Loading...
18D-001 Big Y Site Plan~~~ ,- ~ -> m STORMWATER MANAGEMENT PERMIT 3 u yyl' ~, l f Approval of Specific Permit City o1' Na•thampton Department of Public Worlcs Conditions Project / Site Naine: Big Y, Hamp Plaza Project Street or Location /Assessor ID: 142-188 North Kind St. / 18D-001-001 Applicant Nalne: Edwards and Kelcey Applicant Address/Phone: 343 Con;n•ess St., Boston, MA 02210 / 617-242-9222 Owner Naine: Bi>? Y Foods, Inc Owner Address/Phone: 2145 Roosevelt Ave., Springfield, MA / 413-504-4790 Date of Permit Approval: 3/24/2005 THE FOLLOWING SPECIFIC PERMIT CONDITIONS ISSUED BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS (DPW) ON 3/24/2005 AS PART OF THE APPICATION DECISION FOR THE ABOVE REFERENCED SITE - - HAVE BEEN COMPLETED AND APPROVED BY THE DPW. Specific Permit Condition #1 A Stormwater Operation, Maintenance, and Inspection Agreement has been executed and a receipt certifying that this document has been recorded in the land records of the Hampshire County Registry of Deeds must be submitted to the DPW. Specific Permit Condition #2 The DPW has ><•eviewed and hereby approves the revision of the following documents to meet Specific Condition #2 above. • Stormwater Pollution Prevention Plan (SWPPP) dated 1/12/2007 by Edwards and Kelcey • Revised Site Plans, Big Y World Class Market-Hamp Plaza, Sheet C-201 (Erosion Control and Phasing Plan), Sheet C-500 (Detail foi• Temporary Sediment Basin), and Sheet C-504 (Details fo1• Erosion and Sediment Control Structures) dated 1/11/2007 by Edwards and Kelcey. Specific Permit Condition #3 The DPW hereby approves the design of the proposed infiltration system to be constructed in strict accordance with the following plans and information submitted by the Applicant: G:\Stormwater Permits\Storm~~~ater Permits\Permits_Active\North King Street\0142-0188 North King St-Big Y Condition ApprovaLdoc Page 1 of 2 • Revised Infiltration System Worksheet-for Big YSupermarket-Hamp Plaza, dated 3/10/2005 by Edwards and Kelcey. • Letter of Transmittal from Roy A. Tiano, Civil Projects Manager, Edwards and Kelcey, to Northampton DPW, dated 10/27/2005, including an Edwards and Kelcey Memorandum, dated 10/13/2005, regarding Big Y Percolation Tests and Soil Test Pit and Percolation Test Results for Big Y dated 9/30/2005, by JGI Eastern, Inc. • Revised Site Plans, Big Y World Class Market-Hamp Plaza, Sheet C-200 (Grading and Drainage Plan) and Sheet C-501 (Detail for Infiltration Chamber Section), dated 1/11/2007 by Edwards and Kelcey. z . ~. ignature of C' Engineer Da e cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development E:\Stormwater Permits\Stormwater Permits\Pennits_Active\North King Street\0142-0183 North King St-Big Y Condition Approval.doc Page 2 of 2