18D-001 Big Y Site Plan~~~
,- ~ -> m STORMWATER MANAGEMENT PERMIT
3 u yyl' ~, l
f
Approval of Specific Permit
City o1' Na•thampton
Department of Public Worlcs Conditions
Project / Site Naine: Big Y, Hamp Plaza
Project Street or Location /Assessor ID: 142-188 North Kind St. / 18D-001-001
Applicant Nalne: Edwards and Kelcey
Applicant Address/Phone: 343 Con;n•ess St., Boston, MA 02210 / 617-242-9222
Owner Naine: Bi>? Y Foods, Inc
Owner Address/Phone: 2145 Roosevelt Ave., Springfield, MA / 413-504-4790
Date of Permit Approval: 3/24/2005
THE FOLLOWING SPECIFIC PERMIT CONDITIONS ISSUED BY THE
NORTHAMPTON DEPARTMENT OF PUBLIC WORKS (DPW) ON 3/24/2005 AS
PART OF THE APPICATION DECISION FOR THE ABOVE REFERENCED SITE
- -
HAVE BEEN COMPLETED AND APPROVED BY THE DPW.
Specific Permit Condition #1
A Stormwater Operation, Maintenance, and Inspection Agreement has been executed and
a receipt certifying that this document has been recorded in the land records of the
Hampshire County Registry of Deeds must be submitted to the DPW.
Specific Permit Condition #2
The DPW has ><•eviewed and hereby approves the revision of the following documents to
meet Specific Condition #2 above.
• Stormwater Pollution Prevention Plan (SWPPP) dated 1/12/2007 by Edwards and
Kelcey
• Revised Site Plans, Big Y World Class Market-Hamp Plaza, Sheet C-201 (Erosion
Control and Phasing Plan), Sheet C-500 (Detail foi• Temporary Sediment Basin), and
Sheet C-504 (Details fo1• Erosion and Sediment Control Structures) dated 1/11/2007 by
Edwards and Kelcey.
Specific Permit Condition #3
The DPW hereby approves the design of the proposed infiltration system to be constructed
in strict accordance with the following plans and information submitted by the Applicant:
G:\Stormwater Permits\Storm~~~ater Permits\Permits_Active\North King Street\0142-0188 North King St-Big Y Condition
ApprovaLdoc
Page 1 of 2
• Revised Infiltration System Worksheet-for Big YSupermarket-Hamp Plaza,
dated 3/10/2005 by Edwards and Kelcey.
• Letter of Transmittal from Roy A. Tiano, Civil Projects Manager, Edwards and
Kelcey, to Northampton DPW, dated 10/27/2005, including an Edwards and Kelcey
Memorandum, dated 10/13/2005, regarding Big Y Percolation Tests and Soil Test
Pit and Percolation Test Results for Big Y dated 9/30/2005, by JGI Eastern, Inc.
• Revised Site Plans, Big Y World Class Market-Hamp Plaza, Sheet C-200
(Grading and Drainage Plan) and Sheet C-501 (Detail for Infiltration Chamber
Section), dated 1/11/2007 by Edwards and Kelcey.
z . ~.
ignature of C' Engineer Da e
cc. Planning Board c/o Office of Planning and Development
Building Department
Conservation Commission c/o Office of Planning and Development
E:\Stormwater Permits\Stormwater Permits\Pennits_Active\North King Street\0142-0183 North King St-Big Y Condition
Approval.doc
Page 2 of 2