SURVEY-Ct River Trail-PB229-P40-concept plans PDFNEW PROPERT
Y
L
I
N
EN
INTERSTATE 91
65
66
67
68
69 70 71 72
73
74
75
76
77
PC +21.11
PRC +69.
7
6 PT +18.51
PC +71.78PT +92.26 PC +61.18PT +89.90
PI +32.60
PC +78.91 77+78.55WETLAND AREA
FROM GIS MAPPING
MIN DISTANCE NECESSARY
FROM RR TRACKS (17 FT TO
EDGE OF PATH)
RELOCATE
UTILITY POLES
POTENTIAL WETLAND AREA
FROM RECORD PLANS
RET UTILITY
POLE
CITY OF NORTHAMPTON'S
20' WIDE EASEMENT
PROP 10' SHARED USE PATH
WITH 2' SHOULDERS
NAVD 88BASE ELEV
120.00
130
140
150
160
170
180
190
120
130
140
150
160
170
180
190
152.2067+00 151.7568+00 152.01152.0169+00 150.18147.6970+00 149.01147.6371+00 147.34147.9772+00 147.97147.9873+00 147.98147.9974+00 148.74150.2475+00 150.49151.1576+00 153.05154.8877+00 156.6767+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00
-2.27%
0.37%
3.90%-0.21%
PVI STA = 68+82.28
PVI ELEV = 152.12
A.D. = -2.06%
K = 48.66
100' VC
PVC: 68+32.28ELEV: 152.22PVT: 69+32.28ELEV: 150.98575.1' SSD
PVI STA = 77+46.56
PVI ELEV = 157.05
A.D. = -4.81%
K = 13.08
63' VC
PVC: 77+15.13ELEV: 155.82PVT: 77+77.99ELEV: 156.76256.0' SSD
HIGH POINT ELEV = 156.82
HIGH POINT STA = 77+66.16
PVI STA = 70+93.16
PVI ELEV = 147.33
A.D. = 2.64%
K = 37.85
100' VC
PVC: 70+43.16ELEV: 148.46PVT: 71+43.16ELEV: 147.52370.5' HSD
LOW POINT ELEV = 147.49
LOW POINT STA = 71+29.08 PVI STA = 75+40.06
PVI ELEV = 148.99
A.D. = 3.53%
K = 28.34
100' VC
PVC: 74+90.06ELEV: 148.81PVT: 75+90.06ELEV: 150.94211.1' HSD
FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.15444_HD(GEN)_CTRIVER_OPTION 1.DWG7-Mar-2022 3:19 PMPlotted onCONSTRUCTION PLAN & PROFILE
15444.00
9 10
CT RIVER TRAIL
NORTHAMPTON
-
NE
W
P
R
O
P
E
R
T
Y
L
I
N
E
1 ARO
1 ARO
N
INTERSTATE 91
RIVER RUN
75
76
77PC +
7
8
.
9
1 77+78.55END PROP
SHARED USE
PATH AT DRIVE
ADD SHARED LANE
MARKINGS EVERY 150' AND
MUTCD R4-11 SIGNS (BIKES
MAY USE FULL LANE)
PROP TRAILHEAD
WITH AMENITIES
(SIGNAGE, BENCHES ,
BIKE RACKS, ETC.)
N
RIVER RUN
ADD SHARED LANE
MARKINGS EVERY 150' AND
MUTCD R4-11 SIGNS (BIKES
MAY USE FULL LANE)
FUTURE DAMON ROAD
10' SHARED USE PATH
FUTURE CROSSWALK BUILT UNDER
DAMON ROAD SHARED USE PATH
PROJECT. CROSSING INCLUDES A
PED HYBRID BEACON/HAWK SYSTEM
FED. AID PROJ. NO.SHEETNO.TOTAL
SHEETSSTATE
MA
PROJECT FILE NO.15444_HD(GEN)_CTRIVER_OPTION 1.DWG15-Mar-2022 1:22 PMPlotted onCONSTRUCTION PLAN
15444.00
10 10
CT RIVER TRAIL
NORTHAMPTON
-