
(2 REQ'D)
W5-1
W8-1
R2-10a
W20-7
W20-4
BORDERBACK-
GROUNDHEIGHT
LETTER
TEXT DIMENSIONS (INCHES)
SPACING
VERTICAL
COLOR
LEGEND
W20-1
5" C 4"ORANGE
/WHITE BLACK BLACK
panelStyle:regulatory.ssmpanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:0panelHeightLock:0marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
ROADWORKAHEAD
panelStyle:construction_guide.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
END ROADWORKDOUBLEFINES END
WORK ZONES
SPEEDINGFINESDOUBLED
ONE LANEROADAHEAD
XXM.P.H.
36"48"2 P5
(2 REQ'D)
4"/6" D 2.5"/3"
24"24"4 P5
(2 REQ'D)
4" D 2" ORANGE BLACK BLACK
36"36"2 P5
(2 REQ'D)
N/A
30"30"2 P5
(2 REQ'D)
1.875"
18"18"2 P5
(0 REQ'D)
2"
30"30"1 P5
(1 REQ'D)
2.75"
30"30"3 P5
(1 REQ'D)
3"
24"24"2 P5
(2 REQ'D)
N/A
ORANGE
/WHITE BLACK BLACK
N/A ORANGE BLACK BLACK
4" C ORANGE BLACK BLACK
4" D ORANGE BLACK BLACK
5" D ORANGE BLACK BLACK
6" D ORANGE BLACK BLACK
8"/3" E ORANGE BLACK BLACK
BUMP
ROAD
NARROWS
ROAD
NARROWS
W5-1
L/2
A
B
L/2
A
B
W5-1
RAIL TRAIL INTERSECTION
CLOSURECANAL LINE RAIL TRAILW20-1
ROADWORKAHEAD
W20-1
ROADWORKAHEAD
LANE
REDUCED
TO 7' WIDTH
10' WIDTH
ROCKY HILL
GREENWAY
NOTE:
1. CLOSE ONE LANE DURING THE DAILY WORK SHIFT OF CONSTRUCTION
OF MULTI-USE TRAIL FOR TEMPORARY PEDESTRIAN ROUTE .
RIGHTSHOULDERCLOSED
ROAD
NARROWS
BUMP
608143_HD(DETAILS).DWG10-Jun-2022 12:06 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-21 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
DETAILS (1)
CONCRETE SLAB
PATH EDGE
BENCH DETAIL
NOT TO SCALE
NOTES:
1. ALL STEEL HARDWARE TO BE COATED W/ ZINC RICH EPOXY THEN FINISHED WITH BLACK POLYESTER
POWDER COATING.
2. HARDWARE TO BE STAINLESS STEEL (S.S.) TYPE 316.
3. CONTRACTOR TO PROVIDE COLOR CHART FOR BENCH SLATS TO OWNER.
FRONT VIEW
BENCH BASE DETAIL
NOT TO SCALE
6'-0"16-11/16"
11-12"
17-18"
3"
12"
SIDE VIEW
3" SQ. X 1/4" W.
STEEL TUBING
3" X 4" (NOMINAL)
STEEL SLATS
(COLOR BY OWNER)
3/8" X 4-1/2"
STEEL BAR
BENCH BASE
(SEE DETAIL)
S.S ANCHORS
TO SUIT
4"
S.S ANCHORS TO SUIT
(2" MIN. EMBEDMENT)
1/2" X 3" STEEL
SURFACE PLATE
3/8" X 2" S.S. BTN. SKT.
HD. LAG W/ WASHER
NOTES:
1. HARDWARE TO BE STAINLESS STEEL (S.S.) TYPE 316.
18'-0"
2'-6"
5'-0"±
1'-0"
45°BENCH
(SEE DETAIL)
CHAMFERED
EDGE ON
ALL SIDES
CONCRETE SLAB
(SEE DETAIL)
ARM REST
EXTEND SLAB 6' OUTSIDE BENCH
FOR HANDICAP ACCOMMODATIONS
AND COMPANION SEATING
EXTEND SLAB 6' OUTSIDE BENCH
FOR HANDICAP ACCOMMODATIONS
AND COMPANION SEATING
8' VAN8' MIN
3'
ACCESSIBLE PARKING SPACE DETAIL
NOT TO SCALE
NOTE:
1. HANDICAPPED ACCESS
AISLE WIDTH FOR NON
VAN (CAR) ACCESSIBLE
SPACES TO BE 5
FEET-SEE PLANS.
2. ALL PARKING LOT
STRIPING TO BE 4"
SOLID WHITE PAINTED
LINES.
3. ALL PAINT TO BE
NON-SKID.
4. VAN SPACES TO BE
PAINT MARKED WITH
"VAN".
2% SLOPE
MAX IN ALL
DIRECTIONS
HANDICAP PARKING SIGN
AND VAN ACCESSIBLE SIGN
4' HANDICAP GRAPHIC
SYMBOL PAINTED
WHITE ON PAINTED
BLUE BACKGROUND 4" WIDE
PAINTED
LINES (TYP.)
STEEL POST
HANDICAPPED RESERVED PARKING SIGN
PARKING
At Owner's Expense
May Be Removed
Unauthorized Vehicles
REQUIREDSPECIAL PLATE
HANDICAPPED
NOTE:
1. SIGN LAYOUT, COLORS, SYMBOL AND LETTERING SHALL BE STANDARD.
2. TO BE LOCATED ON SITE AS DIRECTED.
3. METAL POST TO BE PAINTED 2 COATS OF EXTERIOR GREEN ENAMEL (SEE SPECS.).
4. TO BE LOCATED AT APPROPRIATE SPACES.
5. STEEL PIPE TO BE USED WHERE SIGN IS INSTALLED ON PAVED AREA.
ELEVATION
12" x 18"
"VAN ACCESSIBLE"
SIGN AS REQUIRED
METAL POST
2" x 2" x 0.188"
CROWN
PAVING
6" DIA. STEEL PIPE
SEE NOTE BELOW
CONCRETE
6'-0" MIN.
3'-0"
3'-0"
6"
12" DIA.
RESERVED PARKING SIGN DETAIL
NOT TO SCALE
NOTES:
1.SIGN HEIGHT - 7' FROM BOTTOM OF SIGN TO STREET OR SIDEWALK. 6' FROM BOTTOM OF LOWER SIGN FOR MULTIPLE SIGNS
ON ONE POST. EXCEPTIONS ONLY AS SPECIFICALLY STATED ON PLANS OR APPROVED BY THE ENGINEER.
2. METAL STOP AND YIELD SIGN POSTS SHALL HAVE ALTERNATING 1' BANDS OF RED AND WHITE 3M DIAMOND GRADE SHEETING.
ALL OTHER POSTS SHALL BE UNSHEETED.
3. FOR IN-SIDEWALK INSTALLATIONS, CORE 4" DIAM. HOLE. ANCHOR LENGTH MAY BE DECREASED TO 12".
4. METAL POSTS SHALL BE TELESPAR QUICK PUNCH POST OR EQUAL.
5. POST SHALL BE ROLLED CARBON SHEET STEEL, ASTM A570 GRADE 50 AND BE HOT DIPPED GALVANIZED AASHTO M-120 YIELD
STRENGTH 60,000 PSI MIN. POST SHALL HAVE 7/16" DIE-PUNCHED KNOCKOUTS ON 1" CENTERS FULL LENGTH, FOUR SIDES.
6. ANCHOR SHALL HAVE 4 7/16" HOLES ONE EACH SIDE 2" FROM TOP END. FINISH SHALL BE ZINC HOT DIPPED GALVANIZED
MATERIAL TO MEET ASTM A500 GRADE B.
7. DRIVE RIVETS TO BE TL3806 3/8" DIA. OR EQUAL.
8. CORNER BOLTS TO BE TLCB516M OR EQUAL.
9. SIGN POSTS WITHIN PARKING AREAS (PAVEMENT) SHALL BE A BOLLARD TYPE WITH A 6 INCH DIAMETER DUCTILE IRON PIPE
FILLED WITH CONCRETE EXTENDING A MIN. 4' FROM GROUND SURFACE.
10. CEMENT CONCRETE: 4,000 PSI, 3/4-INCH, 610 (M4.02.00).
11. SIGNS LOCATED ALONG DESIGNATED MULTI USE TRAIL SHALL USE WOODEN POST OPTION FOR INSTALLATION.
12. SIGNS TO BE LOCATED 3' OFFSET FROM EOP OF SIDEWALK AND TRAIL
ATTACH SIGN WITH
2 DRIVE RIVETS.
SEE NOTE 7.
SIGN POST
SQUARE 2"x 2",
14 GAGE.
QUICK PUNCH
CORNER BOLT
SEE NOTE 8.
8"
2"
ANCHOR SQUARE
2.5" X 2.5" OD,
7 GAUGE, 24"
LENGTH SEE NOTE 6.
22"
2"
SIGN INSTALLATION DETAIL
NOT TO SCALE
TO SUIT
HEIGHT
TO SUIT
BOLLARD
WITHIN
PARKING (SEE
NOTES)
2 CUBIC FT. CONCRETE
(M4.02.00)
ATTACH SIGN WITH
5/16" X 5" LAG BOLTS WITH
5/16" SECURITY NUT
SIGN POST
4"x 4" WHITE OAK POST
22"
2"
TO SUIT
HEIGHT
TO SUIT
3/4" CRUSHED
STONE SUBBASE
(M2.01.4)
4"
WOODEN POST
BICYCLE REPAIR STATION DETAIL
NOT TO SCALE
20"
90"
12.75"
45"
12"
45"
59"
BICYCLE
SUPPORT
STAINLESS
STEAL TOOL
TETHERS MANUAL AIR
PUMP
NOTES:
1. INSTALL REPAIR STATION ACCORDING
TO MANUFACTURER'S SPECIFICATIONS.
PLAN
SECTION 4" THICK
CONCRETE SLAB
(SEE DETAIL)
1'
2'
2'
R 10.20 IN.
NON-ABRASIVE
SURFAC A .125"
P.V.C. JACKET IS
APPLIED TO
PRIMED PIPE.
JACKET
COATING TO
EXTEND 1" MIN.
BELOW GRADE CONCRETE FOOTING
1'7.5'
6'
4'
1.5'
2'
4" THICK
CONCRETE
SLAB
SEE DETAIL
CEMENT
FOOTING
NOTES:
1. MAINTAIN A 6' OBSTRUCTION-FREE AISLE AROUND AT LEAST THREE SIDES OF EACH BIKE RACK.
2. SCHEMATIC ADAPTED FROM DETAIL PROVIDED BY CYCLE-SAFE.
U2 RACK BY
CYCLE-SAFE OR
APPR. EQUIV.
3'
BICYCLE RACK DETAIL
NOT TO SCALE
METAL POST
ALL POSTS TO BE METAL
UNLESS OTHERWISE STATED
PAINTED CROSSWALK STRIPING DETAIL
NOT TO SCALE
10' WIDTH
LENGTH VARIES ON
SIZE OF ROAD/CROSSING
NOTE:
1. ALL PAINT SHALL BE NON-SKID.
2. PAINT LINES SHALL BE WHITE.
PAINTED STRIPES 12"
MIN. WIDTH OF STRIPE24"
4' MIN.
WIDTH TO SUIT STOP
SIGN
PAINTED WHITE STOP LINE (12" WIDE)
WHERE SHOWN ON PLAN
4-1
/
2
"6'-0" MINIM
U
M
9"6"2-1"Ø HOL
E
S
2-#3 REBARS
CONCRETE CURB STOP DETAIL
NOT TO SCALE
L PARKING STALLC
SECTION
2"
9"
14"6"2"
3"5"
INSTALLATION PLAN
1'-6" TO EDGE
OF PARKING STALL
SEAL 1/2" DEEP HOLE W/ MORTAR
WHEEL STOP
PAINTED STRIPES AS SHOWN IN THE SITE PLAN
EDGE OF PAVEMENT
#6 @ 2'-6" LONG
RECTANGULAR RAPID FLASHING BEACON DETAIL
NOT TO SCALE
FOOTING
6. CEMENT CONCRETE: 4,000 PSI, 3/4-INCH, 610 (M4.02.00).
CONCRETE SLAB DETAIL
NOT TO SCALE
NOTES:
1. PROVIDE EXPANSION JOINTS AT MIN. 30 FT. O.C. WITH PRE-
FORMED JOINT FILLER (M9.14.0).
2. PROVIDE TOOLED CONTROL JOINTS AT 5' O.C. TYP. - 6' MAX.
3. PROVIDE BROOM FINISH IN DIRECTION PERPENDICULAR TO PATH.
4. IF APPLICABLE, MATCH ALL EXISTING SIDEWALK WIDTHS.
5. SUBBASE: COMPACTED TO 95%.
AS SPECIFIED ON PLANS
EXPANSION JOINT
DETAIL
1.0% TYP. - 2.0% MAX.
SUBBASE: 8" GRAVEL BORROW
(M1.03.0 TYPE b)
CONCRETE
SIDEWALK
1/2" PREFORMED
EXPANSION JOINT
CURB/BLDG. FACE, FIXED
OBJECT, OR CONC.
SIDEWALK SECTION
EXPANSION
JOINT SEALANT
W.W. MESH (6x6w1.4xw1.4) FLAT
SHEETS
4" CEMENT CONCRETE
(M4.02.00)
12"
1"
(M4.02.00)
GROUND
SURFACE
GROUND
SURFACE
3' FROM
EDGE OF
PAVEMENT
(TYP.)
3' FROM
EDGE OF
PAVEMENT
(TYP.)
PAVEMENT
PAVEMENT
608143_HD(DETAILS).DWG10-Jun-2022 12:07 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-22 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
DETAILS (2)
FLOW
CONCRETE MASONRY PIPE ENDS
MODIFIED MASSDOT DETAIL E206.4.0
NOT TO SCALE
12"
6' - 5"
1" CLEAR
PIPE RISE
2'-5"
18"
STONE FOR PIPE ENDS
(M2.02.3) AT FACE OF
HEADWALL
(DOWNSTREAM END ONLY)
(2) #3 BARS @ 12"O.C.
EACH WAY
(3) #3 BARS
12"
2' - 0"
3"
NOTES:
1. FOR DESCRIPTIONS, MATERIALS AND CONSTRUCTION METHODS, SEE LATEST STANDARD SPECIFICATIONS.
2. ALL CONCRETE DIMENSIONS SHOWN ARE MINIMUM.
3. PAYMENTS WIL BE BASED ON THE ACCOMPANYING TABLES.
4. FOR QUANTITY TABLES SEE E206.4.1 IN THE MASSDOT CONSTRUCTION STANDARD DETAILS.
29" x 45" RCHEP
2:1
S
L
O
P
E
3"
6' - 5"
15' - 6"
6"
11" EMBEDMENT DEPTH
NATIVE COMMON FILL
OR ORDINARY
BORROW (M1.01.0)
2"
CLEARCEMENT CONCRETE 4000
PSI (SEE MASSDOT
SPECIFICATIONS FOR
DESIGN REQUIREMENTS)
ONLY TO BE USED WHERE
SPECIFIED.
SEE
CULVERT
DETAILS
CULVERT
(TYP.)
A
WIDTH VARIES
10' - 0"
12' - 0"
CULVERT TO STONE TRANSITION DETAIL
NOT TO SCALE
SECTION A-A
PLAN VIEW
MODIFIED ROCKFILL (M.2.02.4)
ON SIDE SLOPE
D5 = 2.5"
D25 = 4"
D100 = 8"
DEPTH = 12"
CHANNEL
WIDTH
2' - 0"
LENGTH
8' - 0"
NATIVE OR ORDINARY
BORROW (M1.01.0) SUBGRADE
NOTES:
1. STONE TO EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE CULVERT AT THE
DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN 2/3 THE CULVERT HEIGHT.
2. THE AREA TO BE STONED TO BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME
GRADE (FLUSH) WITH THE RECEIVING CHANNEL.
3. THE WIDTH OF THE END OF THE APRON TO BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL
(MAX. TAPER 5:1).
4. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER.
5. ANY DISTURBED AREA FROM END OF APRON TO RECEIVING CHANNEL MUST BE STABILIZED.
6. ANY UNSUITABLE ORGANIC MATERIAL FOUND BELOW THE SUB-BASE OF THE CULVERT SHALL BE REMOVED &
REPLACED W/ COMPACTED PROCESSED GRAVEL SUBBASE (M1.03.1) AS REQUIRED AT AN ADDITIONAL
EXPENSE.
CULVERT
END SECTION OR HEADWALL
6" MIN. OF 3/4" CRUSHED
STONE BASE (M2.01.4)
STONE FOR PIPE ENDS
M2.02.3 2' MIN
LENGTH
2' - 0" MIN.
1" DIA. INSERTS FOR INSTALLATION/
ERECTION HARDWARE
2'-0"
OPENING
2'-0" OPENING
ROOF, FLOOR AND
WALL THICKNESSES
AS REQ'D (6" MIN.)
4" X 4"
CHAMFERS
A
A
SECTION A-A
2"
1" X 1" CLOSED CELL
RUBBER GASKET
2" DIA. LIFTING HOLES
TYPICAL BOX CULVERT DETAIL
NOT TO SCALE
8'-0"
MAX.GENERAL NOTES:
1. CONCRETE: 5,000 P.S.I MINIMUM
STRENGTH @ 28 DAYS.
2. STEEL REINFORCING- ASTM A-615,
GRADE 60.
3. COVER TO STEEL-1" MINIMUM.
4. ASTM C858 AND ACI 318 WITH AASHTO
HS-20 LOADING.
5. CONSTRUCTION JOINT-SEALED WITH 1"
DIA. BUTYL RUBBER OR EQUIVALENT.
6. EARTH COVER= 0 TO 8 FEET MAX.
SLOPED END
SCHEMATIC
BOX CULVERT
SCHEMATIC
CONCRETE
CULVERT
12" MIN. COVER
VARIES
(SEE PLAN)
NOTES:
1. DESIGN LOADING FOR THE CULVERT IS H-20.
2. MANUFACTURER DRAWINGS AND CALCULATIONS FOR ALL SECTIONS OF THE CULVERT SHALL BE
PREPARED AND STAMPED BY A MASSACHUSETTS REGISTERED PROFESSIONAL ENGINEER AND SHALL
BE SUBMITTED FOR REVIEW.
3. ALL MATERIALS SHALL BE SUBJECT TO ENGINEER APPROVAL.
4. EXISTING SOILS MUST BE VERIFIED DURING EXCAVATION AND REPLACED AS NECESSARY TO PROVIDE
A STABLE FOUNDATION FOR THE PROPOSED CULVERTS / CULVERT FOUNDATION PAD.
5. COMPACT APPROVED NATIVE BACKFILL TO 95%. PROTECTION IN 6-9" LIFTS.
℄ OF TRAIL
2% SLOPE
SLOPED END
SECTION
COMPACTED NATIVE OR ORDINARY
BORROW (M1.01.0) SUBGRADE
6" OF NATIVE COMMON FILL OR ORDINARY
BORROW (M1.01.0) MATERIAL
6" OF 3/4" CRUSHED
STONE BASE (M2.01.4)
TYPICAL PRECAST CONCRETE CULVERT PROFILE
NOT TO SCALE
FRONT VIEW
FRONT VIEW FOR 29" X 45" REINFORCED CONCRETE HORIZONTAL
ELLIPTICAL PIPE (RC HEP)
NOT TO SCALE
SECTION VIEW
FRONT VIEW FOR 24" X 24" BOX CULVERT
NOT TO SCALE
12"
2' - 0"
3"
24" x 24" BOX
CULVERT
2:1
S
L
O
P
E
6'
12'
6"
6" NATIVE COMMON
FILL OR ORDINARY
BORROW (M1.01.0)
MATERIAL WITHIN
CULVERT
3"
UNDERDRAIN
INVERT "E"
TAPER BIO SOIL
FROM OUTLET
STRUCTURE
BIORETENTION
CLEANOUT
IF L>10' - SEE
DETAIL
24" NOTCH
EL:224.75
NOTES:
1. CONTRACTOR RESPONSIBLE FOR SLOPE STABILIZATION AND SAFETY MEASURES DURING CONSTRUCTION. SIDE SLOPES TO BE 3:1 MAXIMUM SLOPE.
2. LOAM AND SEED SIDE SLOPES PER SPECIFICATIONS. THE REMAINING DISTURBED AREA SHALL BE LOAM & SEEDED OR LANDSCAPED PER PLANTING PLAN.
BIORETENTION PLANTINGS
(SEE PLANTING PLAN)
3" PONDING
DEPTH (MAX)
BIORETENTION AREA DETAIL
NOT TO SCALE
3
OVERFLOW OUTLET
ELEV: "A"
SEE DETAIL
1
3'
MIN
3"
MIN
OUTLET PIPE
ELEV: "F"
VERTICAL EXCAVATION
SLOPE PREFERRED OR
ALTERNATIVE SLOPE
(MAX 1:1)
3"
3
13"
UNDERDRAIN TO OUTLET
THROUGH BLOCK
RETAINING WALL
BIORETENTION AREA ABIORETENTION AREA B
TOP OF BIO SOIL: ELEV "B"
NATIVE COMMON
FILL OR ORDINARY
BORROW (M1.01.0)
12" BIORETENTION SOIL
PEASTONE
BOTTOM OF BIO SOIL: ELEV "C"
BOTTOM OF UNDERDRAIN ELEV: "G"
BOTTOM OF BED ELEV: "D"
3' (MIN)
3"
MIN.
BIORETENTION SOIL
UNDERDRAIN DETAIL
NOT TO SCALE
NOTES:
1. GEOTEXTILE AT BOTTOM OF UNDERDRAIN ONLY.
2. GEOTEXTILE ABOVE UNDERDRAIN SHALL EXTEND VERTICALLY 1-INCH± INTO THE PEA GRAVEL
LAYER & HORIZONTALLY 1-FOOT OFF THE CENTER OF THE UNDERDRAIN PIPE.
PEASTONE
1" MIN.
6" PERFORATED PVC UNDERDRAIN PIPE IN 10"
OF 34" CRUSHED STONE (M2.01.4)
NO GEOTEXTILE FABRIC
ALONG BOTTOM OF THE
BIORETENTION BED
ENGINEER APPROVED NATIVE
OR BACKFILL MATERIAL
TYPICAL BIORETENTION CLEANOUT DETAIL
NOT TO SCALE
3"BIORETENTION FILTER
MEDIA & PEASTONE (SEE
BIORETENTION DETAIL)
SECURABLE SCREW IN PVC CAP
NON-PERFORATED 6" PVC ELBOW
CONNECTION TO UNDERDRAIN PIPE
6" PERF. PVC
UNDERDRAIN
6" DIA (MIN) SOLID
SCH 40 PVC
GRANULAR PROCESSED GRAVEL FILL
(M1.03.1) COMPACTED TO 95% DENSITY
24"
135°6" MIN.4"-24"
PIPE Ø
120°
135°VARIABLE OVERALLHEIGHT (2' MIN.)NOTE:
ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0% TO
359%.
DOMED DROP IN
GRATE
INLET AND OUTLET
ADAPTERS AVAILABLE 4"
THRU 24"
OVERFLOW OUTLET DETAIL
NOT TO SCALE
VARIOUS TYPES OF OUTLETS
WITH WATERTIGHT
ADAPTERS FOR ADS N-12,
SDR-35 SEWER, SCHEDULE
40 DWV, CORRUGATED PVC,
RIBBED PVC
VARIABLE
INVERT
HEIGHT
MAX. RECOMMENDED
OVERALL HEIGHT 10'
6" MIN. 3/4"
CRUSHED
STONE BASE
(M2.01.4)
NON-WOVEN GEOTEXTILE FABRIC FOR
SUBSURFACE DRAINAGE (M9.50.0)
ON SIDE WALLS AND UNDER UNDERDRAIN ONLY.
NOT FULL BOTTOM OF BIORETENTION AREA
NON-WOVEN GEOTEXTILE FABRIC FOR
SUBSURFACE DRAINAGE (M9.50.0)
ABOVE AND BELOW UNDERDRAIN ONLY
NON-WOVEN GEOTEXTILE
FABRIC FOR SUBSURFACE
DRAINAGE (M9.50.0)
3/4" CRUSHED STONE
BASE (M2.01.4)
3/4" CRUSHED STONE
BASE (M2.01.4)
3/4" CRUSHED
STONE BASE
(M2.01.4)
608143_HD(DETAILS).DWG10-Jun-2022 12:07 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-23 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
DETAILS (3)
SETTING RURAL MAILBOXES
NOT TO SCALE
2'-0"
MIN.
MAIL BOXES ON NARROW
SIDEWALKS SHALL BE SET
BEHIND CURB AND PARALLEL
TO IT WITH THE LETTER SLOT
FACING TRAFFIC
7"±
43"±
NOTES:
1. LUMBER TO BE
PLANED ON ALL
FOUR SIDES TO
FULL 2"X6" SIZE TO
FIT BOTTOM OF
MAIL BOXES.
2. SET 1-1/2" GALV.
PIPE POST - USE
DRVING POINT OF
SAME SIZE & TAMP
POST INTO PLACE
PLUMB BOTH
WAYS.
3. ALL FITTINGS ARE
TO GALVANIZED.
4. 4"X4" PRESSURE
TREATED POST
MAY BE
SUBSTITUTED FOR
A PIPE POST.
5. SEE MA DOT
SPECIFICATIONS
FOR ADDITIONAL
INFORMATION.
WOOD
SCREWS
1-1/2" GALV.
IRON PIPE
5'-3"± LONG
2" X 6" X 18"
LONG SPRUCE
TOP OF
CURB
TOP OF
ROAD
SURFACE
HEAVY DUTY
PIPE FLANGE
NAIL
TOP OF CURB
WOOD
SCREWS
TOP OF
SIDEWALK
TOP OF ROAD SERVICE
MODIFIED ROCKFILL SLOPE STABILIZATION DETAIL
NOT TO SCALE
NON-WOVEN GEOTEXTILE
FABRIC FOR SUBSURFACE
DRAINAGE (M9.50.0) BENEATH
STONE
1' EXCAVATION
MODIFIED ROCKFILL
(M.2.02.4) SLOPE
d5 = 2.5"
d25 = 4"
d100 = 8"
DEPTH = 12"
SEE NOTE ON
GEOTEXTILE
NOTES:
1. TOE-IN & EMBED GEOTEXTILE
MIN. 6" BELOW GRADE
STONE SET 3" ABOVE FINISH
GRADE OF ACCESS WAY
6" OF 3/4"
CRUSHED
STONE BED
(M2.01.4)
COMPLETELY
BACKFILL
GEOTEXTILE
3' TYP.3' TYP.
SEE SITE PLAN
FOR CLEAR OPENING
(12' TYP.)
12"
2.75' TYP.
12"
ACCESS GATE DETAIL
NOT TO SCALE
CL
MULTI-LOCK CHAMBER
POST. SEE SPECIFICATION.TOP RAIL - 3" ID ( 7.58# / FT ) STEEL PIPE
LOCK CHAMBER
POST 6" ID (18.97# /
FT) REMOVABLE
STEEL BOLLARD
BOLLARD SLEEVE
8" x 8" x 1/4" STEEL
PLATE WITH 3/16" WELD
6" COMPACTED GRAVEL (M1.03.0)
3' ID (7.58#/FT) STEEL
PIPE BRACE
9/16" HOLE THROUGH POST CAP & HINGE SHAFT 1/2"
DIAM. GALV., TREATED ROD TO EXTEND THROUGH AND
BE SECURED ON BOTH ENDS WITH GALV. CAP NUTS
3" CAP
3/16" WELDED
6" ID (28.57# / FT)
EXTRA STRONG
STEEL PIPE
2 STANDARD
GREASE FITTINGS
3"3"
1-1/2"
3/16" WELD
HINGE SHAFT 5" ID
(14.62# / FT) STEEL PIPE
CONCRETE FILLED
6" x 6" x 1/4" STEEL
PLATE WITH 3/16" WELD
SHOULDER SLOPE TO DRAIN
DOUBLE POST WHERE REQUIRED
3'-6"
MIN.
NOTE:
1. PROVIDE TWO LOCK CHAMBER POSTS FOR EACH GATE: ONE AT LOCKED POSITION AND ONE AT OPEN POSITION (SEE SITE PLAN).
2. ANY HOLLOW POSTS TO BE FILLED WITH CONCRETE (4,000 PSI, 3/4 IN. MASSDOT M4)
3. * ±0.5% TOLERANCE FOR CONSTRUCTION OF CROSS SLOPES ON ACCESSIBLE SURFACES.
4,000 PSI CONCRETE FOOTING
(3/4 IN. 610, M4.02.00)
5' PEDESTRIAN
ACCESS CLEAR
OPENING
6'-0" MAX
SHOULDER
CLEARANCE
TO BOULDER
3'± DIAM.
BOULDER
(BOTH SIDES)
HEAVY DUTY
PAD LOCK
W/ KEY FOR
BOTH BOLLARDS
12"12"
REMOVABLE
STEEL BOLLARD
12"12"
1.5%*
BOULDER
NOT TO SCALE
GRADE
COMPACTED
NATIVE
SUBGRADE
SET BOULDER BELOW GRADE
AND BACKFILL SO THERE IS NO
MOVEMENT OF STONE
SPACING PER
SITE PLANLANDSCAPE BOULDER
WIDTH VARIES BETWEEN 3-4'
WOOD PEDESTRIAN BARRIER
NOT TO SCALE
2 X 6 RAIL
4'-0"
NOTES:
1. MATERIALS PER MASSDOT M9.05.1, M9.05.3 AND M9.05.5. SEE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
2. POST AND RAILS TO BE PRESSURE TREATED LUMBER GROUND CONTACT LUMBER, NO. 2 GRADE MIN.
3. ALL SPLICES ARE TO BE MADE AT POSTS. ALTERNATE SPLICE CONNECTIONS.
4. FASTENERS TO BE HOT DIPPED GALVANIZED OR STAINLESS STEEL MATCHING ASTM A153 AND ASTM
A653.
5. THE CONTRACTOR SHALL INSTALL EITHER TWO 1/2"Ø BOLTS OR ONE 1"Ø BOLT AT EACH RAIL TO POST
CONNECTION. ALTERNATIVE OPTION: THRU-LOCKING BOLT (FASTENMASTER THRU LOCK OR EQUAL).
6. CONCRETE FOOTING NOT NECESSARY FOR HYDRAULIC POST INSTALLATION. FOOTING MATERIAL TO
EXTEND AROUND THE ENTIRE POST IF EXCAVATING AND BACKFILLING.
7. WOOD POSTS SHALL BE NOTCHED AS NECESSARY TO FACILITATE CURVES AND CHANGES IN
DIRECTION. RAIL SHALL BE CUT TO CREATE A RAIL TO RAIL FLUSH FACE JOINT AS NECESSARY.
8. BEGINNING & END SECTIONS SHALL BE ANCHORED INTO THE GROUND A MINIMUM 1-FOOT BELOW FINISH
GRADE WHERE PARALLEL TO TRAFFIC TO AVOID BLUNT ENDINGS.
9. INSTALL WITH POST BRACKETS WHEN OVER BLOCK WALL AND CONCRETE HEADWALLS.
8' O.C.
FINSH GRADE
2"
6" MIN.
SECTION
PLAN
2 X 6 RAIL
2'-0"
MIN.
TOP RAIL
SPLICE RAIL
AT POST
FASTENERS
(SEE NOTES)
TOP POST
FLUSH W/RAIL
4 X 4
POST
4,000 PSI, 3/4 IN. 610
CONCRETE FOOTING
(M4.02.00) (SEE NOTES)
HEX NUT W/WASHER
BOLT W/WASHER
(SEE NOTES)
4 X 4
POST
NO SPACER
HEX NUT
W/WASHER
BOLT
W/WASHER
2 X 6 RAIL
1'-6"±
1'-6"±
2 X 6 TOP RAIL
POST BELOW CONCRETE
(1" MIN.) FOR FREE DRAINAGE GALV. SPIKE OR SCREW
(2" MIN. EMBEDMENT INTO RAIL)
TIE DOWN STRAP (SEE NOTES)
PUMP DISCHARGE HOSE
SPOUT SEWN INTO BAG
FLOW FROM PUMP
FILTERED WATER FILTERED WATERFILTERED WATERDEWATERING BAG
ON AGGREGATE
OR STRAWUNDERLAY
FLOW FROM PUMP
PUMP DISCHARGE HOSE
TIE DOWN STRAP
(SEE NOTES)
SPOUT SEWN INTO BAG
DEWATERING
BAG
TEMP. AGGREGATE OR STRAW UNDERLAY
A A
SECTION A - A
DEWATERING BAG DETAIL
NOT TO SCALE
INSTALLATION NOTES:
1.PLACE LIFTING STRAPS (NOT
INCLUDED) UNDER THE UNIT TO
FACILITATE REMOVAL AFTER USAGE
2.UNFOLD DANDY DEWATERING BAG ON
STABILIZED AREA OVER DENSE
VEGETATION, STRAW, OR GRAVEL (IF
AN INCREASED DRAINAGE SURFACEIS NEEDED)
3.INSERT DISCHARGE HOSE FROMPUMP INTO DANDY DEWATERING BAG
A MINIMUM OF SIZE INCHES ANDTIGHTLY SECURE WITH ATTACHED
STRAP TO PREVENT WATER FROMFLOWING OUT OF THE UNIT WITHOUT
BEING FILTERED4.IF USING OPTIONAL ABSORBENTS,
PLACE ABSORBENT BOOM INTO THE
DANDY DEWATERING BAG
MAINTENANCE:
1.REPLACE THE UNIT WHEN 1/2 FULL OF
SEDIMENT OR WHEN SEDIMENT HAS
REDUCED THE FLOW RATE OF THE
PUMP DISCHARGE TO AN
IMPRACTICAL RATE
2.IF USING OPTIONAL OIL ABSORBENTS,
REMOVE AND REPLACE ABSORBENT
PILLOW WHEN NEAR SATURATION
DEWATERING SUMP DETAIL
NOT TO SCALE
NOTES:
1.ALL EQUIPMENT IS TEMPORARY AND MUST BE REMOVED AFTER USE. STONE AND/OR NATURALMATERIAL CAN REMAIN.
2.PUMP LOCATION TO SUIT WORK. PUMP SIZE/HP TO SUIT SITE REQUIREMENTS. MULTIPLE PUMPSTO BE INSTALLED WHERE NECESSARY.
3.PUMP CHAMBER SIZE TO BE DETERMINED BASED ON PUMP DIMENSIONS.
4.FINAL DEPTH TO BE DETERMINED BY CONTRACTOR BASED ON EXISTING GRADE.
EXISTING GRADE
PERFORATED HDPE/PVC PIPE ORPRE-CAST PERFORATED PUMP CAGE
UNDISTURBEDNATIVEMATERIAL
3/4" CRUSHED STONE (M2.01.4)
TO SUIT
2' MIN.
TO SUIT2' MIN.
DEWATERING PUMP(S)- SEE NOTES
PUMP DISCHARGE TODEWATERING SYSTEM
SEE
NOTES
AREA OF SOIL
DISTURBANCE
PROTECTED ZONE
FLOW
1" x 1" x 4'
HARDWOOD STAKE
FOLD FLAP (8" MIN.) AND
PLACE TUBE ON TOP. DO
NOT TRENCH FABRIC.
COMPOST FILTER TUBE DETAIL
NOT TO SCALE
SECTION
36"
12"DIA.
INSTALLED
BIORETENTION INFLOW DETAIL
NOT TO SCALE
NOTES:
1. INFLOWS SHALL BE CONSTRUCTED AT THE
LOCATIONS SHOWN ON THE PLAN.
2. BACKFILL SHALL COMPLETELY COVER
GEOTEXTILE.
3. GEOTEXTILE SHALL BE TOE-ED INTO THE
BIORETENTION MATERIAL & UPPER SLOPE
(3" MIN.).
4. SHAPE CHANNEL AS REQUIRED WITH MIN.
6" SIDESLOPE DEPTH.
SECTION
PLAN
VARIES,
SEE PLAN
TOP WIDTH TO
SUIT CHANNEL
3' TYP.
INFLOW SIDEBOTTOM WIDTH
2X TOP WIDTH
FLOW
BIORETENTION MATERIAL
(SEE DETAIL)
BIORETENTION SURFACE
(SEE DETAIL)
1-1/2" CRUSHED STONE
(M2.01.1)
PAVEMENT
(SEE DETAIL)
NATIVE SUBGRADE
6" MIN. OF 3/4" CRUSHED
STONE BASE (M2.01.4)
12" MIN
NON-WOVEN
GEOTEXTILE FABRIC
FOR SUBSURFACE
DRAINAGE (M9.50.0)
1.5% *
WOOD PEDESTRIAN BARRIER RAILING
(SEE BELOW DETAIL OF RETAINING
WALL AT POST)
INFILL SOIL
APPROVEDSUBGRADE
NOTES:
1. SEE SPECIFICATIONS FOR MANUFACTURERS INSTALLATION INSTRUCTIONS.
2. ± 0.5% TOLERANCE FOR CONSTRUCTION OF CROSS SLOPES ON
ACCESSIBLE SURFACES.
BLOCK RETAINING WALL DETAIL
NOT TO SCALEWALL HEIGHTVARIESSEE GRADINGPLAN(4 FEET MAX.)PERFORATED DRAIN WITH
FILTER SOCK
GEOGRID
SEE MANUFACTURERS
INSTRUCTIONS
12" DEEP STANDARD
UNIT
12" COPING UNIT
MORTARED IN
8" OF DENSE GRADED
CRUSHED STONE
(M2.01.7) LEVELING PAD NON-WOVEN GEOTEXTILE
FABRIC FOR SUBSURFACE
DRAINAGE (M9.50.0)
1.5% *
NOTES:
1. SEE SPECIFICATIONS FOR MANUFACTURERS INSTALLATION INSTRUCTIONS.
2. ± 0.5% TOLERANCE FOR CONSTRUCTION OF CROSS SLOPES ON
ACCESSIBLE SURFACES.
BLOCK RETAINING WALL WITH BARRIER POST DETAIL
NOT TO SCALEWALL HEIGHTVARIESSEE GRADINGPLAN(4 FEET MAX.)PERFORATED DRAIN WITH
FILTER SOCK
GEOGRID LENGTH
SEE MANUFACTURERS
INSTRUCTIONS
12" DEEP STANDARD
UNIT
12" COPING UNIT
MORTARED IN
8" OF DENSE GRADED
CRUSHED STONE
(M2.01.7) LEVELING PAD NON-WOVEN GEOTEXTILE
FABRIC FOR SUBSURFACE
DRAINAGE (M9.50.0)
POST AND 6" CONCRETE FOOTING TO
EXTEND 4' BELOW SURFACE (SEE
WOOD PEDESTRIAN BARRIER DETAIL)
M1.01.0
M1.01.0
APPLY COMPOST MULCH OVER
STONE SUCH THAT MULCH FILLS
THE VOIDS AND IS AT OR SLIGHTLY
BELOW THE SURFACE OF THE
STONES. NOT ALL STONES WILL
BE COMPLETELY COVERED
SEED (SEED MIX 2)
OVER COMPOST PER
SPECIFICATIONS
INFILL SOIL
APPROVEDSUBGRADE
SURFACE VARIES.
SEE PLAN
SURFACE VARIES.
SEE PLAN
SECTION - TRUNK ARMORING & PRUNING
CONSTRUCTION ZONE
PRUNE CANOPY AS REQUIRED
TO PREVENT DAMAGE FROM
CONSTRUCTION EQUIPMENT.
REMOVE DEAD/DAMAGED LIMBS
IF AND AS DIRECTED.
PRUNING SHALL BE PER ANSI
A300 STANDARDS
NO TRESPASSING, STORAGE OF
EQUIPMENT, OR STOCKPILING OF
MATERIALS
ARMOR TREES AS
SHOWN ON PLANS
OR PER ARBORIST
ARMOR FROM BASE OF
TREE, INCLUDING ROOT
FLARE, TO FIRST BRANCH.
TREE ROOT ZONE
TREE PROTECTION - TRUNK
1-1/2" CRUSHED STONE
(M2.01.1) TO EXTEND AT
LEAST 12" BEHIND BLOCKS
NOTES:
1. SEE SPECIFICATIONS FOR INSTALLATION INSTRUCTIONS.
2. FOR WOOD PEDESTRIAN BARRIER POSTS, WHEN CONCRETE FOOTING IS NOT POSSIBLE.
3. ALL HARDWARE TO BE HOT DIPPED GALVANIZED STEEL.
POST BRACKET (WOOD TO CONCRETE)
NOT TO SCALE
4" X 4" 12 GAUGE BLACK
POWDER COAT STEEL
POST BASE
1/2" DIA. CONCRETE
ANCHORS (4)
SECURE POST TO
BRACKET WITH 1/4" SDS
SCREWS (8 TOTAL)
CONCRETE HEADWALL OR
BLOCK WALL UNIT
1-1/2" CRUSHED STONE
(M2.01.1) TO EXTEND AT
LEAST 12" BEHIND BLOCKS
7"
MIN.
608143_HD(DETAILS).DWG10-Jun-2022 12:07 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-24 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
DETAILS (4)
JUTE MESH SLOPE STABILIZATION DETAIL
NOT TO SCALE
TURN THE END UNDER 4" ANDSTAPLE AT 5' INTERVALS
NOTES:.
1.LOAM AND SEED PRIOR TO FABRIC INSTALLATION.
2.SLOPE SURFACE SHALL BE SMOOTH BEFORE PLACEMENT FOR PROPER SOIL CONTACT.
3.STAPLING PATTERN AS PER MANUFACTURER'S RECOMMENDATIONS.
4.DO NOT STRETCH FABRIC/MATTINGS TIGHT. ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES.
5.LIME, FERTILIZE AND SEED BEFORE INSTALLATION. PLANTING OF SHRUBS, TREES, ETC. SHOULD OCCUR
AFTER INSTALLATION.
STAPLE OVERLAPS
MAX. 12" SPACING
ANCHOR IN 6"x6"
MIN. TRENCH &STAPLE AT
12" INTERVALS
100%
BIODEGRADABLE
JUTE MESH
HYDROSEED PRIOR TO
FABRIC INSTALLATION
6" MIN.
OVERLAP
EDGE OF PAV
E
M
E
N
T
1
1 TYP.
FLOW
FLOW LIN
E
VARIES
3' TYP.
3' MAX.
GEOTEXTILE FABRIC
FOR SUBSURFACE
DRAINAGE (M9.50.0)
UNDERNEATH STONE
MODIFIED ROCKFILL
(M.2.02.4) SLOPE
D5 = 2.5"
D25 = 4"
D100 = 8"
DEPTH = 12"
FLOW LIN
E
50' TYPICAL
SEE PLAN FOR LOCATION
PROFILE A-A
SPACING
STONE CHECK DAM FOR SWALE DETAIL
NOT TO SCALE
CROSS SECTION
3' MAX.
9" MIN.
18"
SEE NOTE 1
18"
SEE NOTE 1
A
A
NOTES:
1. KEY STONE INTO THE SWALE/DITCH BANKS AND EXTEND INTO THE ABUTMENTS A MINIMUM
OF 18" TO PREVENT FLOW FROM DIVERTING THE CHECK DAM.
MAINTAIN LOWPOINT AT
CENTER OF CHECK
GEOTEXTILE FABRIC
FOR SUBSURFACE
DRAINAGE (M9.50.0)
UNDERNEATH STONE
1" LIP
HSL
HIGH SIDE
TRANSITION
LSL
LOW SIDE
TRANSITION
6'-6" MIN.5'-0" MIN.1.5% CROSSSLOPE5% TO 15%SLOPE5'-0" MIN.
PATH OF TRAVEL VARIES
ROADWAY
7.5%*
7.5%*
5% TO 15% SLOPE
6"EDGE OF ROADWAY
CURB
FOUNDATION
DRIVEWAY
HMA = 3 1/2"
ROADWAY DOWNGRADE
SIDEWALK THROUGH DRIVEWAYS - WITHOUT CURB RETURNS
NOT TO SCALE
WSIDEWALK
8" MIN. DENSE GRADED
CRUSHED STONE FOR
SUBBASE
M2.01.7
1.5%* SLOPE
A
A
SECTION A-A
HMA = HOT MIX ASPHALT
HSL = HIGH SIDE TRASITION LENGTH
LSL = LOW SIDE TRASITION LENGTH
W = WIDTH OF SIDEWALK
CC = CEMENT CONCRETE
WCR #3
ST 1+00 (CROSSWALK CL)
NOT TO SCALE
SIDEWALK
8'
7.5%
±0.5%
CONCRETE
SLOPED RAMP
HIGH SIDE
TRANSITION
(6-7' TYP.)
SHOULDER
ROADWAY
"LEVEL ENTRANCE"
1.5 % MAX. SLOPE
FOR DRAINAGE
CURB OR
BERM
MATCH
EXISTING
GRADE
5' MIN.
DETECTABLE
WARNING PANEL
WHERE PATH
MEETS EX.
SIDEWALK SEE
RAMP DETAIL.
10' WIDE
CROSSWALK
DIRECTION
OF TRAFFIC
WCR #1
ST 0+4.20 (CROSSWALK CL)
NOT TO SCALE
WCR #2
ST 0+48.75 (CROSSWALK CL)
NOT TO SCALE
EXISTING
SIDEWALK
5'
7.5%
±0.5%ROADWAY"LEVEL ENTRANCE"
1.5 % MAX. SLOPE
FOR DRAINAGE
CURB OR
BERM
MATCH
EXISTING
GRADE
5' MIN.
CONCRETE
SLOPED RAMP
HIGH SIDE
TRANSITION
(6-7' TYP.)
10' WIDE
CROSSWALK
7.5%
±0.5%
12.4'
TRANSITION
(6-7' TYP.)
10' WIDE
CROSSWALK
DIRECTION
OF TRAFFIC
EXISTING
SIDEWALK
6'
MATCH
EXISTING
GRADE
CONCRETE
SLOPED RAMP
10' X 10' CONCRETE
LEVEL ENTRANCE
1.5 % MAX. SLOPE FOR
DRAINAGE
RO
A
DW
A
Y
CURB OR
BERM
DETECTABLE
WARNING PANEL
"LEVEL ENTRANCE"
1.5 % MAX. SLOPE
FOR DRAINAGE
DIRECTIONOF TRAFFIC6.5'
DETECTABLE
WARNING PANEL
NOTES:
1. CONTRACTOR TO CONTACT THE ENGINEER IF DISCREPANCIES ARE FOUND IN THE SLOPES AND GRADES
SHOWN PRIOR TO POURING THE CONCRETE.
2. RAMP TO BE CONSTRUCTED OF PORTLAND CEMENT CONCRETE PER MASS DOT & ADA REQUIREMENTS.
3. CONTRACTOR TO REPLACE/RESET EX. CURB/BERM AS NECESSARY.
4. CURB END SECTIONS TO BE INSTALLED AT ALL RAMPS WHEN APPLICABLE.
5. DETECTABLE WARNING PANEL TO BE NON SLIP SURFACE FULLY EMBEDED AND MEETING ADA
REQUIREMENTS INSTALLED AT ALL ROADWAY CROSSING AND INLINE WITH CROSSWALK.DIRECTIONOF TRAFFIC1
2 MAX
TYPICAL GRASS CHANNEL (SWALE) DETAIL
NOT TO SCALE
6" MIN6" MIN
NOTES:
1. CONTRACTOR TO SHAPE THE CHANNEL FINISHED GRADE IN A PARABOLIC MANNER.
2. LOAM & SEED SOIL PRIOR TO MAT INSTALLATION.
3. JUTE MESH TO BE INSTALLED PER MANUFACTURERS GUIDELINES & DETAILS.
4. SPREAD ONE INCH OF TOPSOIL EVENLY OVER MATTING. MAT TO HAVE DIRECT CONTACT WITH THE SOIL
SURFACE.
5. SUBGRADE TO BE UNIFORM AND SMOOTH. REMOVE ALL ROCKS, CLODS, VEGETATION OR OTHER OBJECTS.
6. DO NOT STRETCH FABRIC/MATTINGS TIGHT. ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES.
STABILIZE BOTTOM & SIDESLOPES
OF CHANNEL WITH 100%
BIODEGRADABLE JUTE MESH
(SEE NOTES)
3:1 TYP.
2:1 MAX
1.5'
TYP
2.0'
2:1 TYP.
2.0'
2%
SHOULDER
ALONG PATH
2.0'
2:1 TYP.
PAVED
SURFACE
4" LOAM (M1.05.0) & SEED
(SHORT-TERM EROSION
CONTROL SEED - M6.03.1)
6" SAND BORROW (MEETING M1.04.0
TYPE A) OR ENGINEER APPROVED
EQUAL NATIVE MATERIAL
APPROVED NATIVE
MATERIAL OR ORDINARY
BORROW (M1.01.0)
DEPTH = 6" MIN.
PLAN VIEW
STAPLE OVERLAPS
MAX. 12" SPACING
JUTE MESH TO BE
INSTALLED PARALLEL
TO CHANNEL
STAPLE JUTE MESH AT
BOTTOM OF SLOPE AT 5'
INTERVALS
TURN THE END
UNDER 4" AND
STAPLE AT 5'
INTERVALS
TURN THE END
UNDER 4" AND
STAPLE AT 5'
INTERVALS
3:1 TYP.
2:1 MAX
1.5'
BASE OF
CHANNEL
2.0'
SIDESLOPE
2.0'
SHOULDER
ALONG PATH
2.0'
SIDESLOPE
SECTION VIEW
EDGE OF PAVEMENT
TOP OF SLOPE
BOTTOM OF SLOPE
JUTE MESH TO EXTEND 6"
FROM TOP OF SLOPE
SIDE VIEW INSTALLED
SILT SACK
NOT TO SCALE
NOTES:
1. SEDIMENT CONTROL INSERTS TO BE INSTALLED OVER
ALL CATCHBASINS/INLETS THAT WILL RECEIVE
RUNOFF FROM THE PROJECT SITE.
2.TEMPORARY INLET PROTECTION TO BE REMOVED
AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN
PERMANENTLY STABILIZED.
3. DEPTH (D) TO BE A MINIMUM OF 16-INCHES.
4. MANUFACTURER TO BE SILT SACK OR APPROVED
EQUIVALENT.
D
CATCHBASIN
OUTLET
EXPANSION
RESTRAINT
1" REBAR OR EQUAL
FOR BAG REMOVAL
FROM INLET
OVERFLOW
SLOTS OR
APPROVED
EQUIV.
DUMP LOOP
HANDLES
PROPOSED
AND/OR EXISTING
CATCHBASIN
4'-7"
4'-1"
8'-4 716"
4" X 4"
TIMBER
POST
SEE ROOF
ASSEMBLY
4'-0"
3'-2"
DISPLAY BOARD:
12" TREATED EXTERIOR
PLYWOOD (FRONT AND
READ)
DISPLAY FRAME: 1" X
4" TREATED TIMBER
3'-5"
2'-7"
30" PIANO HINGE
LOCK AND HASP
2'-2 316"
REAR
DISPLAY
BOARDFRONT
DISPLAY
BOARD
SEE
WINDOW
ASSEMBLY
SEE ROOF
ASSEMBLY
2'-6"
0'-6"
0'-3"
1'-6"
2'-1 716"
1'-0"
1'-7 78"
ROOF FRAME
SUPPORTS:
2" X 4"
TREATED
TIMBER
ROOF DECK SUPPORTS (3):
2" X 4" TREATED TIMBER
LENGTH: 3'-9"
6" STRAP HINGE
(ON INNER OF
FRAME SUPPORTS)
TOP LAYER: SHINGLES
MIDDLE LAYER: ROOFING FELT
BOTTOM LAYER: ROOF DECK
12" TREATED EXTERIOR PLYWOOD
L 4'-6" X W 1'-6"
4'-7"
1'-6"
3'-0"2'-9"
3'-5"
3'-8"
PLEXIGLASS
WINDOW
WINDOW FRAME:
1" X 2" TREATED
TIMBER
WAYFINDING KIOSK DETAIL
NOT TO SCALE
SECTION VIEWFRONT VIEW
3/4" CRUSHED
STONE BASE
(M2.01.4)
WINDOW ASSEMBLY
ROOF ASSEMBLY
1"
ROOF DECK SUPPORTS (3):
2" X 4" TREATED TIMBER
ROOF RIDGE
ROOF FRAME
SUPPORTS 3'-9"
ISOMETRIC VIEW
PLAN VIEW
SIDE VIEW
CEMENT CONCRETE PEDESTRIAN CURB RAMPS
NOT TO SCALE
MATCHLINE- SHEET 14MATCHLINE- SHEET 13MATCHLINE- SHEET 13MATCHLINE- SHEET 15ROCKY HILL ROAD60' PUBLIC ROWMATCHLINEMATCHLINE1
2 3 4 5 6 7 8 9 10
11
345
SEE GRADING PLAN (3) SHEET NO. 15L2 C1 L3
C2
L4
L5 L6 L7
C3
C14C15C16
L20L21 L22BVW
DISTURBANCE
AREA 288 SF
BVW
DISTURBANCE
AREA 140 SF
BVW
DISTURBANCE
AREA 152 SF
BVW DISTURBANCE
AREA 375 SF
+86.32
OFFSET: 5.00
+85.22
OFFSET: 5.00
X+65.83
OFFSET: 10.00
X+66.33
OFFSET: 10.00
ROCKY HILL GREENWAY BEGIN
STA 0+00
N2938622.8262
E341980.8583
+86.47
OFFSET: 7.00
111
2 333 4 5 66666554444333333322
11111111111111111
22222 3333 4444 55555 66666 C3C3C3C3C3C3C3C3C3C3C3111111111111111111111111111111111111111111111111L7L7L7L7L7L7L7L7L7L7L7L7L710101010101010101010101010101010101010L6L6L6L6L6L6L6L6L6L69999999L5L5L5L5L5L5L5L5L5888XXXX
XXXXXXXXXX7777C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16C16
SEED MIX 1
APPROX. 3,730 SF
SEED MIX 2
(CONTINUED ON SHEET 28)
TOTAL AREA = APPROX. 64,500 SFSEED MIX 2
APPROX.820 SF
SEE BIORETENTION
PLANTING PLAN
608143_HD(PLANTING).DWG10-Jun-2022 12:07 PMPlotted on0
SCALE: 1" = 40'
40 160100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-25 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
LANDSCAPE PLAN (1)NCONTINUED ONSHEET NO. 26NOTES:
1. PLANT THE SAME SPECIES IN GROUPS OF 3-7 TO CREATE A NATURALIZED APPEARANCE.
2. ALL CAREX IN THE BIORETENTION AREAS SHOULD BE PLANTED CONSISTENTLY ACROSS THE
BOTTOM WITH THE INTENTION OF CREATING AN UNDERSTORY GROUNDCOVER.
3. ANY PLANTS THAT DO NOT FIT AT THE BOTTOM OF THE BIORETENTION AREA CAN BE
INCOPORATED INTO THE PLANTING AT THE TOP OF SLOPE.
BIORETENTION PLANTING PLAN
SCALE: 1" = 10'-0"
SEEDING NOTES:
1. SEED MIX AREAS ARE CALLED OUT ON THE PLANS AND ARE NOT
HATCHED.
2. AN ANNUAL COVER CROP(S), TO BE USED. SPECIES DEPENDENT
ON TIME OF YEAR, SEE SPECS.
SEED MIX 1: TO BE PLANTED IN LOCATIONS ADJACENT TO WETLANDS
AS SHOWN ON THE PLANS. SEE SPECIFICATIONS FOR SEEDING.
SEED MIX 2: TO BE PLANTED IN ALL DISTURBED AREAS WITHIN THE
LOW THAT ARE NOT CALLED OUT TO BE SEEDED WITH SEED MIX 1 AS
SHOWN ON THE PLANS. THIS DOES NOT INCLUDE THE INLAND
WETLAND REPLICATION AREA OR THE BIORETENTION AREAS. SEE
SPECIFICATIONS FOR SEEDING.
TRANSPLANTING:
THE RESIDENT ENGINEER WILL COORDINATE TAGGING PLANTS TO BE
TRANSPLANTED PRIOR TO CONSTRUCTION IN THE AREAS WITH EARTHWORK.
THESE PLANTS WILL BE DIRECTLY TRANSPLANTED OR STOCKPILED PRIOR TO
PLANTING.
CFT
CFT CFTCFT
CFTCFTMATCHLINE- SHEET 14MATCHLINE- SHEET 13MATCHLINEMATCHLINETP 1
TP 2
1
0
11
12
13 14
15 161718
192021
22
2
324 25
26
L7
C3
L8
C4 L9
C5
L10
C6
L11C7 L12 C
8
L13
L14C9
C10L15
C11
L16 C12L
1
7C13 L18
ROCKY HILL GREENWAY END
STA 25+99.87
N2937482.5679
E343496.6877MATCHLINE- SHEET 7MATCHLINE- SHEET 8C12C12C12C12C12C12C12C1222222222222222222222222222222222222222
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
L
1
7
C11C11C11C11C11C11C11C11C11C11C11C11C11C11C11C11C11C11C11C11
252525252525252525252525252525252525252525
21212121212121212121 2424242424242424242424242424242424242424242424242424242424242424242424242424242424C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C13C10C10C10C10C10C10C10C10C10C10C10C10C10C10C10L14L14L14L14L14L14L14L14L14L14L14
2020L14L14L14L14L14
202020202020202020202020L14L14L14
20202020202020L14L14L14L14
202020202020202020L14L14C9C9C9C9C9C9C9C9C9C9C9C9CFTCFTCFTCFTCFTCFTCFTL13L13L13L13L13L13L13L13L13L13L13L13L13L13L13L13L13L1319L13L13L13L13L13L1319191919L13L13L13L1319191919L1319191919191919191919C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
C
8
181818181818181818181818181818181818181818
CFTCFTCFTCFTCFT
L12L12L12L12L12L12L12L12L12L12L12L12L12L12L12L12L12L12L12L12
L11L11L11L11
L12L12L12L12
L11L11L11L11L11L11
L12L12L12L12L12
L11L11L11L11L11L11L11L11L11L11L11L11L11L11L11L11L11L11L11L11L11
1616161616161616161616161616161616161616161616161616161616C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6C6
CFT
C6C6C6C6C6C6C6
CFT
C6C6C6
CFTCFTCFT 1717171717CFT 1717171717171717C7C7C7C71717171717C7C7C7C7C7C7C7171515151515151515151515151515151515151515
14141414141414141414141414141414141414141414141414141414L9L9L9L9L9L9L9L9L9L9L9L9L9L9L9L9131313131313131313131313131313131313131313131313C4C4C4C4C4C4C4C4C4C4C4C4C4C4C4
TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1TP 1L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8L8
1212121212121212121212121212121212121212
C3C3C3C3C3C3C3C3C3C3C3
1111111111111111111111111111111111111111111111
CFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTSEED MIX 2 CONTINUED
(SEE SHEET 27)
TOTAL AREA APPROX.64,500 SF
10+00
1+52.25CFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFT
CFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFT
CFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFTCFT
SEED MIX 1
TOTAL AREA APPROX. 4,000 SF
NAVD 88
BASE ELEV
150.00
INLAND WETLAND REPLICATION AREA
160
170
180
190
150
160
170
180
190
169.910+00 165.77162.421+00 159.462+000+00 1+00 2+00
3:1 TYP.
12" UNCONTAMINATED
WETLAND SOIL
4" LOAM AND SEED MIX 2
PROP CULVERT
82' X 2' X 2'
SEE WETLAND
REPLICATION
PLANTING PLAN
10' PROP
MULTI-USE TRAIL
10' PROP
MULTI-USE TRAIL
3:1 TYP.
JUTE MESH TO
EXTEND 2' DOWN
SLOPE FROM PATH
EDGE
EXISTING
GRADE
INLAND WETLAND REPLICATION AREA
COMPACTED NATIVE FILL
JUTE MESH TO
EXTEND 2' DOWN
SLOPE FROM TRAIL
EDGE 608143_HD(PLANTING).DWG10-Jun-2022 12:07 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-26 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
LANDSCAPE PLAN (2)
N HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE BELOW
0
SCALE: 1" = 40'
40 160100
INLAND WETLAND REPLICATION PLANTING PLAN
SCALE: 1" = 10'
NOTES:
1. PLANT THE SAME PERENNIAL AND FERN SPECIES IN GROUPS OF 7-12 TO CREATE A
NATURALIZED APPEARANCE.
2. ALL CAREX AND JUNCUS SHOULD BE PLANTED CONSISTENTLY ACROSS THE BOTTOM WITH
THE INTENTION OF CREATING AN UNDERSTORY GROUNDCOVER.
608143_HD(PLANTING).DWG10-Jun-2022 12:07 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-27 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
LANDSCAPE DETAILS
EQ.
EQ.
USE EQUIDISTANT TRIANGULAR SPACING FOR PLANTS - FOR ACTUAL SPACING
SEE PLANS OR PLANTING SCHEDULE
EQ.
PACK BACKFILL BY HAND PLANT 12" ON CENTER
12" O.C.
12" O.C.PLANT
CELL
PLUG PLANTING DETAIL
NOT TO SCALE
FINISH GRADE
4"
LOAM AND SEED DETAIL
NOT TO SCALE
ROOTBALL SHALL BE PLACED ON EXISTING SUBSOIL
TREE WRAP SHALL NOT BE USED
COMPLETELY REMOVE SYNTHETIC BURLAP & LACING
BACKFILL MIX PER SPECIFICATIONS
DURING THE FIRST 24 HOURS AFTER PLANTING
WATERING SAUCER SHALL BE FLOODED TWICE
TREE SHALL BE SET PLUMB
CUT & ROLL BACK 1/3 OF BURLAP BEFORE BACKFILLING.
3 INCH HIGH EARTH WATERING SAUCER AROUND TREE PIT
3 INCHES AGED PINE BARK MULCH (PULL MULCH AWAY
ROOT FLARE SHOULD BE SLIGHTLY ABOVE
MIN. 2 X ROOTBALL DIAMETER
ROOTBALL
DO NOT CUT LEADER
FROM TRUNK OF TREE)
6 INCHES
BELOW
ROOTBALL
REMOVE EXCESS SOIL TO EXPOSE ROOT FLARE
CUT & REMOVE WIRE BASKET SIDES
FINISHED GRADE AFTER SETTLEMENT
DECIDUOUS TREE PLANTING DETAIL
NOT TO SCALE
ROOTBALL
BELOW
6 IN
AND BACKFILL WITH PLANTING MIX
EXCAVATE TO REQUIRED DEPTH
EXISTING SUBSOIL
WATER BY FLOODING TWICE IN FIRST TWO HOURS
AFTER PLANTING. WATER & MAINTAIN AS PER
SHRUBS SHALL BE SET PLUMB STANDARD SPECIFICATIONS
BACKFILL MIX PER STANDARD SPECIFICATIONS
AWAY FROM BASE OF SHRUB)
AROUND SHRUB
2-3 INCH DEPTH AGED PINE BARK MULCH (PULL
3 INCH HIGH EARTH WATERING SAUCER
ACCEPTED FOR PLANTING
LOOSE OR CRACKED ROOTBALLS WILL NOT BE
3 X ROOTBALL
ROOTBALL
LACING. FOR CONTAINERIZED PLANTS, REMOVE
CONTAINER PRIOR TO PLANTING. SCORE SIDES OF
CONTAINER AND LOOSEN ANY ROOTS ENCIRCLING
THE ROOT BALL
COMPLETELY REMOVE SYNTHETIC BURLAP AND
CROWN OF SHRUB SHOULD BE SLIGHTLY ABOVE
FINISHED GRADE AFTER SETTLING
SHRUB PLANTING DETAIL
NOT TO SCALE
PLANTING SPACING DETAIL
NOT TO SCALE
EXISTING SUBSOIL
SPACING VARIES
SEE PLANS OR NOTES
EXCAVATE TO REQUIRED DEPTH AND BACKFILL
WITH PLANTING MIX
RAISE AND REPLANT PLANTS THAT SETTLE MORE
THAN 3 INCHES AFTER PLANTING AND WATERING IN
WATER BY FLOODING TWICE IN FIRST TWO HOURS
AFTER PLANTING. WATER & MAINTAIN AS PER
STANDARD SPECIFICATIONS
CROWN OF PLANT TO BE SLIGHTLY ABOVE
FINISHED GRADE AFTER SETTLING
1INCH MAX. DEPTH AGED PINE BARK MULCH
(PULL AWAY FROM BASE)
2 INCH HIGH EARTH WATERING SAUCER
BACKFILL MIX PER SPECIFICATIONS
REMOVE PLANT FROM CONTAINER EVEN IF
PLANTABLE CONTAINER. SCORE SIDES
AND BOTTOM OF ROOT BALL TO LOOSEN
ROOTS
PERENIAL PLANTING DETAIL
NOT TO SCALE
SEED:ALONG PATH - SLOPES & SHOULDERS M6.03.1
WETLAND RESTORATION/MITIGATION - PER PLAN
TOPSOIL: M1.05.0
SUBSOIL: COMPACTED NATIVE MATERIALOR ORDINARY BORROW (M1.01.0)COMPACTED AT 90% MAXIMUM DENSITY
WETLAND MONITORING WELL DETAIL
NOT TO SCALE
BENTONITE/SOIL
MIXTURE
RISER
VENTED WELL CAP
(LOOSELY FITTED)
WELL STOCK
AUGURED
HOLE
WELL
SCREEN
SAND FILTER
PACK
WELL CAP WITH
DRAIN HOLE
BENTONITE
SEAL
GROUND
SURFACE
0+00
252
256
260
252
256
260
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 0+00.00
Material Name
cut rocky hill
fill rocky hill
Area
8.431
0.278
256.3256.270+50
252
256
252
256
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 0+50.00
Material Name
cut rocky hill
fill rocky hill
Area
9.810
0.620
253.4
253.40
8.00'
PROP SIDEWALK
REMOVE AND
RESET CURB
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB
0+76
248
252
248
252
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 0+76.00
Material Name
cut rocky hill
fill rocky hill
Area
8.017
0.005
251.7
251.68
5.20'
PROP DRIVEWAY
CROSSING
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM GUTTER LINE
1+00
248
252
248
252
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 1+00.00
Material Name
cut rocky hill
fill rocky hill
Area
9.660
0.644
250.6
250.58
8.00'
PROP SIDEWALK
REMOVE AND
RESET CURB
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-28 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - ROCKY HILL SIDEWALK (1)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
1+50
244
248
252
244
248
252
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 1+50.00
Material Name
cut rocky hill
fill rocky hill
Area
9.137
0.836
247.5247.488.00'
PROP SIDEWALKREMOVE AND
RESET CURB
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB
1+62
244
248
252
244
248
252
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 1+62.00
Material Name
cut rocky hill
fill rocky hill
Area
7.393
0.370
246.8246.835.20'
PROP DRIVEWAY CROSSING
MEET EXISTING
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB
2+00
240
244
248
252
240
244
248
252
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 2+00.00
Material Name
cut rocky hill
fill rocky hill
Area
18.584
0.492
244.9
244.92
8.00'
PROP
SIDEWALK
PROP MODIFIED
STONE SLOPE
REMOVE AND
RESET CURB
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB
2+50
240
244
248
240
244
248
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 2+50.00
Material Name
cut rocky hill
fill rocky hill
Area
13.715
2.403
241.8
241.84
8.00'
PROP SIDEWALK
REMOVE AND
RESET CURB
PROP MODIFIED
STONE SLOPE
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB
3+00
236
240
244
248
236
240
244
248
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 3+00.00
Material Name
cut rocky hill
fill rocky hill
Area
15.199
2.482
239.0239.028.00'
PROP
SIDEWALK
REMOVE AND
RESET CURB PROP MODIFIED
STONE SLOPE
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-29 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - ROCKY HILL SIDEWALK (2)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
3+50
232
236
240
244
232
236
240
244
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 3+50.00
Material Name
cut rocky hill
fill rocky hill
Area
18.523
0.790
236.4236.438.00'
PROP
SIDEWALK
REMOVE AND
RESET CURB PROP MODIFIED
STONE SLOPE
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB
4+00
232
236
232
236
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 4+00.00
Material Name
cut rocky hill
fill rocky hill
Area
6.641
0.496
233.2
233.16
5.20'
PROP DRIVEWAY
CROSSING
MEET
EXISTING
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM DRIVEWAY
4+50
228
232
228
232
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28
Material(s) at Station 4+50.00
Material Name
cut rocky hill
fill rocky hill
Area
10.740
15.846
230.9230.898.00'
PROP SIDEWALK 3:1 SLOPES TO
MEET EXISTING
SAWCUT/LIMIT OF WORK LINE
1.5' OFF FROM RESET CURB
5+00
224
228
232
224
228
232
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60-64-68 226.1226.098.00'
PROP SIDEWALKPROP PAVED PARKING
SEE CONSTRUCTION PLANS
PROP BLOCK
RETAINING WALL
PROP WOOD PEDESTRIAN
BARRIER
5+50
220
224
228
220
224
228
0 4 8 12 16 20 24 280-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60-64-68-72-76
Material(s) at Station 5+50.00
Material Name
cut rocky hill
fill rocky hill
Area
3.091
25.540
223.1223.138.00'
PROP SIDEWALK
PROP BIORETENTION
AREA
PROP BLOCK
RETAINING WALL
PROP WOOD PEDESTRIAN
BARRIER
PROP PAVED PARKING
SEE CONSTRUCTION PLANS 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-30 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - ROCKY HILL SIDEWALK (3)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
0+00
224
228
232
224
228
232
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 227.46Material(s) at Station 0+00.00
Material Name
CUT
FILL
Area
0.000
0.000
0+50
220
224
228
220
224
228
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 226.5224.59Material(s) at Station 0+50.00
Material Name
CUT
FILL
Area
6.246
148.734PROP PAVED PARKING
8' PROP SIDEWALK/PATH
PROP PAVED PARKING
PROP RETAINING
WALL
PROP RETAINING
WALL
PROP WOOD PEDESTRIAN
BARRIER
PROP WOOD PEDESTRIAN
BARRIER
1+00
220
224
228
220
224
228
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 224.8223.04Material(s) at Station 1+00.00
Material Name
CUT
FILL
Area
0.000
56.100
18.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
1+50
220
224
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60
Material(s) at Station 1+50.00
Material Name
CUT
FILL
Area
12.644
7.587
222.4
222.09
16.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER 3:1 SLOPES TO
MEET EXISTING
2+00
220
224
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60
Material(s) at Station 2+00.00
Material Name
CUT
FILL
Area
17.964
1.154
221.4
221.35
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
2+50
216
220
224
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 220.9221.40Material(s) at Station 2+50.00
Material Name
CUT
FILL
Area
24.482
1.099
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-31 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
3+00
216
220
224
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 220.4220.67Material(s) at Station 3+00.00
Material Name
CUT
FILL
Area
23.059
2.435
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
3+50
216
220
224
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 219.9220.00Material(s) at Station 3+50.00
Material Name
CUT
FILL
Area
19.263
1.124
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
4+00
216
220
224
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 219.4
218.81
Material(s) at Station 4+00.00
Material Name
CUT
FILL
Area
8.212
13.318
2.00'
SHOULDER16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
4+50
216
220
224
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 218.9
219.06
Material(s) at Station 4+50.00
Material Name
CUT
FILL
Area
20.720
2.842
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
5+00
212
216
220
224
212
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 218.4218.51Material(s) at Station 5+00.00
Material Name
CUT
FILL
Area
19.007
5.717
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-32 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (2)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
5+50
212
216
220
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 217.9217.94Material(s) at Station 5+50.00
Material Name
CUT
FILL
Area
16.489
6.719
16.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
5+85
208
212
216
220
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 217.6217.65Material(s) at Station 5+85.00
Material Name
CUT
FILL
Area
14.798
10.225
16.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER
PROP CULVERT
SEE GRADING PLANS
2.50'
2.00'
SHOULDER
2:1 SLOPES TO
MEET EXISTING
HEADWALL
HEADWALL
PROPOSED
GRADE
STONE FOR
PIPE ENDS
APPROX. ELEV OF
EXISTING SURFACE
PROP WOOD PEDESTRIAN
BARRIER
PROP WOOD PEDESTRIAN BARRIER
STONE FOR
PIPE ENDS
6+00
208
212
216
220
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 217.4217.46Material(s) at Station 6+00.00
Material Name
CUT
FILL
Area
15.532
6.185
16.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
6+50
208
212
216
220
224
208
212
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 216.9217.67Material(s) at Station 6+50.00
Material Name
CUT
FILL
Area
32.026
1.394
16.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-33 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (3)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
7+00
208
212
216
220
224
208
212
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 216.0216.66Material(s) at Station 7+00.00
Material Name
CUT
FILL
Area
31.526
0.654
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
7+50
208
212
216
220
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 214.8214.68Material(s) at Station 7+50.00
Material Name
CUT
FILL
Area
16.612
3.457
16.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER3:1 SLOPES TO
MEET EXISTING
8+00
204
208
212
216
204
208
212
216
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 213.6212.84Material(s) at Station 8+00.00
Material Name
CUT
FILL
Area
2.706
10.99510.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
8+50
204
208
212
216
220
204
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 212.3211.48Material(s) at Station 8+50.00
Material Name
CUT
FILL
Area
1.079
19.960
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-34 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (4)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
3:1 SLOPES TO
MEET EXISTING
8+54
204
208
212
216
220
204
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 212.2211.50Material(s) at Station 8+54.00
Material Name
CUT
FILL
Area
2.207
16.122
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER STONE FOR
PIPE ENDS
STONE FOR
PIPE ENDS
PROP WOOD
PEDESTRIAN
BARRIER
PROP WOOD
PEDESTRIAN
BARRIER
3:1 SLOPE TO
MEET EXISTING
PROP
HEADWALL
PROP
HEADWALL
9+00
200
204
208
212
216
220
200
204
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 211.1211.29Material(s) at Station 9+00.00
Material Name
CUT
FILL
Area
13.547
0.546
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
9+50
200
204
208
212
216
220
200
204
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 209.8211.40Material(s) at Station 9+50.00
Material Name
CUT
FILL
Area
46.871
0.253
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-35 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (5)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
10+00
204
208
212
216
220
204
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 208.4211.62Material(s) at Station 10+00.00
Material Name
CUT
FILL
Area
108.852
0.321
10.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
10+50
200
204
208
212
216
220
224
200
204
208
212
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 206.5213.73Material(s) at Station 10+50.00
Material Name
CUT
FILL
Area
282.510
0.000
10.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING PROP GRASS
CHANNEL
11+00
200
204
208
212
216
220
224
200
204
208
212
216
220
224
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 204.5213.75Material(s) at Station 11+00.00
Material Name
CUT
FILL
Area
418.668
0.000
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP GRASS
CHANNEL 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-36 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (6)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
11+50
198
200
204
208
212
216
220
198
200
204
208
212
216
220
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 202.5212.24Material(s) at Station 11+50.00
Material Name
CUT
FILL
Area
524.470
0.000
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP GRASS
CHANNEL
12+00
196
200
204
208
212
216
196
200
204
208
212
216
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 200.5209.48Material(s) at Station 12+00.00
Material Name
CUT
FILL
Area
377.038
0.000
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING PROP GRASS
CHANNEL
12+50
194
196
200
204
208
212
194
196
200
204
208
212
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 198.5204.08Material(s) at Station 12+50.00
Material Name
CUT
FILL
Area
229.113
0.000
10.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP GRASS
CHANNEL 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-37 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (7)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
13+00
192
196
200
204
208
192
196
200
204
208
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 196.5199.24Material(s) at Station 13+00.00
Material Name
CUT
FILL
Area
99.891
0.025
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING PROP GRASS
CHANNEL
13+50
188
192
196
200
204
188
192
196
200
204
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 194.5195.09Material(s) at Station 13+50.00
Material Name
CUT
FILL
Area
39.211
0.01810.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
PROP GRASS
CHANNEL
13+85
184
188
192
196
200
204
184
188
192
196
200
204
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 193.0190.77Material(s) at Station 13+85.00
Material Name
CUT
FILL
Area
1.028
24.957
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
PROP CULVERT
SEE GRADING PLANS
2.08'
2.00'
SHOULDER
PROP
HEADWALL PROP
HEADWALL
2:1 SLOPES TO
MEET EXISTING
STONE FOR
PIPE ENDS
STONE FOR
PIPE ENDS
PROP WOOD
PEDESTRIAN BARRIER PROP WOOD
PEDESTRIAN BARRIER 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-38 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (8)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
14+00
180
184
188
192
196
200
204
180
184
188
192
196
200
204
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 192.3192.07Material(s) at Station 14+00.00
Material Name
CUT
FILL
Area
9.517
4.887
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
14+50
172
176
180
184
188
192
196
200
172
176
180
184
188
192
196
200
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 189.9188.27Material(s) at Station 14+50.00
Material Name
CUT
FILL
Area
0.000
27.743
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-39 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (9)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
15+00
176
180
184
188
192
196
176
180
184
188
192
196
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 187.4185.53Material(s) at Station 15+00.00
Material Name
CUT
FILL
Area
0.000
33.03310.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
15+50
172
176
180
184
188
192
172
176
180
184
188
192
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 184.9179.99Material(s) at Station 15+50.00
Material Name
CUT
FILL
Area
0.000
183.981
10.00'
PROP MULTI
USE TRAIL 2.00'
SHOULDER2.00'
SHOULDER3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
16+00
168
172
176
180
184
168
172
176
180
184
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 182.4172.73Material(s) at Station 16+00.00
Material Name
CUT
FILL
Area
0.013
415.323
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-40 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (10)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
16+50
160
164
168
172
176
180
184
160
164
168
172
176
180
184
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 179.9168.09Material(s) at Station 16+50.00
Material Name
CUT
FILL
Area
0.000
524.190
10.00'
PROP MULTI
USE TRAIL 2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
PROP WOOD
PEDESTRIAN BARRIER
17+00
160
164
168
172
176
180
160
164
168
172
176
180
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 177.4165.23Material(s) at Station 17+00.00
Material Name
CUT
FILL
Area
0.000
593.89110.00'
PROP MULTI
USE TRAIL 2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
PROP WOOD
PEDESTRIAN BARRIER
17+50
156
160
164
168
172
176
156
160
164
168
172
176
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 174.9161.43Material(s) at Station 17+50.00
Material Name
CUT
FILL
Area
0.000
719.54210.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
PROP WOOD PEDESTRIAN
BARRIER 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-41 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (11)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
18+00
152
156
160
164
168
172
176
152
156
160
164
168
172
176
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 172.9159.80Material(s) at Station 18+00.00
Material Name
CUT
FILL
Area
0.000
708.603
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
18+50
156
160
164
168
172
156
160
164
168
172
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 171.1159.45Material(s) at Station 18+50.00
Material Name
CUT
FILL
Area
0.074
581.526
10.00'
PROP MULTI USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
PROP WOOD PEDESTRIAN
BARRIER
18+80
152
156
160
164
168
172
152
156
160
164
168
172
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 170.0159.19Material(s) at Station 18+80.00
Material Name
CUT
FILL
Area
0.000
508.910
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
PROP CULVERT
SEE GRADING PLANS
2.00'
SHOULDER3:1 SLOPES TO
MEET EXISTING
STONE FOR
PIPE ENDS
PROP WOOD PEDESTRIAN
BARRIER
NO HEADWALLS ON EITHER SIDE
OF CULVERT, CULVERT TO BE
MITERED TO MATCH SLOPE 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-42 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (12)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
19+00
156
160
164
168
172
156
160
164
168
172
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 169.3159.37Material(s) at Station 19+00.00
Material Name
CUT
FILL
Area
0.000
447.411
10.00'
PROP MULTI USE TRAIL 2.00'
SHOULDER2.00'
SHOULDER3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
19+50
156
160
164
168
156
160
164
168
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 167.6160.63Material(s) at Station 19+50.00
Material Name
CUT
FILL
Area
0.000
251.94510.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
PROP WOOD PEDESTRIAN
BARRIER
20+00
156
160
164
168
156
160
164
168
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 165.8163.38Material(s) at Station 20+00.00
Material Name
CUT
FILL
Area
0.074
57.244
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD
PEDESTRIAN BARRIER
PROP WOOD PEDESTRIAN
BARRIER
20+50
156
160
164
168
172
176
156
160
164
168
172
176
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 164.1163.97Material(s) at Station 20+50.00
Material Name
CUT
FILL
Area
9.960
2.343
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
PROP WOOD PEDESTRIAN
BARRIER 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-43 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (13)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
21+00
156
160
164
168
156
160
164
168
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 162.3162.66Material(s) at Station 21+00.00
Material Name
CUT
FILL
Area
17.209
0.000
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
PROP WOOD PEDESTRIAN
BARRIER
21+50
156
160
164
156
160
164
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 160.6159.69Material(s) at Station 21+50.00
Material Name
CUT
FILL
Area
1.342
14.892
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD
PEDESTRIAN BARRIER
22+00
152
156
160
152
156
160
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 158.8156.47Material(s) at Station 22+00.00
Material Name
CUT
FILL
Area
0.000
53.249
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
22+50
152
156
160
152
156
160
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 157.1155.87Material(s) at Station 22+50.00
Material Name
CUT
FILL
Area
0.000
24.176
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD
PEDESTRIAN
BARRIER
23+00
148
152
156
160
148
152
156
160
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 155.3155.44Material(s) at Station 23+00.00
Material Name
CUT
FILL
Area
23.190
0.643
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
PROP GRASS
CHANNEL
3:1 SLOPES TO
MEET EXISTING
PROP WOOD
PEDESTRIAN BARRIER 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-44 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (14)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
23+50
148
152
156
160
148
152
156
160
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 153.6155.94Material(s) at Station 23+50.00
Material Name
CUT
FILL
Area
97.105
0.00010.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
PROP GRASS
CHANNEL
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
24+00
144
148
152
156
160
144
148
152
156
160
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 151.8155.77Material(s) at Station 24+00.00
Material Name
CUT
FILL
Area
158.224
0.000
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
PROP GRASS
CHANNEL
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
24+50
144
148
152
156
144
148
152
156
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 150.3154.56Material(s) at Station 24+50.00
Material Name
CUT
FILL
Area
166.909
0.114
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
PROP GRASS
CHANNEL
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
25+00
144
148
152
156
144
148
152
156
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 149.3152.10Material(s) at Station 25+00.00
Material Name
CUT
FILL
Area
99.001
0.000
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER
2.00'
SHOULDER
PROP GRASS
CHANNEL
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-45 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (15)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
25+50
144
148
152
156
144
148
152
156
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 148.6152.51Material(s) at Station 25+50.00
Material Name
CUT
FILL
Area
97.953
0.000
10.00'
PROP MULTI
USE TRAIL
2.00'
SHOULDER2.00'
SHOULDER
3:1 SLOPES TO
MEET EXISTING
PROP WOOD PEDESTRIAN
BARRIER
26+00
144
148
152
144
148
152
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56-60 147.83Material(s) at Station 26+00.00
Material Name
CUT
FILL
Area
0.000
0.000 608143_HD(CROSS_SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.
-46 46
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CROSS SECTIONS - MULTI USE TRAIL (16)
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8