02. Property Owner Contact Diary-SRTS-6-1-22Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Susan McEvoy
117 North Street
Northampton, MA 01060
Mohamed Basel
117 North Street (13556, 76)
Easement(s): E-1, TE-1
Date Federal Aid Guide for Property Owners was given to the Property Owner:
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail –
Return Receipt
11/30/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting. Sent
each owner Letter of Intent with their own address, parcel ID's
being affected, sq. footage of any easement, how the project
may affect them, and summary of the donation process. Also
included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail –
Return Receipt
12/8/21 Susan left voicmail regarding being the current owner. Keith
Benoit called back, acknowledged new ownership and
answered all questions Susan had regarding construction and
project timelines.
Voicemail Phone
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
1/4/22 Susan McEvoy left message at office that she would like to
schedule an appt. for 1/12/22.
Susan McEvoy
413.221.6588
1/10/22 JF returned call. Left message with detail of times I will be
available.
Susan McEvoy
413.221.6588
1/12/22 JF met with Susan McEvoy at property. Discussed project, no
outstanding issues.
Physical meeting
Outreach and meetings from Crowley Associates- see separate contact diary in their appraisals
2/18/22 Formal notice of offer and notice of upcoming takings before
City Council
Certified mail
5/18/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Patricia M. Kingston
86 Parsons Street
Northampton, MA 01060
86 Parsons Street (3718, 230)
Easement(s): TE-2
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail –
Return Receipt
8/6/21 Owner called to inquire on project details regarding ROW and
removal of hedges. Explained the process and possible impacts
to her plants.
Phone
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/18/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project – Safe Routes
to School
609515
Property Owner(s): Property Address: Deed:
Erik W. Cheries
36 Highland Ave
Northampton, MA 01060
36 Highland Ave (13320, 183)
Easement(s): E-2, TE-4
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
2/7/21 Received email from Wayne Feiden who was responding to
Erik's email to Jim Nash regarding the project. Erik asked to
have a meeting with us to discuss the project.
Email
2/7/21 Wayne Feiden answered some questions via email regarding
the project, how our office involved, and what different levels of
design mean for MassDOT.
Email
2/8/21 City Counsilor Jim Nash replied thank you and would be willing
to join any meetings we have on the subject.
Email
2/8/21 Erik Cheries said he would be happy to have a meeting with us
Zoom to discuss further.
Email
2/11/21 Wayne Feiden offered a few times to meet. Email
2/12/21 I replied back with my availability. Email
2/15/21 Erik replied that Feb. 15th works for him. Email
2/16/21 I confirmed that I would be present. Email
2/25/21 Met with Erik Cheries over Zoom with Wayne Feiden to discuss
the project, specifics of his property (like the trees and shrubs),
and timelines for the project.
Zoom
2/25/21 Wayne messaged Erik regarding the timelines and the designs
of the project.
Email
2/25/21 Erik thanked Wayne for sharing. Email
5/6/21 Erik asked if we would be available for a site visit. Email
5/6/21 I replied that I would be available the following day. Email
5/6/21 Erik replied that that would work. Email
11/29/21 Emailed Erik to inquire about donation certificate Email
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
2/22/22 Delivery unclaimed Post Office report
2/28/22 Deliver unclaimed Post Office report
3/9/22 Post Office returns mail Post Office report
3/15/22 Certified letter returned to Planning , City of Northampton Mail
3/15/22 Email to Eric Cheries- summarizing letter. Offer to hand deliver Email-echeries@umass.edu
5/16,
5/17, 5/25
Email exchange from Eric Cheries who never claimed certified
letter, sharing same information and getting W9
Mail
5/18/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Jenny M. (formerly Hein) Morrison
WAS: PO BOX 833
Northampton, MA 01061
NOW: PO Box 117
Whately, MA 01093
37 Highland Ave (8104, 85)
(8104, 185)
Easement(s): E-3, TE-5
Date Federal Aid Guide for Property Owners was given to the Property Owner: 12/27/21
June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail – Return Receipt
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/21/21 Telephone call from Jenny Hein with questions on project. JF
researched the details, returned call left message
413.695.8321
12/24/21 Receipt of certified mail delivered Mail
12/27/21 JF returned call second time to Jenny Hein. Discussed project.
Will email enlarged copy of plan of E-3 and TE-5. Jenny Hein
also has question for City regarding high water table near her
property, which she has received communication from the City
about in the past – unrelated to this project. JF agreed to put J
Hein together in an email to Wayne Feiden to discuss the water
issue.
Telephone 413.695.8321.
Email provided
heyref4@gmail.com & email
communication also
completed re: plans
12/28/21 Response email from Jenny Hein, closing out outstanding
issues. JF also responded
Email
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/18/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Donald R. Dion
PO BOX 656
Hadley, MA 01035
22 Linden Street (1629, 227)
Easement(s): TE-6
Date Federal Aid Guide for Property Owners was given to the Property Owner: 6/9/21 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail – Return Receipt
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/30/21 Receipt of certified mail delivered Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/18/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Stephana Soitos
7 Dwight Street
Watertown, MA 02472
Stephan Soitos (life estate holder)
17 Linden Street
Northampton, MA 01060
17 Linden Street (13938, 170)
(13938, 171)
Easement(s): E-4 (273 sq ft.), TE-7 (681 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/10/21 Received email from Stefana asking for related links to the June
2nd meeting. Responded affirmatively & sent links
Email
5/10/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
5/13/21 Met with several property owners to discuss the SRTS project
overall and answer any questions that they had in particular.
Stephen asked questions that I would have to get back with
regarding curb cuts.
Site Visit
5/14/21 Sent answers to Stefana Soitos regarding questions per convo. Email
5/14/21 Sent answers to questions that her father, Stephen Soitos had
so that she could pass on to him.
Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail –
Return Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
12/17/21 Written letter mailed to Stephana Sotios from appraiser
indicating we are appraising, inspecting, offered opportunity to
meet.
Certified Mail
12/17/21 Written letter mailed to Stephen Sotios (Assessor’s records tax
payer) from appraiser indicating we are appraising, inspecting,
offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
12/24/21 Receipt of certified mail delivered Mail
12/27/21 Phone message from Stephen Soitos requesting meeting. JF
responded by telephone, left message to verify meeting
scheduled for Wed. 1/12/22, 12 noon
Telephone Stephen Soitos
413.586.7800
12/30/21 Met with S Soitos while general inspection of the neighborhood
and properties and taking photos. Discussed project. Need to
provide answer to why the PE is being taken, and would like to
request to remove hedge row on Parsons Ave. Will follow up
with W Feiden and S Soitos on 1/3/22.
Personal meeting
1/3/22 JF telephoned S Soitos re: outstanding questions on PE and
hedge row. Left message to return call
Telephone Stephen Soitos
413.586.7800
1/10/22 S Soitos returned call, further discussion of project, PE limits,
and hedge row. Keeping 1/12/22 noon appt. at his property.
Telephone Stephen Soitos
413.586.7800
1/12/22 JF met again with S Soitos at property. Discussed project. No
outstanding issues.
Physical meeting
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
3/11/22 Stephana Soitos requested final check to go to her at 7 Dwight
Street address, above. Sent W9 to be completed
Email
3/20/22 Stephan Soitos reports that she will mail in a W9 and asked
when we expect that we will actually cut checks.
Email
5/18/22 Notice of Acquisition Mail
5/20/22 Check sent Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
WAS: Edward & Jean Michalowski
44 Dwight Street
Hatfield, MA 01038
NOW:
1. Deborah J. Laprade, c/o Thomas
F. LapParade, 38 Dwight Street,
Hatfield, MA 01038
2. Karen M. Bridges, 44 Dwight
Street, Hatfield, MA 01038
3. Sharon L. Hill, 6536 Yankee
Road, Liberty Township, OH 45044
4. Linda J. Scarsella, (personal
representative) 1756 Stoney Creek
Court, Valpraiso, IN 46385
34 Parsons Street (1809, 105)
(1801, 49)
Easement(s): E-5, TE-8
Date Federal Aid Guide for Property Owners was given to the Property Owner: 1/10/21
June 9, 2021 (mailed)
Edward and Jean Michalowski - 11/30/2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/12/21 Received email requesting a site visit. I replied that we had a
site visit planned and she could join. Attached designs, fed,
guide, and DOT Notice.
Email
5/13/21 Met with several property owners to discuss the SRTS project
overall and answer any questions that they had in particular.
Karen Bridges asked questions that I would have to get back
with
Site visit
5/13/21 Sent MassDOT meeting link to all property owners that I had
email address for.
Email
6/1/21 Emailed answers back from MassDOT regarding Karen Bridge's
property.
Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail – Return Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
7/1/21 Letter of Intent returned – deceased (Deborah Laprade) Mail
11/29/21 Owner (Deborah Laprade) is deceased, new owners
established. All communication has stopped.
N/A
11/30/21 Sent each owner (Edward and Jean Michalowski) notice of
project, overview of project, link to a copy of fed. guide and
notice of the MassDOT meeting. Sent each owner Letter of
Intent with their own address, parcel ID's being affected, sq.
footage of any easement, how the project may affect them, and
summary of the donation process. Also included, a pre-filled
Donation Certificate for each property owner and a paper copy
of the fed. guide for homeowners.
USPS Certified Mail –
Return Receipt
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/20/21 Phone call from Karen Bridges, daughter of Property Owners
(above), who reports they are deceased, however, there is no
legal recorded documents to direct us to that. No further action
by us, as we are using the tax payer communication address.
K Bridges 413.250.9433
1/10/21 JF called Karen Bridges to obtain the property contact for
communication, including legal communication with the City.
Estate administer is sister Lisa Scarsella, JF was provided with
name and address, which will be used on appraisal docs and JC
report. JF emailed Karen Bridges copy of plan excerpt for
informational purposes.
K Bridges 413.250.9433
email
karenbr7356@aol.com
1/11/21 Phone call from Karen Bridges re: curb cut at front of property.
Wants access to garage and gravel area adjacent to garage. JF
emailed Wayne Feiden with details, to obtain clarification on
where curb edge starts and ends. Will respond
K Bridges 413.250.9433
1/12/22 JF met with Karen Bridges, one of the representatives of the
owners at the property. They now want to be sure that there is
no curb at the existing gravel driveway area. The owners will
not need a curb cut in front of the garage, just where the gravel
drive is located adjacent to the garage. JF will ask W. Feiden
where the curb cut(s) are proposed to be, and if the design can
accommodate a curb cut to the gravel drive. JF will then report
back to K. Bridges by phone and/or email.
Physical meeting at property
1/13/22
1/28/22
JF emailed W Feiden with owner issues/ questions.
W Feiden forwarded to TEC (Designer) by email
Email
2/1/22 V Kevin Dandrade of TEC (Designer) responded by email
(“red”). JF emailed Karen Bridges to provide designer’s
response. 34 Parsons Street, E5, TE8. I emailed you
previously on this. Karen Bridges, one of the representatives of
the owners met with me and they now want to be sure that there
is no curb at the existing gravel driveway area. The owners will
not need a curb cut in front of the garage, just where the gravel
drive is located adjacent to the garage. I cannot tell from the
plan where the curb cut(s) are proposed to be. Due to the
elevation of the garage doorways that face Parsons Street and
the existing gutter line elevation in the street, we need to
propose a curb cut anyway to avoid the potential to impound
water behind a taller curb/sidewalk. This way the area will freely
drain toward the roadway like it does today.
Email
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
3/4/22 Thomas Laparade- wanted to understand status of project Phone call
3/7/22 Linda J. Scarsella: ‘I am parents’ executor. Send check to me at
1756 Stoney Creek Court, Valpraiso, IN 46385” (219-242-
3960), vuscarsella@gmail.com
Email and phone call
5/18/22 Notice of Acquisition Mail
5/20/22 Check sent Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project – Safe Routes
to School
609515
Property Owner(s): Property Address: Deed:
James L. Podolak
PO BOX 387
Northampton, MA 01061
60 Walnut Street (7611, 15)
Easement(s): E-6, TE-9
Date Federal Aid Guide for Property Owners was given to the Property Owner: 12/27/21
6/9/21 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail - Return
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
12/27/21 Email from James Polodak requesting meeting. Responded by
email. Confirmed Wed 1/5/22, 11am
Email. bwbcwi@aol.com
1/3/22 JF emailed necessity to reschedule appt. for 1/5. Suggested
same time on 1/12/22
Email. bwbcwi@aol.com
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Dana L. Gillette
168 Chestnut St
Florence, MA 01062
24 Parsons Street (9500, 351)
Easement(s): E-7, TE-10
Date Federal Aid Guide for Property Owners was given to the Property Owner: 6/9/21 (mailed); 1/11/22
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/6/21 Received voicemail from Dana Gillette wanting to know more. I
tried to call back.
Phone
5/6/21 Received email asking for link to meeting an an on site visit. I
replied back that her phone # she gave me did not work and
that I could meet in person and that the link is not published yet.
She replied that her and neighbor Megan Rubiner-Zinn could
attend meeting on May 13th.
Email
5/13/21 Sent MassDOT meeting link to all property owners that I
had email addresses for. Dana Gillette responded to ask
what time the meeting started, I replied back 7pm.
Email
5/13/21 Met with several property owners to discuss the SRTS project
overall and answer any questions that they had in particular.
Dana Gillette asked questions that I would have to get back with
Site Visit
6/1/21 Emailed answers back from MassDOT regarding Dana Gillette's
property.
Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail - Return
6/28/21 Sent link to all property owners with email the recording link. Email
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
1/4/22 Dana Gillette emailed to schedule appt. JF responded with
available dates and times.
Dana
Gillette dana.gillette@gmail.
com
1/10/22 JF emailed D Gillette again to schedule. Email
1/11/2022 Phone message to arrange appt. from D Gillette. JF returned
call left message, JF also emailed again, offering appt.
times/dates. Scheduled for 9am at property.
Dana Gillette 413.563.9978
1/12/22 JF met with D. Gillette at property. Discussed project.
Outstanding questions are status of the retaining wall which is in
the TE area, and the lowest stair(s) to porch also in TE area. JF
to communicate with Wayne Feiden for answers and report
back to D. Gillette by telephone and/or email.
Physical meeting at property
1/13/22
1/28/22
JF emailed W Feiden with owner issues/ questions.
W Feiden forwarded to TEC (Designer) by email
Email
2/1/22 Kevin Dandrade of TEC (Designer) responded by email (“red”).
JF forwarded response to D Gillette by email. 24 Parsons
Street, E7, TE10. Dana Gillette would like to know how the
concrete curbing/retaining wall adjacent to her hedges, which
looks to be right along the common line of the E & TE is being
handled during construction. She would also like to know the
plan for the bottom stair(s) to the porch, which are either in the
TE area or on the line of the E & TE. We are proposing a new
vertical granite back-curb that will provide a similar feature
between the back of the proposed sidewalk and the private
landscape area behind it. We specify the removal of the hedge
because it will be difficult to excavate the existing concrete curb
and replace it otherwise. We are not proposing any
modifications to the lowest stair; the proposed features will
come up to meet it.
Email
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project – Safe Routes
to School
609515
Property Owner(s): Property Address: Deed:
Frederick C. Zinn & Megan E.
Rubiner-Zinn
72 Cherry St
Northampton, MA 01060
72 Cherry Street (5687, 97)
(5697, 97)
Easement(s): E-8, TE-11
Date Federal Aid Guide for Property Owners was given to the Property Owner: 12/29/21
6/9/21 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/6/21 Received email from Dana Gillette that Megan Rubiner-Zinn
was CC'd on to confirm May 13 site visit. Megan replied
affirmative.
Email
5/13/21 Met with several property owners to discuss the SRTS project
overall and answer any questions that they had in particular.
Site Visit
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail – Return Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
12/29/21 Email from Megan and Fred Zinn requesting appt. to meet on
Wed 1/5/22. JF responded with 10:30am appt. time at their
property
Email Megan Rubiner
Zinn <mrzinn@usa.net
1/3/2022 JF emailed necessity to reschedule appt. for 1/5. Suggested
same time on 1/12/22. Also left phone message
Email Megan Rubiner
Zinn <mrzinn@usa.net,
phone 413 539 7165
1/3/2022 Megan Zinn responded by email confirming 1/12/22, 10:30am Email Megan Rubiner
Zinn <mrzinn@usa.net,
phone 413 539 7165
1/12/22 JF met with Megan and Fred Zinn at the property. The Zinns are
concerned that some natural rocks they have created a rock
garden with, will have to be moved during construction. They
would like the same natural rocks re- placed as near as possible
to where they currently are. So, the contractor would have to
stack and store the existing natural rocks, and then place them
back after the construction work is complete. The rock garden
is just east of the driveway in the TE area. I am familiar with
like-kind improvements installed when the property owner's land
is disturbed, but I did not have the answer to whether the
contractors can move, stack, and re-place down these rocks on
private property. JF to obtain answer to this issue from Wayne
Feiden and report back via phone or email.
Physical meeting
1/13/22
1/28/22
JF emailed W Feiden with owner issues.
W Feiden forwarded email to TEC (Designer)
Email
2/1/22 Kevin Dardane of TEC (Designer) provided response (“red”). JF
forwarded to Megan Zinn by email. 72 Cherry Street, E8,
TE11. Megan and Fred Zinn are concerned that some natural
rocks they have created a rock garden with, will have to be
moved during construction. They would like the same natural
rocks re- placed as near as possible to where they currently
are. So, the contractor would have to stack and store the
existing natural rocks, and then place them back after the
construction work is complete. The rock garden is just east of
the driveway in the TE area. I am familiar with like-kind
improvements installed when the property owner's land is
disturbed, but I did not have the answer to whether the
contractors can move, stack, and re-place down these rocks on
private property. We can specify that the field stones for the
short wall be stacked on-site near the project limits for the
property owner to restack. Based on our work limits near the
ADA ramp that crosses Cherry Street, there will be about 9 feet
of wall affected. The work limits end approximately 17 feet east
of the owner’s Cherry Street walkway. The compensation for
the temporary easement should account for those temporary
impacts.
Email
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
3/4/22 Megan Rubiner Zinn- what are next steps. Explained next steps,
thank you.
Emails
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project - Safe Routes to
School
609515
Property Owner(s): Property Address: Deed:
Richard D. Lloyd & Binda Colebrook
71 Cherry St
Northampton, MA 01060
71 Cherry Street, Northampton, MA
01060
(11659, 28)
Easement(s): E-9, TE-12
Date Federal Aid Guide for Property Owners was given to the Property Owner: 6/18/21
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/10/21 Received email from Binda Colebrook wanting to know more
about the project and proposing a time to meet. I proposed that
Thursday at 2pm as Neighbors were already meeting
Email
5/11/21 Binda Colebrook informed me that she could not attend but that
her husband, Richard Lloyd would be able to
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
6/2/21 Sent all reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/6/21 Received email from Binda Colebrook asking for a recording of
the MassDOT public hearing because she was not able to
attend.
Email
6/7/21 I replied that I asked MassDOT for the link of recording Email
6/8/21 She thanked me for response Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
6/18/21 Signed Certificates of Donation (6/18/21)- Lloyd and Colebrook Mail
2/18/22 Formal thanks for donation and notice of upcoming takings
before City Council
Certified mail
3/2/22 Can we send her the full plans (sent plans to
AppleSeedBinda@Verizon.net)
Email
3/4/22 Binda Colebrook called with questions on specifics of design
(tree and fence- staying). Emailed thanking for plan set
Call (917-213-7197, work)
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Kevin C. & Jovita B. Netto
90 Southampton Rd
Westhampton, MA 01027
14 Parsons Street (2978, 97)
Easement(s): TE-13
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
Receipt of certified mail delivered Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
3/3/22 Jovita Netto called with questions about maintenance of existing
driveway
Call
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project – Safe Routes
to School
609515
Property Owner(s): Property Address: Deed:
Joseph F. Panzica & Christopher A.
Panzica & Edward M. Panzica
6760 Greenbier Dr
Largo, FL 33777
10 Parsons Street (10003, 154)
Easement(s): TE-14 / 248 sq ft.
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/12/21 Received email from Edward Panzica asking for links to the
documents from the April 27 letter. I replied that I could & asked
for emails for his two brothers. Sent along attachments.
Email
5/12/21 Received email from Edward Panzica with Christopher Panzica
email address. I forwarded all relevant documents and links to
Christopher Panzica's email. He thanked me via email.
Email
5/12/21 Sent all attachments to Mr. Panzica after getting his email from
brother, received back message with his current physical
address
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
6/2/21 Sent all reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/2/21 Received email from Joe Panzica asking to meet in person to
discuss specifics of the project for his property
Email
6/3/21 Replied to Joe Panzica that I can meet in person, proposed a
time for that Friday or Monday, send along the designs and Fed.
Acquisition guide.
Email
6/3/21 Received email from Edward Panzica, who tagged MassDOT
personnel also, asking for parcel maps and survey date for the
project. Linda Walsh asked if he only wanted it for his own
parcel, which he responde he did. I replied that I have already
been in contact with Mr. Panzica and would continue to field
questions on behalf of the City.
Email
6/3/21 Received email from Edward Panzica, who tagged Christoper
Panzica and MassDOT personnell asking for parcel maps and
survey date for the project. I replied that I have already been in
contact with Mr. Panzica and would continue to field questions
on behalf of the City. Christopher Panzica did not respond.
Email
6/3/21 Received email from Edward Panzica that Joseph was tagged
on asking for details on parcel maps and survey data. I replied
all to that email but Joseph did not reply.
Email
6/4/21 Joseph Panzica asked if Monday morning was good. I said yes
and that I am leaving for the day and won't check my email over
the weekend and I would see him at Parsons St. for 10 am Mon.
Email
6/7/21 I replied that I would see him in a few minutes. He asked if we
planned on meeting at 9:39 am?
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail – Return Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project – Safe Routes
to School
609515
Property Owner(s): Property Address: Deed:
Hailu S. Dyami
78 Union St
Northampton, MA 01060
78 Union Street (10577, 206)
Easement(s): TE-15
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
4/27/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail – Return Receipt
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
1/13/22 Receipt of certified mail Undeliverable. Returned to sender. JF
emailed W Feiden for instructions for alternative owner contact.
Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Pomeroy Terrace Condominium
Helen M. Wrobleski, 2 Pomeroy
Terrace, Unit 1, Northampton, MA
01060
Rebecca L. Shannon, 2 Pomeroy
Terrace, Unit 2, Northampton, MA
01060
Vasilios Tourloukis, 2 Pomeroy
Terrace, Unit 3, Northampton, MA
01060
Arthur P. Apostolou, 2 Pomeroy
Terrace, Unit 4, Northampton, MA
01060
Charles William O’Neill and Patricia
Formant (Unit 5), 113 Kirk Crossing
Drive,
Decatur, GA 30030
Holly J. Keith (Unit 6), P. O. Box
924, Northampton, MA 01061
Dorien Miller and Jeffrey Zesiger, 2
Pomeroy Terrace, Unit 7,
Northampton, MA 01060
2 Pomeroy Terrace (11090, 31)
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner:
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
12/29/21 Emailed Wayne Feiden, Northampton Planning for better
contact at this property. R.Shannon believed to be just random
unit owner. Requested contact at Association
Email
12/30/21 W Feiden responded with Project Mgr. Ginny Curtis, (p)
413.529.9873. Phone no. not in operation.
wfeiden@northamptonma.g
ov
1/10/22 Emailed W Feiden to report I cannot reach Ginny Curtis,
potential contact. Asked for some direction
wfeiden@northamptonma.g
ov
2/7/22 W Feiden verified property contact/ condo association manager
Ginny Curtis updated phone number and email. JF telephoned
G. Curtis, discussed project and emailing TE plan for questions
Ginny Curtis 413.685.5490,
email
doghaven555@comcast.net
2/7/22 G Curtis provided postal address of PO Box 44, Huntington, MA
01050
email
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
2/28/22 Ginny Curtis- received offer will ask condo association to vote Email
3/7/2022 Condo association voted unanimously to accept city offer Email
3/15/22 Sent W9 to condo association (Ginny Curtis, manager) Email
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Helen M. Wrobleski 2 Pomeroy Terrace, Unit 1,
Northampton, MA 01060
3166, Page 193
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
4/27/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
Contracts through condo association, above
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Rebecca L. Shannon 2 Pomeroy Terrace, Unit 2,
Northampton, MA 01060
3166, Page 193
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Rebecca
Shannon was CC'd on the original email that was then
forwarded to me
Email
5/3/21 Emailed several Pomeroy Terrace owners asking to fill out poll
with their availability for a site visit. Also sent link to Federal
acquisition guide and the Safe Routes notice from MassDOT
Email
5/3/21 Received email from property manager confirming the date &
time of site visit, Rebecca Shannon CC'd on that email. I replied
to confirm that date & time.
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
5/13/21 Site visit with several Pomeroy Terrace owners, talked about
project generally and fielded specific questions.
Site Visit
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
6/10/21 Emailed to confirm Rebecca or Becky on property list. She
replied back that it was Rebecca.
Email
6/28/21 Sent link to all property owners with email the recording link. Email
Contacts through condo association, above
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Vasilios Tourloukis 2 Pomeroy Terrace, Unit 3,
Northampton, MA 01060
3166, Page 193
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Vasilios was
CC'd on the original email that was then forwarded to me
Email
5/3/21 Emailed several Pomeroy Terrace owners asking to fill out poll
with their availability for a site visit. Also sent link to Federal
acquisition guide and the Safe Routes notice from MassDOT
Email
5/3/21 Received email from property manager confirming the date &
time of site visit, Vasilios CC'd on that email. I replied to confirm
that date & time.
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
5/13/21 Site visit with several Pomeroy Terrace owners, talked about
project generally and fielded specific questions.
Site Visit
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
Contacts through condo association, above
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Arthur P. Apostolou 2 Pomeroy Terrace, Unit 4,
Northampton, MA 01060
3166, Page 193
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Mr. Apostolou
was CC'd on the original email that was then forwarded to me
Email
5/3/21 Emailed several Pomeroy Terrace owners asking to fill out poll
with their availability for a site visit. Also sent link to Federal
acquisition guide and the Safe Routes notice from MassDOT
Email
5/3/21 Received email from property manager confirming the date &
time of site visit, Mr. Apostolou CC'd on that email. I replied to
confirm that date & time.
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
5/13/21 Site visit with several Pomeroy Terrace owners, talked about
project generally and fielded specific questions.
Site Visit
5/13/21 Received email from Mr. Aposolou thanking for the site visit Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
ReceiptCon
6/28/21 Sent link to all property owners with email the recording link. Email
Contacts through condo association, above
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Charles William O’Neil and Patricia
Formant
2 Pomeroy Terrace, Unit 5,
Northampton, MA 01060
3166, Page 193
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Charles O’Neil
was CC'd on the original email that was then forwarded to me
Email
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Patricia
Formant was CC'd on that email.
Email
5/3/21 Emailed several Pomeroy Terrace owners asking to fill out poll
with their availability for a site visit. Also sent link to Federal
acquisition guide and the Safe Routes notice from MassDOT
Email
5/3/21 Received email from property manager confirming the date &
time of site visit, Charles O’Neil CC'd on that email. I replied to
confirm that date & time.
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
5/13/21 Site visit with several Pomeroy Terrace owners, talked about
project generally and fielded specific questions.
Site Visit
5/13/21 Received email from property manager thanking me for the site
visit, Patricia Formant was CC'd.
Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
7/1/21 Letter of Intent returned - could not forward Mail
7/1/21 Emailed Charles for correct address and he responded Email
Contacts through the condo association, above
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Holly J. Keith 2 Pomeroy Terrace, Unit 6,
Northampton, MA 01060
3166, Page 193
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Holly Keith
was CC'd on the original email that was then forwarded to me
Email
5/3/21 Emailed several Pomeroy Terrace owners asking to fill out poll
with their availability for a site visit. Also sent link to Federal
acquisition guide and the Safe Routes notice from MassDOT
Email
5/3/21 Received email from property manager confirming the date &
time of site visit, Holly Keith CC'd on that email. I replied to
confirm that date & time.
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
5/13/21 Site visit with several Pomeroy Terrace owners, talked about
project generally and fielded specific questions.
Site Visit
5/13/21 Received email from property manager thanking me for the site
visit, Holly Keith was CC'd. I replied my regards.
Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
Contacts through condo association (above)
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Dorien Miller and Jeffrey Zesiger 2 Pomeroy Terrace, Unit 7,
Northampton, MA 01060
3166, Page 193
Easement(s): TE-16 (383 sq ft.)
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Dorien Miller
was CC'd on the original email that was then forwarded to me
Email
5/1/21 Received email from property manager of 2 Pomeroy Terrace
stating my email from previous letter was wrong. Jeffrey Zesiger
was CC'd on the original email that was then forwarded to me
Email
5/3/21 Emailed several Pomeroy Terrace owners asking to fill out poll
with their availability for a site visit. Also sent link to Federal
acquisition guide and the Safe Routes notice from MassDOT
Email
5/3/21 Received email from property manager confirming the date &
time of site visit, Dorien Miller CC'd on that email. I replied to
confirm that date & time.
Email
5/3/21 Received email from property manager confirming the date &
time of site visit, Jeffrey Zesiger CC'd on that email. I replied to
confirm that date & time.
Email
5/13/21 Sent MassDOT meeting link to all property owners that I had
email addresses for
Email
5/13/21 Site visit with several Pomeroy Terrace owners, talked about
project generally and fielded specific questions.
Site Visit
5/13/21 Received email from property manager thanking me for the site
visit, Dorien Miller was CC'd.
Email
5/13/21 Received email from property manager thanking me for the site
visit, Jeffrey Zesiger was CC'd.
Email
6/2/21 Sent a reminder to all property owners regarding the meeting
that night for all owners whose email address I had
Email
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
6/28/21 Sent link to all property owners with email the recording link. Email
Contacts through condo association (above)
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project – Safe Routes
to School
609515
Property Owner(s): Property Address: Deed:
Edwin C. & Carl E. Glowatsky
49 Henry St
Northampton, MA 01060
111 Hawley Street, Northampton, MA
01060
(1317, 391)
Easement(s): TE-17
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
5/10/21 Received voicemail from Edwin Glowatsky asking for a call back
to discuss the SRTS project.
Phone
5/10/21 Called back Edwin Glowatsky to discuss the project, specific
details about his property, and how he can learn more about it at
the meeting. He does not have email or internet.
Phone
5/10/21 Talked to Carl's brother, Edwin who gave me Carl's phone # Phone
5/10/21 Called Carl Glowatsky to discuss the project, specific details
about his property, and how he can learn more about it at the
meeting. He does not have email or internet. He asked if I would
personally buy his property off of him. I said no.
Phone
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
6/22/21 Carl emailed Karen Axtel at MassDOT requesting more info.
and a site meeting. Karen gave him Keith Benoit's email and
explained the process.
Email
6/22/21 Keith called Carl to schedule a meeting and answer any
questions. Carl said his brother Ed does not answer the phone.
Phone
6/22/21 Keith called Edwin to schedule a meeting to meet in person, left
voicemail.
Phone
6/28/21 Sent link to all property owners with email the recording link. Email
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
1/3/22 Phone call from Carl Glowatsky would like to schedule appt. for
1/12/2022 at 9am. JF confirmed. Will meet at property.
Telephone Carl Glowatsky
413.529.9717
1/12/22 JF met with Carl Glowatsky and Ed Glowatsy at the property.
Discussed project and TE. Outstanding question is why the
project is why the Bridge St school project is extending to
Hawley Street. JF to ask Wayne Feiden for the answer and
report back.
Physical meeting
1/13/22
1/28/22
JF emailed W Feiden with owner issues/ questions.
W Feiden forwarded to TEC (Designer) by email
Email
2/1/22 Kevin Dandrade of TEC responded to owner issues (“red”). JF
called Carl Glowatsky to provide response.
3. 111 Hawley Street, TE17. Ed and Carl Glowatsky, property
owners, would like to know why the Bridge Street School project
is extending to Hawley Street. The School and City staff, and
DOT’s planning team, collectively identified the potential to
improve the walking environment along Hawley Street for those
students that walk from the Holyoke Street area. We are
targeting two of the wide curb cuts where there are ill-defined
pedestrian crossings.
Email TEC (Designer)
Telephone Carl Glowatsky
413.529.9717
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
3/17/22 Owner stopped by the office with questions on the timing of the
project and snow clearing challenges
Owner visited Planning
office
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
William McLoughlin
123 Hawley Street LLC
c/o Shelly Fournier
PO BOX 208
Easthampton, MA 01027
123 Hawley Street (9322, 161)
(3166, 193)
Easement(s): TE-18
Date Federal Aid Guide for Property Owners was given to the Property Owner:
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail - Return
Receipt
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
Receipt of certified mail delivered Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
Northampton Community Arts Trust,
Inc.
33 Hawley Street
Northampton, MA 01060
33 Hawley St (11496, 73)
Easement(s): TE-21
Date Federal Aid Guide for Property Owners was given to the Property Owner: 12/17/21
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
08/27/19 Shared that SRTS funded will include 33 Hawley St sidewalks Email
08/27/19 Arts Trust reached out and said that they would donate
easement
Phone
12/17/21 Shared plans and certificate of donation Email
12/20/21 Certificate of donation signed In-person
2/18/22 Formal notice of upcoming takings before City Council Certified mail
3/14/22 Arts Trust press conference on congressional appropriation and
mention of sidewalks at conference
In-Person
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Bridge Street (Route 9), Parsons
Street & Hawley Street Roadway
Improvement Project
609515
Property Owner(s): Property Address: Deed:
James P. & Cynthia L. Kwiecinski
47 Hannum Brook Dr
Easthampton, MA 01027
28 Holyoke Street (9383, 126)
Easement(s): TE-21
Date Federal Aid Guide for Property Owners was given to the Property Owner: 11/30/21 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
11/30/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting. Sent
each owner Letter of Intent with their own address, parcel ID's
being affected, sq. footage of any easement, how the project
may affect them, and summary of the donation process. Also
included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Certified Mail –
Return Receipt
12/17/21 Written letter from appraiser indicating we are appraising,
inspecting, offered opportunity to meet.
Certified Mail
12/24/21 Receipt of certified mail delivered Mail
Outreach and meetings from Crowley Associates- see separate
contact diary in their appraisals
2/18/22 Formal offer and notice of upcoming takings before City Council Certified mail
5/19/22 Notice of Acquisition Mail
Property Owner Contact Diary
All contact with Property Owner(s) by mail, email and phone – or in person from pre-initiation of the project to
issuing the Right of Way Certification must be chronologically detailed below.
**All mail must be sent certified mail with return receipts**
Please contact your Community Compliance Officer for questions about this form.
Municipality: Project Name: Project Number:
Northampton Safe Routes to School 609515
Property Owner(s): Property Address: Deed:
Barbara Boski and Jill Boski 82 Parsons Street, Northampton, MA
01060
5903, Page 175
Easement(s): TE-3 / 293 sq. ft.
Date Federal Aid Guide for Property Owners was given to the Property Owner: June 9, 2021 (mailed)
Summarize below the purpose for the contact with the Property Owner.
Include time and place of any conversation with the property owner(s); persons present, purpose of the
conversation, topics discussed in detail, description of documents given to or signed by the property
owner(s), concerns and expectations of the property owner(s), conclusion of follow up action needed.
DATE Contact Summary Contact Method
4/27/21 Sent each owner notice of project, overview of project, link to a
copy of fed. guide and notice of the MassDOT meeting.
USPS Mail
6/9/21 Sent each owner Letter of Intent with their own address, parcel
ID's being affected, sq. footage of any easement, how the
project may affect them, and summary of the donation process.
Also included, a pre-filled Donation Certificate for each property
owner and a paper copy of the fed. guide for homeowners.
USPS Mail – Return Receipt
6/16/21 Certificate of Donation sent to the City Mail
5/18/22 Notice of Acquisition Mail