Loading...
32A-147 (8) City of Northampton Map:Lot32A-147-001 Massachusetts Date issued 08/26/2022 Inspector of Buildings Permit # BP-2022-1032 Permit Fee $60.00 SIGN PERMIT Business Address 18 MAIN ST Applicant Installer DUNN CONSTRUCTION A . s licant Installer Address 191 SOUTH ST NORTHAMPTON MA 01060 Work Description #18 MAIN - ILLUMINATED WALL SIGN- POKEMOTO Estimated Cost $12000 Building Department Approval by: Jonathan Flag . )2 . cs-11 . 7_614 File #BP-2022-I 032 APPLICANT/CONTACT PERSON:DUNN CONSTRUCTION 191 SOUTH ST NORTHAMPTON, MA 01060 PROPERTY LOCATION 16 MAIN ST #+i l2 MAP:LOT 32A-147-001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Building Permit Filled out . Fee Paid $60.00 Type of Construction: ILLUMINATED WALL SIGN -POKEMOTO) New Construction 1 U Non Structural Renovations R 1 �. Addition to Existing lJ Accessory Structure Building Plans Included: Owner/ Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required (see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay 4euv,, ,,R 5' I ': / 8 d' a- Si ture of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. City of Northampton .o ,, Massachusetts �� sL�'`�'c� io ' wr iy , N o DEPARTMENT OF BUILDING INSPECTIONS 'i ,�, ;,`�,.7r'�_- 212 Main Street •• Municipal Building yJ� �D� p, Northampton, MA 01060 ,i ��1� Application for a Permit to Place or Maintain a Sign Or other Advertising Device, or Marquee A-01 3,.)- (Application to be filled out in ink or typewritten) Number PI n m filedwith he BuildingIn RECEIVE U Erection ( X ) before a permit will be granted Alteration ( ) Repair ( ) Repainting ( ) AUG 2 2 20�2 tt,!R moval ( X ) • FEE u1 PAGE 3O�PLOT 1 '17 DEPT.OF BUILDING INSPECTIONS NORTHAMPTONj� pton, Mass. 19 August 2022 Application for a permit to place or maintain a sign or other advertising device, or marquee BUSINESS NAME Trifecta LLC 1. Location, Street and No. 18 Main Street, Northampton. MA 01060 2. Owner's name Rachapreuk(aka RJ)Schmidt 3. Owner's address 7 Garfield Avenue, Florence, MA 01062 4. Maker's name Bob Neth, Connecticut Signcraft, Inc 5. Maker's address 47 Cherry Street, Naugatuck, CT 6. Erector's name John Dunn, Dunn Construction, Inc 7. Erector's address 191 South Street, Northampton, MA 01060 SIGN KIND OF SIGN (Designate) 1. Sign will be (check one) illuminated X Non-illuminated 2. Will sign obstruct a fire escape, window or door? No Marquee 3. Lower edge will be 8 ft 2 ins above the public way. Projecting 4. Upper edge will be 12 ft 2 ins above the public way. Roof 5. Height 4 ft 0 ins Width 17 ft 0 ins Temporary 6. Face area .2 ,5.sq. ft. (Frame: 68 sq ft) Wall X 7. Inner edge will be ....1.ins from the building or pole. Ground 8. Outer edge will be ...6...ins from the building or pole. Other 9. Face of building or pole is .15.4..ins back from the street line. 10. Sign will project ...Q..ins beyond the street line. 11. Sign will extend .0 ft 0 ins above the building or pole. 12. Of what material will sign be constructed? Frame ...PVC Face...Motal 13. Estimated cost $.12.000 The undersigned certifies that the above statements are true to the best of his knowledgewl an belief. (Sig a Owner or Agent) Page 1 of 3 1\-- .0 r t lAR_Ilt O A 114��G kewo o tow; THIS FORM IS PART OF THE SIGN PERMIT APPLICATION File No. ZONING (INFORMATION PLEASE TYPE OR PRINT ALL INFORMATION 1. Name of Applicant: RJ Schmidt Address: 18 Main Street, Northampton, MA Telephone: 413-523-5555 2. Owner of Property: Wei Lam Address: 103 Rocky Hill Road, South Hadley, MA 01035 Telephone: 917-930-3288 3. Status of Applicant: Owner Contract Purchaser X Lessee Other(explain): 4. Job Location: 18 Main Street Parcel ID: Zoning Map# Parcel# District(s) (TO BE FILLED IN BY THE BUILDING DEPARTMENT) 5. Existing Use of Structure/Property: Restaurant serving Hawaiian poke style sushi. 6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary) The new channel LED sign (Pokemoto)will replace the current awning sign (Bahn Mi Spot). Dunn Construction will demolition the current awning, and install a white PVC facade/back- board to the building wall; this will serve as the sign frame. Connecticut Signcraft, Inc. will manufacture, and mount the channel LED Pokemoto sign onto the white PVC frame. 7. Attached Plans: X Sketch Plan Site Plan Engineered/Surveyed Plans 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW X YES IF YES,date issued: IF YES: Was the permit recorded at the Registry of Deeds? X NO DON'T KNOW YES IF YES: Enter: Book Page and/or Document# 9. Does the site contain a brook, body of water or wetlands? NO X DON'T KNOW YES IF YES: Has a permit been,or need to be,obtained from the Conservation Commission? Needs to be obtained Obtained , Date issued 10. Do any signs exist on the property? YES X NO IF YES:Describe the size,type and location: Current vinyl awning (supported by an inner metal frame) is 18 ft across the frontage, approx 7 ft in height, extends 6 ft from the frontage, and is located above the store frontage approx 98.5 inches from the ground. Are there any proposed changes to,or additions of,signs intended for the property? YES X NO IF YES: Describe the size,type and location: Vinyl awning will be replaced with a metal channel LED sign (32 in by 108 in), placed on a white PVC facade/backboard (4 ft in height, 17 ft in length), and located above the store frontage approx 98.5 inches from ground. Page 2 of 3 • 11. ALL INFORMATION MUST BE COMPLETED; PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION. 12. This colum to be filled in by the Building Department. Existing Proposed Required by Zoning Lot Size Frontage 18 ft 17 ft Front: Setbacks:(for sign)Side: L: R: L: R: Rear: Building Height Facade Square Footage 126 sq ft 68 sq ft #of Parking Spaces None None 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. DATE: 19 August 2022 APPLICANT'S SIGNATURE .c4.(.... NOTE: Issuance of a zoning permit does not relieve an applicant 's burden to comply with all zoning Requirements and obtain all required permits from the Board of Health, Conservation Commission, Department of Public Works and other applicable permit granting authorities. FILE# • Page 3 of 3 POKEMOTO Awning Removal and Sign Installation Current Awning and Sheetmetal Sign . " ' t,,_ :" „,''... I (.4?,. iltil to:, ,,, SPOT 1 w rtCcw..r. r - �A-Vie _ limo AEI I a—t f ,- t — tF '.a w t '''''''''''"' '' - ; ''Ikl1/4 ‘ 111 , i Proposed New Channel LED Sign 4' x 17' facade a vol:.0 / e r, V/i ' r fii/r if g 4V, A AA 4 A ..0 '. A z40) , Z i Nawallan Ooke 36 x 114.5= 28.63 sf w 41tli 4. '1 v 4" iirfariw II iiini il 1 s ,f......:. , .,_, r -fil I HI. �, , • Scope of Work 1 . Trifecta LLC intends to remove the existing "Banh Mi" awning and replaced with a "Pokemoto" channel LED sign. 2. We will coordinate this effort with the City Building Commissioner and Dept of Public Works. 3. Awning removal will start in the early morning, estimated 5 a.m., and be completed within 4 hours. • 4. On the following morning, estimated 5 a.m., a white PVC facade/backboard will be installed onto the building face, and be completed within 2 hours. 5. At a date and time determined by the sign manufacturing company, the metal channel LED sign will be installed onto the PVC facade/backboard. Method of Awning and Sheetmetal Sign Removal 1 . Coordinate "sidewalk" permit with Anne, DPW. 2. Dunn Construction will cordon off the upper sidewalk directly in front of the restaurant using "caution" tape or the like. This includes placing workhorses on the left side (Local Burger) and right side (Majestic Bar) of the frontage, leaving the lower sidewalk entirely unobstructed. „ p ' W. N � _ _ l♦ E -7'1: _-4-1`-zit--- r ;v 7 , : '.--:,--w- ir -- , , . _ it". 1 . .. r .,:, �. Enclose the entire awning area by draping heavy tarps from The inside of the metal "Banh Mi" Sign. This will prevent potential spillage of debris onto the lower sidewalk. - ,N. - , ' ' ii .4..../ - p-_,,, , i .... ...., ., I t f' i5 7-77-5,,,, - --; ( -: t!! -' • , i. . i y t E :: + i �• :, ,.` 1,. .• . 3 4. Remove the stucco exterior at the base of the awning. The stucco base will be cut into sections, which will be transported by wheel barrow, carried through the restaurant front entrance, and placed into a truck bed located at they rear in the Strong Avenue Parking Lot. This activity will expose the awning's inner metal "ribs." 5. Remove the metal "Bahn Mi" Sign, and re-drape the tarp from the awning frame. 6. Remove the inner metal ribs. The dismantled ribs will be carried through the restaurant for removal, and stored off- ite. 7. Cut away and remove the yellow vinyl awning covering. 8. Remove the upper metal ribs. The dismantled ribs will be carried through the restaurant for removal, and stored off-(site. 9. Remove the tarp, and dismantle the remaining awning frame. Method of Sign Installation 1 . After removal of the awning and frame, Dunn Construction will install onto the building a white PVC facade/backboard. 2. At a time and date determined by the sign manufacture, Connecticut SignCraft, the new Pokemoto channel LED sign will be installed onto the PVC facade/backboard.