Loading...
BUSHEY, MATTHEW - UPDATED SOLAR PLANS 07/01/2022INSTALLATION OF NEW ROOF MOUNTED PV SOLAR SYSTEM 984 PARK HILL ROAD NORTHAMPTON, MA 01062 42.288522,-72.713352 PARK HILL ROAD R2 SYSTEM SIZE INCREASE / TRENCH 6/30/2022 R1 REMOVE P METER 3/9/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 2/9/2022 NO.DESCRIPTION DATE BUSHEY, MATTHEW- TRINITY ACCT #: 2022-01-664504 984 PARK HILL ROAD NORTHAMPTON, MA 01062 42.288522,-72.713352 PROPOSED PV SOLAR SYSTEM DRAWING DATE:2/9/2022 DRAWN BY:MD REVISED BY:DMR DC SYSTEM SIZE:13.2kW AC SYSTEM SIZE:10kW MODULE COUNT:33 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10+ 400 UTILITY COMPANY:NAT'L GRID UTILITY ACCT #:2652151027 UTILITY METER #:23593245 DEAL TYPE:SUNNOVA R2 R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com ROOF 1 MODULES: 14 PITCH: 20 ORIENTATION: 174 ROOF 2 MODULES: 0 PITCH: 20° ORIENTATION: 354° ROOF 3 MODULES: 19 PITCH: 20 ORIENTATION: 174 ROOF 4 MODULES: 0 PITCH: 18° ORIENTATION: 174° ROOF 5 MODULES: 0 PITCH: 20° ORIENTATION: 354° ROOF 6 MODULES: 0 PITCH: 20° ORIENTATION: 354° D DC ep M DC AC NS270901352 2 5 4531542.288522,-72.713352 33 HANWHA 400 (Q.PEAK DUO BLK ML-G10+ 400) 1 SE10000H-US0SHBNC4 INSIDE OUTSIDE. OUTSIDE (UTILITY ACCESSIBLE)OUTSIDE. R2 SYSTEM SIZE INCREASE / TRENCH 6/30/2022 R1 REMOVE P METER 3/9/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 2/9/2022 NO.DESCRIPTION DATE BUSHEY, MATTHEW- TRINITY ACCT #: 2022-01-664504 984 PARK HILL ROAD NORTHAMPTON, MA 01062 42.288522,-72.713352 PROPOSED PV SOLAR SYSTEM DRAWING DATE:2/9/2022 DRAWN BY:MD REVISED BY:DMR DC SYSTEM SIZE:13.2kW AC SYSTEM SIZE:10kW MODULE COUNT:33 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10+ 400 UTILITY COMPANY:NAT'L GRID UTILITY ACCT #:2652151027 UTILITY METER #:23593245 DEAL TYPE:SUNNOVA R2 NOTES: 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.) 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. M UD SP P DC AC ep D DC R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com SD TS CALCULATIONS FOR CURRENT CARRYING CONDUCTORS REQUIRED CONDUCTOR AMPACITY PER STRING [NEC 690.8(B)(1)]: (15.00*1.25)1 = 18.75A AWG #10, DERATED AMPACITY AMBIENT TEMP: 33°C, TEMP DERATING FACTOR: .96 RACEWAY DERATING = 6 CCC: 0.80 (40*.96)0.80 = 30.72A 30.72A >_ 18.75A, THEREFORE WIRE SIZE IS VALID TOTAL AC REQUIRED CONDUCTOR AMPACITY 42.00A*1.25 = 52.50A AWG #6, DERATED AMPACITYAMBIENT TEMP: 30°C, TEMP DERATING: 1.0 RACEWAY DERATING <_ 3 CCC: N/A 75A*1.0 = 75A 75A >_ 52.50A, THEREFORE AC WIRE SIZE IS VALID CALCULATION FOR PV OVERCURRENT PROTECTION TOTAL INVERTER CURRENT: 42.00A 42.00A*1.25 = 52.50A --> 60A OVERCURRENT PROTECTION IS VALID ARRAY CIRCUIT WIRING NOTES1.) LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITYFOR DETERMINING ONSITE CONDITIONS ANDEXECUTING INSTALLATION IN ACCORDANCE WITHNEC 2020 2.) LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP = -16°C 3.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP = 33°C 4.) 2005 ASHRAE FUNDAMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1°C). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47°C OR LESS (ALL OF UNITED STATES) 5.) PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGSSHALL INCLUDE A RAPID SHUTDOWN FUNCTION THATCONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH NEC 690.12(A) THROUGH (D) 6.) PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER NEC 690.41 (A)(4) 7.) UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED WITH THE FOLLOWING OUTER FINISH: POSITIVE CONDUCTORS = RED NEGATIVE CONDUCTORS = BLACK NEC 210.5(C)(2) 8.) ARRAY AND SUB ARRAY CONDUCTORS SHALL BE #10 PV WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT SUNLIGHT. SUB ARRAY CONDUIT LONGER THAN 24” SHALL CONTAIN ≤ 20 CURRENT CARYING CONDUCTORS AND WHERE EXPOSED TO DIRECT SUNLIGHT SHALL CONTAIN ≤ 9 CURRENT CARRYING CONDUCTORS. 9.) ALL WIRE LENGTHS SHALL BE LESS THAN 100' UNLESS OTHERWISE NOTED 10.) FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON ROOFTOP AND SHALL BE LIMITED TO 12” IF USED OUTDOORS 11.)OVERCURRENT PROTECTION FOR CONDUCTORS CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BELOCATED WITHIN 10' OF THE POINT OF CONNECTION NEC690.9(A)(3)(2) 12.) WHERE TWO SOURCES FEED A BUSSBAR, ONE A UTILITY AND THE OTHER AN INVERTER, PV BACKFEED BREAKER(S) SHALL BE LOCATED OPPOSITE FROM UTILITY NEC 705.12(B)(3)(2) 13.) ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY GENERATION CIRCUITS AND NO UNUSED POSITIONS OR LOADS 14.) ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE A NEMA 3R RATING LOCKABLE 60A DISCONNECT FUSED W/ 60A FUSES SQUARE D PN: D222NRB ISOLATED NEUTRAL 240V 1Ø NEUTRALEXISTING MAIN BREAKER LOAD CENTER INSULATED LINE TAPS INSTALLED ON MAIN FEEDERS NEC 705.12(A) M 2p100AMAIN240V 1Ø 100A MAIN BREAKER 100A BUSBAR EXISTING 1Ø 120/240V UTILITY METER INVERTER #1 - SE10000H-US0SHBNC4 DC AC Imp 27 Pout 10000 Vmp 400 Imax 42 Voc 480 OCPDmin 52.5 Isc 45 Vnom 240 PV MODULE SPECIFICATIONS HANWHA 400 (Q.PEAK DUO BLK ML-G10+ 400) Imp 10.77 Vmp 37.13 Voc 45.3 Isc 11.14 EG NOTE: INTERNAL REVENUE GRADE MONITORING CONTAINED WITHIN SOLAR EDGE INVERTER SOLAR EDGE PN. RWND-3D-240-MB A #6 THWN-2 GEC TO EXISTING GROUND ROD G 3/4'' CONDUIT W/ 2-#6 THWN-2, 1-#6 THWN-2, 1-#8 THWN-2 GROUND B 3/4'' CONDUIT W/ 2-#10 THWN-2, 1-#10 THWN-2 GROUND H 1" PVC W/ 2-#10 THWN-2, 1-#10 THWN-2 GROUND (TRENCHED APPROX. 15') C 3/4'' CONDUIT W/ 6-#10 THWN-2, 1-#10 THWN-2 GROUND D 3/4'' CONDUIT W/ 4-#10 THWN-2, 1-#10 THWN-2 GROUND E 3/4'' CONDUIT W/ 2-#6 THWN-2, 1-#10 THWN-2, 1-#10 THWN-2 GROUND F #10 PV WIRE (FREE AIR) W/ #6 BARE COPPER BOND TO ARRAY NOTE: CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR TO MEET OR EXCEED NEC AND LOCAL AHJD REQUIREMENTS INVERTER #1 PV+L1 L2 N PV-C f f SOLAR MODULES MOUNTED TO ROOF ON 2 ARRAYS 33 - 400W MODULES W/ 1 SOLAR EDGE P401 PER MODULE 15 ADC MAX PER STRING [TOTAL] 1 STRING OF 10 MODULES IN SERIES - 400 Vmax 1 STRING OF 9 MODULES IN SERIES - 400 Vmax 1 STRING OF 14 MODULES IN SERIES - 400 Vmax *3 STRINGS TO BE TERMINATED IN PARALLEL INSIDE INVERTER 1 [DWELLING] 1 STRING OF 10 MODULES IN SERIES - 400 Vmax 1 STRING OF 9 MODULES IN SERIES - 400 Vmax [DETACHED GARAGE] 1 STRING OF 14 MODULES IN SERIES - 400 Vmax 8"x8" JUNCTION BOX 8"x8" JUNCTION BOX DC DISCONNECT B D H 6"x6" JUNCTION BOX R2 SYSTEM SIZE INCREASE / TRENCH 6/30/2022 R1 REMOVE P METER 3/9/2022 P1 ISSUED TO TOWNSHIP FOR PERMIT 2/9/2022 NO.DESCRIPTION DATE BUSHEY, MATTHEW- TRINITY ACCT #: 2022-01-664504 984 PARK HILL ROAD NORTHAMPTON, MA 01062 42.288522,-72.713352 PROPOSED PV SOLAR SYSTEM DRAWING DATE:2/9/2022 DRAWN BY:MD REVISED BY:DMR DC SYSTEM SIZE:13.2kW AC SYSTEM SIZE:10kW MODULE COUNT:33 MODULES USED:HANWHA 400 MODULE SPEC #:Q.PEAK DUO BLK ML-G10+ 400 UTILITY COMPANY:NAT'L GRID UTILITY ACCT #:2652151027 UTILITY METER #:23593245 DEAL TYPE:SUNNOVA R2 R 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com JOB NAME:BUSHEY, MATTHEW- ADDRESS:984 Park Hill Road Northampton, MA 01062 42.288522,-72.713352 71.885 ESTIMATED PERSONNEL HOURS 3 DAYS 2.25 DAYS 1.5 DAYS •33 HANWHA 400's (13.2KW)(CREW OF 3)(CREW OF 4)(CREW OF 6) •2 SEPARATE ARRAYS •18' PEAK TO GROUND •33 PORTRAIT & 0 LANDSCAPED •1 INVERTERS INSTALLED OUTSIDE •15' TRENCH ESTIMATED SENT TO JOB USED □HANWHA 400 (Q.PEAK DUO BLK ML-G10+ 400)33 ______ □P401 SE OPTIMIZERS 33 ______ □SE10000H-US0SHBNC4 1 ______ □60A OUTDOOR FUSED DISCONNECT W/ (2) 60A FUSES 1 ______ □60A OUTDOOR NON-FUSED DISCONNECT 1 ______ □SOLADECK BOX(ES) & HAYCO CONNECTOR(S)2 ______ □PV LEAD WIRE 150'______ □INSULATED BUG BITES (LINE TAPS)2 ______ □CASE(S) OF BLACK SPRAY PAINT 1 ______ □CASE(S) OF TAR 1 ______ □ECOFASTEN 2012021 CF STD RAIL MLL AL 165.4 19 ______ □ECOFASTEN 2012013 CF RAIL SPLICE 13 ______ □ECOFASTEN 2099017 CF END CLAMP 32MM BLK 20 ______ □ECOFASTEN 2099022 CF MID CLAMP SHORT BLK 56 ______ □ECOFASTEN 4011011 MODULE JUMPER 3 ______ □GROUNDING LUG (NOT PROVIDED BY ECOFASTEN)2 ______ □ECOFASTEN 2012022 CF UNIV L-FOOT MLL 3 70 ______ □ECOFASTEN 3012020 GF-1 FLASHING GLV BLK 8 x 10 70 ______ □ECOFASTEN 2012019 CF MLPE MOUNT 33 ______ □ECOFASTEN 2012020 CF WIRE MGMT CLIP 33 ______ □ECOFASTEN 2012024 CF END CAP 20 ______ MATERIAL LIST R(FOR INTERNAL USE ONLY) 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com INSTALLATION OF NEW ROOF MOUNTED PV SOLAR SYSTEM 984 PARK HILL ROAD BUSHEY, MATTHEW- 984 PARK HILL ROAD NORTHAMPTON, MA 01062 42.288522,-72.713352 R APPENDIX CONTENTS LABELS, STICKERS, AND PLACARDS EQUIPMENT DATA SHEETS 2211 Allenwood Road Wall, New Jersey 07719 877-786-7283 www.Trinity-Solar.com