Loading...
SURVEY-Ct River Trail-PB229-P40-concept plans PDFNEW PROPERT Y L I N EN INTERSTATE 91 65 66 67 68 69 70 71 72 73 74 75 76 77 PC +21.11 PRC +69. 7 6 PT +18.51 PC +71.78PT +92.26 PC +61.18PT +89.90 PI +32.60 PC +78.91 77+78.55WETLAND AREA FROM GIS MAPPING MIN DISTANCE NECESSARY FROM RR TRACKS (17 FT TO EDGE OF PATH) RELOCATE UTILITY POLES POTENTIAL WETLAND AREA FROM RECORD PLANS RET UTILITY POLE CITY OF NORTHAMPTON'S 20' WIDE EASEMENT PROP 10' SHARED USE PATH WITH 2' SHOULDERS NAVD 88BASE ELEV 120.00 130 140 150 160 170 180 190 120 130 140 150 160 170 180 190 152.2067+00 151.7568+00 152.01152.0169+00 150.18147.6970+00 149.01147.6371+00 147.34147.9772+00 147.97147.9873+00 147.98147.9974+00 148.74150.2475+00 150.49151.1576+00 153.05154.8877+00 156.6767+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 -2.27% 0.37% 3.90%-0.21% PVI STA = 68+82.28 PVI ELEV = 152.12 A.D. = -2.06% K = 48.66 100' VC PVC: 68+32.28ELEV: 152.22PVT: 69+32.28ELEV: 150.98575.1' SSD PVI STA = 77+46.56 PVI ELEV = 157.05 A.D. = -4.81% K = 13.08 63' VC PVC: 77+15.13ELEV: 155.82PVT: 77+77.99ELEV: 156.76256.0' SSD HIGH POINT ELEV = 156.82 HIGH POINT STA = 77+66.16 PVI STA = 70+93.16 PVI ELEV = 147.33 A.D. = 2.64% K = 37.85 100' VC PVC: 70+43.16ELEV: 148.46PVT: 71+43.16ELEV: 147.52370.5' HSD LOW POINT ELEV = 147.49 LOW POINT STA = 71+29.08 PVI STA = 75+40.06 PVI ELEV = 148.99 A.D. = 3.53% K = 28.34 100' VC PVC: 74+90.06ELEV: 148.81PVT: 75+90.06ELEV: 150.94211.1' HSD FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO.15444_HD(GEN)_CTRIVER_OPTION 1.DWG7-Mar-2022 3:19 PMPlotted onCONSTRUCTION PLAN & PROFILE 15444.00 9 10 CT RIVER TRAIL NORTHAMPTON - NE W P R O P E R T Y L I N E 1 ARO 1 ARO N INTERSTATE 91 RIVER RUN 75 76 77PC + 7 8 . 9 1 77+78.55END PROP SHARED USE PATH AT DRIVE ADD SHARED LANE MARKINGS EVERY 150' AND MUTCD R4-11 SIGNS (BIKES MAY USE FULL LANE) PROP TRAILHEAD WITH AMENITIES (SIGNAGE, BENCHES , BIKE RACKS, ETC.) N RIVER RUN ADD SHARED LANE MARKINGS EVERY 150' AND MUTCD R4-11 SIGNS (BIKES MAY USE FULL LANE) FUTURE DAMON ROAD 10' SHARED USE PATH FUTURE CROSSWALK BUILT UNDER DAMON ROAD SHARED USE PATH PROJECT. CROSSING INCLUDES A PED HYBRID BEACON/HAWK SYSTEM FED. AID PROJ. NO.SHEETNO.TOTAL SHEETSSTATE MA PROJECT FILE NO.15444_HD(GEN)_CTRIVER_OPTION 1.DWG15-Mar-2022 1:22 PMPlotted onCONSTRUCTION PLAN 15444.00 10 10 CT RIVER TRAIL NORTHAMPTON -