Loading...
31A-175 (5) 3//:1 - /75--0O / Massachusetts Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1248 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑ Check if owner-installed Shannon Welch Interconnecting Customer: Contact Person: 1 Mailing Address: 32 Maynard Road City: Northampton State: MA Zip Code: 01060 Telephone(Daytime): 202-329-5937 (Evening): Facsimile Number: E-Mail Address: edwelch32@gmail.com Address of Facility(if different from above): Electrical Contractor's Name (if appropriate): Valley Solar Mailing Address: PO BOX 60627 City: Florence State: MA Zip Code: 01062 Telephone(Daytime): 413-584-8844 (Evening): �A n n e l, Infovallsolar.solar Facsimile Number: E-Mail Address: @ y 46,/Zo 22_ License number: 1/15/2022 Date of approval to install Facility granted by National Grid: Application ID number: 359928 ? Inspection The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): heft and„Arr1.,,. Signed(LT Electr. al ' ing Inspector, or attach signed electrical inspection): ete Name (printed): 1Coco.Ar- n4q L Date: 2--i() -�.),, License#: V 0 G.Ci As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Attn: Distributed Generation 40 Sylvan Rd Waltham, MA 02451 E-mail: distributed.generationAnationalgrid.com Massachusetts:http://www.nationalgridus.com/masselectric/home/energyeff/distributed generation.asp Nantucket:http://www.nationalgridus.com/nantucket/home/energyeff/distributed generation.asp Page 1 of 1