Loading...
CD_8-28_WORKING DRAWINGS - Sheet - A-5 - BUILDING SECTIONS-3NEW FF -8" NEW DOOR WITH SWEEP, TYP. - SEE 1/A8 GOSHEN STONE THRESHOLD - THERMAL FINISH - SLOPE 3/8" DOWN FROM 1/4" ABOVE FF TO MEET BRICK PLAZA - SEE LA DRWGS FOR PAVING INFORMATION, TYP. LOCATION OF 1 X AZEK DOOR JAMB SURROUND ATTACHED TO SIDE OF BARN COL. -ALIGN W/FACE OF CLAPBOARD / SHIPLAP OUTSIDE AND W/FACE OF BASEBOARD NSIDE, TYP. 1/2"11"3"8"POTENTIAL LOCATION FOR MINI- TRENCH DRAIN - DISCUSS W/ARCHITECT AND CLIENT SEE LA DRAWINGS FOR PAVING DETAILS 2 A-6 1 A-6 NEW FF -8" 103' SEE 2A,B,C/A-8 FOR DOOR --- - NEW FF -8" A-5 7 A-9 5A SEE 5A/A-9 FOR DOOR SEE 4A,B/A-9 FOR DOOR SEE 1A,B,C/A-8 FOR DOOR NEW FF -8"1' - 0"2"4"1 1/2"2"11"2 COURSES 1" ROUGH- CUT AIR-DRIED HEMLOCK BOARDS, SQUARE EDGED, TYP. COMPACTED 3/4" STONE, TYP. 2 X 4 PT SLEEPER, TYP. 4" REINFORCED CONCRETE SLAB, TYP. PERIMETER DRAIN PIPE (SEE LA DRWGS.), TYP. FOR FOUNDATION DETAILS - SEE FOUNDATION DRWGS. 6 MIL POLYETHELENE VAPOR BARRIER - OVERLAP & SEAL SEAMS- WRAP UP AT EDGES AGAINST FOUNDATION, TYP. 2" RIGID POLYETHELENE INSULATION, TYP. FOR PAVING & SITE DRAINAGE DETAILS -SEE LA DRWGS. FOR TIMBER FRAME DETAILS AND REPAIRS - SEE TIMBER FRAME DRWGS. WATERPROOFING MEMBRANE, TYP. 8"2 1/8" +/-CLAPBOARD AND/OR SHIPLAP SIDING, TYP. BUILDING PAPER ON ALL NEW CONSTRUCTION, TYP. NEW CEDAR SHEATHING OR EXISTING SHEATHING, TYP. FLASHING W/DRIP EDGE, TYP. BEDDING SEAL UNDER FLASHING POLYMER-MODIFIED THINSET MORTAR STONE VENEER - 1 1/2" MIN./2" MAX.4"8"8" X 8" TIMBER POST, TYP. 3" X 9 1/2" TIMBER SILL, TYP. 8" SEE A2 FOR WIDTHS 1' - 4" NEW FF -8" SEE 5/A-5 FOR TYP. DETAILS SEE LA DRAWINGS FOR PAVING DETAILS NEW FF -8" 8" 1 X 12 AZEK BOARD - FOLLOW MANUFACTURERS INSTRUCTIONS FOR ATTACHMENT TO CONCRETE - FILL ANY HOLES & PAINT TO MATCH SIDING 8"2 1/8" +/-3 1/4"SEE A2 FOR WIDTHS 1'-4" +/- SEE 7/A-5 FOR TYPICAL NOTES 1" X AZEK BOARD LET INTO SILL- ATTACH TO PVC STRAPPING - ATTACHED TO CONCRETE W/CONCRETE SCREWS 8"3"9 1/2" 3/4"1/4"1/2"8"LOCATION OF 1 X AZEK JAMB @ EACH DOORWAY - ALIGN W/FACE OF BASEBOARD INSIDE LOCATION OF 1 X AZEK JAMB @ EACH DOORWAY - ALIGN W/FACE OF CLAPBOARD/SHIPLAP OUTSIDE Scale Project number Date Drawn by Checked by As indicated A-5 BUILDING SECTIONS NORTHAMPTON HISTORIC 08-29-21 Author 3/4" = 1'-0"5 BARN - SOUTH DOOR THRESHOLD 1/4" = 1'-0"1 LONGITUDINAL SECTION LOOKING NORTH 1/4" = 1'-0"2 LONGITUDINAL SECTION LOOKING SOUTH 3/4" = 1'-0"7 DETAIL - TYPICAL FOUNDATION W/VENEER STONE 3/4" = 1'-0"6 BARN - WEST DOOR THRESHOLD 3/4" = 1'-0"3 PIER DETAIL 1 1/2" = 1'-0"4 DETAIL - SHED TO BARN WALL CONNECTION 3/4" = 1'-0"8 DETAIL - FOUNDATION WITHOUT VENEER STONE 2021-1 8 A-5