Design--001_609515_PS&E Design PlansLIMIT OF WORK
STA 112+20
N2944712.3407
E351872.8182
BRID
GE ST
REET
(ROUTE 9)POMEROY TERRACEPARSONS STREET
H
A
W
L
E
YMARKET STREETPLEASANT STREET
FAIR STR
E
E
T
LIMIT OF WORK
STA 312+70
N2942852.4220
E352001.9425
BRIDGE STREET
ELEMENTARY
SCHOOL
STREETLIMIT OF WORK
STA 304+31
N2943573.5332
E351621.2873
PROJECT BEGIN
STA 200+10
N2946236.4404
E350562.6579
LIMIT OF WORK
STA 305+35
N2943497.5894
E351692.3405
LIMIT OF WORK
STA 218+68
N2945244.9199
E351827.5126
LIMIT OF WORK
STA 118+62
N2945352.3276
E351898.0194
LIMIT OF WORK
STA 316+24
N2942515.3124
E352105.0029
LIMIT OF WORK
STA 216+70
N2945130.6497
E351666.4446
LENGTH OF PROJECT (PARSONS STREET) = 1,633 FEET = 0.309 MILES
IN THE CITY OF
HAMPSHIRE COUNTY
BRIDGE STREET (ROUTE 9), PARSONS STREET & HAWLEY STREET
NORTHAMPTON
FEDERAL AID PROJECT NO.
PLAN OF
T1006.01_HD1(TITLE SHEET).DWG11-Nov-2021 8:12 AMPlotted onDESIGN
DESIGNATION
(BRIDGE STREET
(ROUTE 9))
PARSONS
STREET
HAWLEY
STREET
DESIGN SPEED 35 MPH 20 25
ADT (2019)12,648 --
ADT (2028)13,833 --
K 8.0%--
D 49.8%--
T (PEAK HOUR)2.4%--
T (AVERAGE DAY)4.2%--
DHV 1101 --
DDHV 548 --
FUNCTIONAL
CLASSIFICATION
URBAN PRINCIPAL
ARTERIAL LOCAL LOCAL
INDEX
SHEET NO.DESCRIPTION
1 TITLE SHEET & INDEX
2 LEGEND & ABBREVIATIONS
3 KEY PLAN
4 TYPICAL SECTIONS
5 - 11 CONSTRUCTION PLANS
12 - 13 PROFILES
14 - 20 CURB TIE & GRADING PLANS
21 - 26 TRAFFIC SIGN & PAVEMENT MARKING PLANS
27 TRAFFIC SIGN SUMMARY
28 - 30 TEMPORARY TRAFFIC CONTROL PLANS
31 - 35 CONSTRUCTION DETAILS
36 - 50 CROSS SECTIONS
PS&E SUBMITTAL
N
169 Ocean Blvd, Unit 3
PO Box 249
Hampton, NH 03842
603-601-8154
146 Dascomb Road
Andover, MA 01810
978-794-1792
311 Main Street
2nd Floor
Worcester, MA 01608
508-868-5104
www.TheEngineeringCorp.com
PROJECT
LOCATION
500
SCALE: 1" = 500'
0 1000 1500 2000
DATE
APPROVED
CHIEF ENGINEER
DATE DESCRIPTION REV #
PROJECT
LOCATION
11/03/2020 25% DESIGN SUBMITTAL 1
LENGTH OF PROJECT (BRIDGE STREET (ROUTE 9)) = 765 FEET = 0.145 MILES
LENGTH OF PROJECT (HAWLEY STREET) = 605 FEET = 0.115 MILES
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION
HIGHWAY DIVISION TITLE SHEET & INDEX
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
1
THESE PLANS ARE SUPPLEMENTED BY THE OCTOBER 2017 CONSTRUCTION STANDARD DETAILS,
THE 2015 OVERHEAD SIGNAL STRUCTURE AND FOUNDATION STANDARD DRAWINGS, MASSDOT
TRAFFIC MANAGEMENT PLANS AND DETAIL DRAWINGS, THE 1990 STANDARD DRAWINGS FOR SIGNS
AND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND HIGHWAY LIGHTING,
AND THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK.
PROJECT
LOCATION
05/27/2021 25% DESIGN SUBMITTAL REVISED 2
08/19/2021 75-100% DESIGN SUBMITTAL 3
11/12/2021 PS&E DESIGN SUBMITTAL 4
T1006.01_HD2(LEGEND).DWG11-Nov-2021 8:12 AMPlotted onGENERAL SYMBOLS
EXISTING PROPOSED DESCRIPTION
JERSEY BARRIER
CATCH BASIN OR GUTTER INLET
CATCH BASIN OR GUTTER INLET W/ CURB INLET
FLAG POLE
GAS PUMP
MAIL BOX
POST SQUARE
POST CIRCULAR
WELL
ELECTRIC HANDHOLE
FENCE GATE POST
GAS GATE
BORING HOLE
MONITORING WELL
TEST PIT
HYDRANT
LIGHT POLE
COUNTY BOUND
GPS POINT
CABLE MANHOLE
DRAINAGE MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
MISC MANHOLE
SEWER MANHOLE
TELEPHONE MANHOLE
WATER MANHOLE
MASSACHUSETTS HIGHWAY BOUND
MONUMENT
STONE BOUND
TOWN OR CITY BOUND
TRAVERSE OR TRIANGULATION STATION
TROLLEY POLE OR GUY POLE
TRANSMISSION POLE
UTILITY POLE W/ FIREBOX
UTILITY POLE WITH DOUBLE LIGHT
UTILITY POLE W / 1 LIGHT
UTILITY POLE
BUSH
TREE
STUMP
SWAMP / MARSH
WATER GATE
WATER SHUTOFF/CURB STOP
PARKING METER
OVERHEAD CABLE/WIRE
CURBING
CONTOURS (ON-THE-GROUND SURVEY DATA)
CONTOURS (PHOTOGRAMMETRIC DATA)
UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)
BALANCED STONE WALL
GUARD RAIL - STEEL POSTS
GUARD RAIL - WOOD POSTS
CHAIN LINK OR METAL FENCE
WOOD FENCE
HAY BALES/SILT FENCE
TREE LINE
EDGE OF PAVEMENT
SAWCUT LINE
TOP OR BOTTOM OF SLOPE
LIMIT OF EDGE OF MICROMILLING AND OVERLAY
BANK OF RIVER OR STREAM
BORDER OF WETLAND
100 FT WETLAND BUFFER
200 FT RIVERFRONT BUFFER
STATE HIGHWAY LAYOUT
TOWN OR CITY LAYOUT
COUNTY LAYOUT
RAILROAD SIDELINE
TOWN OR CITY BOUNDARY LINE
PROPERTY LINE OR APPROXIMATE PROPERTY LINE
EASEMENT
PAVEMENT MARKINGS SYMBOLS
EXISTING PROPOSED DESCRIPTION
PAVEMENT ARROW - WHITE
LEGEND "ONLY" - WHITE
BIKE LANE LEGEND - WHITE
STOP LINE
CROSSWALK
SOLID WHITE LINE
SOLID YELLOW LINE
BROKEN WHITE LINE
BROKEN YELLOW LINE
6" DOTTED WHITE LINE (3' LINE W/ 9' GAP)
6" DOTTED YELLOW LINE (3' LINE W/ 9' GAP)
6" DOTTED WHITE LINE EXTENSION (2' LINE W/ 6' GAP)
6" DOTTED YELLOW LINE EXTENSION (2' LINE W/ 6' GAP)
DOUBLE WHITE LINE
DOUBLE YELLOW LINE
12" YELLOW GORE LINE (3:1, 10' O.C.)
ABBREVIATIONS
GENERAL
AADT ANNUAL AVERAGE DAILY TRAFFIC
ABAN ABANDON
ADJ ADJUST
APPROX.APPROXIMATE
A.C.ASPHALT CONCRETE
ACCM PIPE ASPHALT COATED CORRUGATED METAL PIPE
BIT.BITUMINOUS
BC BOTTOM OF CURB
BD.BOUND
BL BASELINE
BLDG BUILDING
BM BENCHMARK
BO BY OTHERS
BOS BOTTOM OF SLOPE
BR.BRIDGE
CB CATCH BASIN
CBCI CATCH BASIN WITH CURB INLET
CC CEMENT CONCRETE
CCM CEMENT CONCRETE MASONRY
CEM CEMENT
CI CURB INLET
CIP CAST IRON PIPE
CLF CHAIN LINK FENCE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CSP CORRUGATED STEEL PIPE
CO.COUNTY
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CR GR CROWN GRADE
DHV DESIGN HOURLY VOLUME
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DW STEADY DON'T WALK - PORTLAND ORANGE
DWY DRIVEWAY
ELEV (or EL.)ELEVATION
EMB EMBANKMENT
EOP EDGE OF PAVEMENT
EXIST (or EX)EXISTING
EXC EXCAVATION
F&C FRAME AND COVER
F&G FRAME AND GRATE
FDN.FOUNDATION
FLDSTN FIELDSTONE
GAR GARAGE
GC GRANITE CURB
GD GROUND
GG GAS GATE
GI GUTTER INLET
GIP GALVANIZED IRON PIPE
GRAN GRANITE
GRAV GRAVEL
GRD GUARD
HDW HEADWALL
HMA HOT MIX ASPHALT
HOR HORIZONTAL
HYD HYDRANT
INV INVERT
JCT JUNCTION
L LENGTH OF CURVE
LB LEACH BASIN
LOG LIMIT OF GRADING
LP LIGHT POLE
L&S LOAM AND SEED
LT LEFT
MAX MAXIMUM
MB MAILBOX
MH MANHOLE
MHB MASSACHUSETTS HIGHWAY BOUND
MIN MINIMUM
NIC NOT IN CONTRACT
NO.NUMBER
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
P.G.L.PROFILE GRADE LINE
PI POINT OF INTERSECTION
POC POINT ON CURVE
POT POINT ON TANGENT
PRC POINT OF REVERSE CURVATURE
PROJ PROJECT
PROP PROPOSED
PSB PLANTABLE SOIL BORROW
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE
PVI POINT OF VERTICAL INTERSECTION
ABBREVIATIONS (cont.)
GENERAL
PVT POINT OF VERTICAL TANGENCY
PVMT PAVEMENT
PWW PAVED WATERWAY
R RADIUS OF CURVATURE
R&D REMOVE AND DISPOSE
RCP REINFORCED CONCRETE PIPE
RD ROAD
RDWY ROADWAY
REM REMOVE
RET RETAIN
RET WALL RETAINING WALL
ROW RIGHT OF WAY
RR RAILROAD
RRFB RECTANGULAR RAPID FLASHING BEACON
R&R REMOVE AND RESET
R&S REMOVE AND STACK
RT RIGHT
SB STONE BOUND
SHLD SHOULDER
SMH SEWER MANHOLE
ST STREET
STA STATION
SSD STOPPING SIGHT DISTANCE
SHLO STATE HIGHWAY LAYOUT LINE
SW SIDEWALK
T TANGENT DISTANCE OF CURVE/TRUCK %
TAN TANGENT
TEMP TEMPORARY
TC TOP OF CURB
TOS TOP OF SLOPE
TYP TYPICAL
UP UTILITY POLE
VAR VARIES
VERT VERTICAL
VC VERTICAL CURVE
WCR WHEEL CHAIR RAMP
WG WATER GATE
WIP WROUGHT IRON PIPE
WM WATER METER/WATER MAIN
X-SECT CROSS SECTION
DBYL
DBWL
BWL
SWL
ONLY
SL
DYLEx
DWLEx
DYL
BYL
DWL
SYL
JB
CB/GI
FP
GP
MB
WELL
EHH
GG
BHL #
MW #
TP #
MHB
TPL or GUY
UFB
UPDL
ULT
UPL
WG
PM
WSO
CBCI/GICI
TRAFFIC SYMBOLS
EXISTING PROPOSED
TRAFFIC SIGN (1 POST)
TRAFFIC SIGN (2 POST)
RECTANGULAR RAPID FLASHING BEACON (RRFB)
D
YGL
CW
LEGEND & ABBREVIATIONS
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
2
PARSON
S
STREET BRIDGE STREETD
D
D
5 21 6 22 7 23
8
2
4
11
26
PARSONS STREET PARSONSSTREET1011021031041051061071081091101111121
1
3
1
1
4
1
1
5
1
1
6
1
1
7
1
1
8
1
1
9
1
2
0
100+00120+50
301 302 303 304 305 306 307 308 309
310
31
1
3
1
2
31
3
314
315
31
6
300+0
0
316+66.17
HAW
L
E
Y
S
T
R
E
E
T
NORTH
STREET
HIGHLAND
AVENUE LINDEN
STREET
WALNUT
STREET CHERRY
STREET UNION
STREET
EASTERN AVENUE
ISABELLA
STREET
HOLYOKE
STREETBRIDGE STREET (ROUTE 9)B
R
I
D
G
E
S
T
R
E
E
T
(
R
O
U
T
E
9
)
201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216217218219200+00
219+40.63
PO
M
E
R
O
Y
T
E
R
R
A
C
E
PROJECT BEGIN
STA 200+10
N2946236.4404
E350562.6579
PROJECT END
STA 216+70
N2945130.6497
E351666.4446
LIMIT OF WORK
STA 112+20
N2944712.3407
E351872.8182
LIMIT OF WORK
STA 312+70
N2942852.4220
E352001.9425
10
BUTLER PLACELIMIT OF WORK
STA 304+31
N2943573.5332
E351621.2873
LIMIT OF WORK
STA 305+35
N2943497.5894
E351692.3405
LIMIT OF WORK
STA 118+62
N2945352.3227
E351898.0194
LIMIT OF WORK
STA 316+24
N2942515.3124
E352105.0029
14 15 16
1
7
9
2
5
1
8
19
20
LIMIT OF WORK
STA 218+68
N2945244.9199
E351827.5126NN
A
D
8
3
T1006.01_HD3(KEY PLAN).DWG11-Nov-2021 8:12 AMPlotted on150
SCALE: 1" = 150'
0 225 750
X
X
CONSTRUCTION PLAN
TRAFFIC SIGN & PAVEMENT MARKING PLAN
LEGEND
KEY PLAN
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
3
CURB TIE & GRADING PLANX
PAVEMENT NOTES
PROPOSED FULL DEPTH PAVEMENT AND PERMANENT TRENCH PATCH
(MINIMUM PAVEMENT SECTION OR MATCH EXISTING THICKER PAVEMENT SECTION)
SURFACE: 13 4" SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) OVER
212" SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0) OVER
BASE:312" SUPERPAVE INTERMEDIATE COURSE - 19.0(SIC - 19.0) OVER
SUBBASE:4" DENSE GRADED CRUSHED STONE OVER
8" GRAVEL BORROW, TYPE b
PROPOSED HMA DRIVEWAY (TO MATCH EXISTING)
SURFACE: 112" SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) OVER
2 12 " SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC - 12.5) OVER
BASE:EXCAVATE EXISTING HMA TO SAWCUT
FINE GRADE AND COMPACT EXISTING BASE;
8" SUITABLE EXISTING GRAVEL
ADD GRAVEL BORROW, TYPE b AS REQUIRED TO MATCH PROPOSED GRADES
PROPOSED CEMENT CONCRETE SIDEWALK THROUGH DRIVEWAY
SURFACE: 6" CEMENT CONCRETE (AIR ENTRAINED, 4000 PSI, 3 4", 610)
BASE:8" GRAVEL BORROW, TYPE b
PROPOSED CEMENT CONCRETE SIDEWALKS / PEDESTRIAN CURB RAMPS / WALKWAYS / MEDIANS
SURFACE: 4" CEMENT CONCRETE (AIR ENTRAINED, 4000 PSI, 3 4", 610)
BASE:8" GRAVEL BORROW, TYPE b
GENERAL PAVEMENT NOTES:
1.ASPHALT EMULSION FOR TACK COAT SHALL BE APPLIED BETWEEN ALL ASPHALT
SURFACES AND HMA JOINT SEALANT SHALL BE APPLIED ON SAWCUT JOINTS
BEFORE PAVING. HMA JOINT SEALANT SHALL BE APPLIED TO ALL COLD JOINTS
(LONGITUDINAL AND TRANSVERSE) BEFORE PAVING SURFACE COURSE. ASPHALT
EMULSION FOR TACK COAT SHALL BE APPLIED IN ACCORDANCE WITH SUBSECTION
450.43. ALL SURFACES SHALL BE CLEAN OF ALL ORGANICS, DEBRIS, AND SAND
PRIOR TO PAVING.
2.ASPHALT EMULSION FOR TACK COAT SHALL BE RS-1H TO RESIST TRACKING OF
TACK BY HAUL VEHICLES.
3.ALL GRAVEL BORROW MEETING SPECIFICATION SHALL BE RETAINED IN PLACE,
COMPACTED, AND LEVELED AS REQUIRED.
1.5%*
CONST BL
10'
TRAVEL LANE
5.5'
CEM CONC
SIDEWALK
TYPICAL SECTION
PARSONS STREET
200+10± TO 214+70±
NTS
*TOLERANCE FOR CONSTRUCTION ±0.5%
PROP 4" LOAM
& SEED
PROP SAWCUT
PROP GC;
TYPE VB
CONST BL
WIDTH VARIES
TRAVEL LANE
VARIES
GRASS
BUFFER
CONST BL
WIDTH VARIES
TRAVEL LANE
VARIES
CEM CONC
SIDEWALK
5.5'
GRASS
BUFFER
TYPICAL SECTION
HAWLEY STREET
313+30± TO 315+43±
NTS
*TOLERANCE FOR CONSTRUCTION ±0.5%
EXISTING GROUND EXISTING GR
O
U
N
D
EXISTING GROUND EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
PROP SAWCUT
1' LEVEL
CITY LAYOUT
WIDTH VARIES
CITY LAYOUT
WIDTH VARIES
CITY LAYOUT
WIDTH VARIES
CONST BL
6'
CEM CONC MEDIAN
11'
TRAVEL LANE
5'
SHOULDER
11'
TRAVEL LANE
5'
SHOULDER
1' SHOULDER1' SHOULDER
CITY LAYOUT
84'
TYPICAL SECTION
BRIDGE STREET
115+00± TO 115+50±
NTS
*TOLERANCE FOR CONSTRUCTION ±0.5%
PROP SAWCUT
PROP GC;
TYPE VB
PROP GC;
TYPE VB
PROP 4" LOAM
& SEED
EXISTING GROUND EXISTING GROUND
1.5%*
1.5%*
PROP SAWCUTPROP GC;
TYPE VB
5'
CEM CONC
SIDEWALK
TYPICAL SECTION
HAWLEY STREET
304+31± TO 304+66±
NTS
*TOLERANCE FOR CONSTRUCTION ±0.5%
INSET A
TYPICAL SECTION
HAWLEY STREET
304+31± TO 305+35±
NTS
*TOLERANCE FOR CONSTRUCTION ±0.5%
PROP SAWCUT
INSET A
TEMPORARY
EASEMENT
TEMPORARY
EASEMENT
TEMPORARY
EASEMENT
PROP GC;
TYPE VB
CEM CONC
SIDEWALK
10'
1.5%*
PROP SAWCUT T1006.01_HD4(TYPICAL SECTIONS).DWG12-Nov-2021 11:08 AMPlotted onTYPICAL SECTIONS
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
4
NORTH STREETHIGHLAND AVENUE201
202
203
204
205
PC +32.55 PT +80.65
200+00 LCONST B
PROP SAWCUT (TYP)
PROP VGC;
TYPE VB (TYP)
MEET EXIST GC & SW
ADJ WG
RET UP
ADJ WG MEET EXIST
CONC WALK
MEET EXIST CONC WALK
PROP CEM CONC CURB
RAMP W/ DETECTABLE
WARNING PANEL (TYP)
MEET EXIST GC & SW
ADJ CB
PROP 5.5' CEM CONC SW (TYP)
RET WOOD
FENCE
REM HEDGE
APPROX. LOG (TYP)
PROJECT BEGIN
STA 200+10
N2946236.4404
E350562.6579
PROP TEMP EASEMENT (TYP)
PROP SAWCUT &
HMA TO MATCH
EXIST DWY (TYP)
PROP CEM CONC SIDEWALK
THROUGH DWY (TYP)
RET HYD
RET TREE
PROP TREE
PROTECTION FENCE
PROP FULL DEPTH PVMT
MEET EXIST GC
ADJ WG
PARSONS STREET
1
2 3
1 2
3
4
5
RET CONC WALK
PROP PERM EASEMENT
PROP PERM
EASEMENT
=CEM CONC WHEELCHAIR RAMP
=DRIVEWAY NUMBER
=PEDESTRIAN CURB RAMP NUMBER
#
#
=DRAINAGE STRUCTURE NUMBER#
PROP 4" LOAM & SEED (TYP)
RET LANDSCAPE AREA
RET LANDSCAPE
AREA
PROP 3" REVEAL
S46°03'06"E
132.55'
S33°55'45"
E
276.98'
Δ=12°07'20"
R =70 0.00'
L=148.10'
T=74.33'
RET HEDGENN
A
D
8
3
CONSTRUCTION NOTES:
1.EXISTING CONDITIONS INFORMATION COMPILED FROM AN ON-THE-GROUND INSTRUMENT SURVEY PERFORMED BY SHERMAN & FRYDRYK LLC, IN MAY, 2020
HORIZONTAL DATUM = NAD83 (MASSACHUSETTS STATE PLANE COORDINATES)
VERTICAL DATUM = NAVD88
2.THE CONTRACTOR SHALL CONTACT DIGSAFE (1-888-DIGSAFE) A MINIMUM OF 72 HOURS PRIOR TO ANY CONSTRUCTION TO VERIFY THE LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND SHALL BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
3.WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR, AND THE
INFORMATION FURNISHED TO THE ENGINEER FOR RESOLUTION OF THE CONFLICT.
4.ALL MUNICIPALLY OWNED UTILITY STRUCTURES (CATCH BASINS, DRAIN MANHOLES, WATER GATES, ETC.) SHALL BE ADJUSTED BY THE CONTRACTOR TO FINISHED GRADE UNLESS DIRECTED OTHERWISE.
5.ALL PRIVATELY OWNED UTILITY STRUCTURES (GAS GATES, ELECTRIC /TELEPHONE MANHOLES, ETC.) SHALL BE ADJUSTED TO FINISHED GRADE BY THE PRIVATE UTILITY COMPANY, UNLESS DIRECTED OTHERWISE. THE CONTRACTOR
SHALL COORDINATE WITH PRIVATE UTILITY COMPANIES FOR THE ALTERATION AND ADJUSTMENT, AS NECESSARY.
6.AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTORS EXPENSE.
7.THE TERM "PROPOSED" (PROP) MEANS WORK TO BE CONSTRUCTED USING NEW MATERIALS OR, WHERE APPLICABLE, RE-USING EXISTING MATERIALS IDENTIFIED AS "REMOVE AND RESET" (R&R), AS APPROVED BY THE ENGINEER.
8.ANY UTILITY STRUCTURE WITHIN THE PROPOSED OR EXISTING ACCESSIBLE SURFACE SHALL BE ADJUSTED TO BE FLUSH WITH THE CURB RAMP SURFACE CONTINUED ONSHEET NO. 6T1006.01_HD5(CONSTRUCTION PLANS).DWG11-Nov-2021 1:58 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS - 1 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
5
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE BELOW
DRAINAGE DETAILS
NONE
PARSONS STREET
LINDEN STREETWALNUT STREETCHERRY STREET205
206
207
208 209 210 211
PC +57.63
PT +60.43
LCONST B
PROP SAWCUT (TYP)
PROP VGC;
TYPE VB (TYP)
MEET EXIST BERM & SW
ADJ SMH
RET BOLLARDS
RET GAS METERS
ADJ DMH
ADJ CB
MEET EXIST BERM & SW
MEET BACK OF WALK AT
EXIST STAIRCASE
PROP BACK SW VGC
MEET EXIST
CONC WALK
REM HEDGE
MEET EXIST BERM & SW
RET TREES
PROP CEM CONC CURB RAMP
W/ DETECTABLE WARNING PANEL (TYP)
APPROX. LOG (TYP)
PROP 3" REVEAL
PROP TEMP EASEMENT (TYP)
PROP SAWCUT & HMA TO
MATCH EXIST DWY (TYP)
PROP GRAVEL
DWY)
PROP 5.5' CEM CONC
SIDEWALK
PROP PERM EASEMENT (TYP)
PROP CEM CONC SIDEWALK
THROUGH DWY (TYP)
RET HEDGE
PROP TEMP TREE
PROTECTION FENCE
PROP FULL DEPTH PVMT
ADJ GG (BO)
ADJ SMH
ADJ DMH4
5 6
7
86789
PROP FULL DEPTH PVMT
1
=CEM CONC WHEELCHAIR RAMP
=DRIVEWAY NUMBER
=PEDESTRIAN CURB RAMP NUMBER
#
#
=DRAINAGE STRUCTURE NUMBER#
S42°36'14"E
391.21'
Δ=8°40'29"
R=2000.00'
L=302.81'
T=151.69'
RET SHRUBSNN
A
D
8
3
PROPOSED DRAINAGE STRUCTURE DATA
NO.TYPE STATION OFFSET RIM ELEV.INV. ELEV. IN INV. ELEV. OUT REMARKS
1 REMOD CB 206+13.8 10.0' RT 132.43 -128.10CONTINUED ONSHEET NO. 5CONTINUED ONSHEET NO. 7T1006.01_HD5(CONSTRUCTION PLANS).DWG11-Nov-2021 1:59 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS - 2 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
6
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE BELOW
PARSONS STREET
CHERRY STREETUNION STREETPARSONS STREET211 212 213 214 215 216217PC +51.64
PC +95.81
PC +76.07
PT +11.98
PT +97.90
LCONST B
PROP SAWCUT (TYP)
PROP VGC;
TYPE VB (TYP)
MEET EXIST BERM
& SW
RET WOOD FENCE
MEET CONC WALK
R&S FENCE
ADJ DMH
ADJ CB
REM HEDGE
RET HYD
MEET EXIST BERM & SW
MEET EXIST GC & SW
PROP CEM CONC CURB RAMP W/ DETECTABLE
WARNING PANEL (TYP)
MEET EXIST GC & SW
ADJ CB
RET WOOD FENCE
APPROX. LOG (TYP)
PROJECT END
STA 216+70
N2945130.6497
E351666.4446
PROP CURB STOP W/ SERVICE BOX;
REM EXIST
PROP 5.5' CEM CONC
SIDEWALK
PROP 4" LOAM & SEED (TYP)
PROP SAWCUT & HMA TO MATCH EXIST DWY (TYP)
PROP GRAVEL DWY
MEET EXIST SW & GC
PROP CEM CONC SW
THROUGH DWY (TYP)
PROP LANDSCAPE AREA; REM EXIST PAVEMENT
MEET CONC WALK
PROP FULL DEPTH PVMT
REM SHRUBS
PROP AMUR MAPLE TREE
ADJ WG
ADJ GG (BO)
PROP CURB STOP
W/ SERVICE BOX;
REM EXIST
8 9 10
11
13
12
10 11 12
RET HYD
PROP PERM
EASEMENT (TYP)
PROP TEMP
EASEMENT (TYP)
=CEM CONC WHEELCHAIR RAMP
=DRIVEWAY NUMBER
=PEDESTRIAN CURB RAMP NUMBER
#
#
=DRAINAGE STRUCTURE NUMBER#
PROP PERM EASEMENT
PROP HMA DWY
PROP GRASS LANDSCAPE AREA;
REM EXIST PAVEMENT
PROP 5' CEM CON SW
S41°27'20"E
183.82'N54°58'49"E78.17'Δ=1°08'55"
R =3 010.00'
L=60.34'
T=30.17'Δ=83°33'51"R =70.00'L=102.09'T=62.55'PROP TEMP
EASEMENT (TYP)NN
A
D
8
3
CONTINUED ONSHEET NO. 6T1006.01_HD5(CONSTRUCTION PLANS).DWG11-Nov-2021 2:00 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS - 3 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
7
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE BELOW
DRAINAGE DETAILS
SEE BELOW
CONTINUED ON
SHEET NO. 9
NNAD 83
DDD1
1
1
11
2
113 114 115
116 117PC
+
0
9
.
7
4
PT +99.94
BRIDGE STREET
POME
R
O
Y
T
E
R
R
A
C
E
2
1
8PRC +44
.17
PROP 6' CEM
CONC MEDIAN
PROP CEM CONC CURB RAMP W/
DETECTABLE WARNING PANEL (TYP)
MEET EXIST VGC
RET UP
PROP 8'-12" RCP
PROP RRFB (TYP)
MEET EXIST VGC
MEET EXIST WALK
PROP VGC;
TYPE VB (TYP)
APPROX. LOG (TYP)
LIMIT OF WORK
STA 112+20
N2944712.3407
E351872.8182
PROP SAWCUT (TYP)
PROP 4" LOAM & SEED (TYP)
LCONST BPROP LIMIT OF FULL
DEPTH PVMT
PROP LIMIT OF FULL
DEPTH PVMT
PROP GAS LINE
RELOCATION (BO)
PROP RAISED CROSSWALK
(SEE DETAIL ON SHEET 31)
PROP FULL
DEPTH PVMT
PROP CEM CONC SIDEWALK
THROUGH DWY
PROP SAWCUT & HMA TO
MEET EXIST DWY
PROP TEMP
EASEMENT
PROP TREE
PROTECTION FENCE
BRIDGE STREET
14
15
16
17
13
ADJ DMH
ADJ WGADJ WG
PROP 2'-12" RCP
PROP 14'-12" RCP PARSONS STREET
2
3
5 6
7
4
8
PROP 2'-12" RCP
APPROX LOG (TYP)
MEET
EXIST GC
SAWCUT & MEET EXIST
SIDEWALK
MEET
EXIST GC
PROP 4" LOAM &
SEED (TYP)
SAWCUT & MEET EXIST
SIDEWALK & GC
=CEM CONC WHEELCHAIR RAMP
=DRIVEWAY NUMBER
=PEDESTRIAN CURB RAMP NUMBER
#
#
=DRAINAGE STRUCTURE NUMBER#
MEET EXIST SW
NOTE: SEE SHEETS 32-35 FOR CURB RAMP & DRIVEWAY DETAILS
PROP PLANT PROTECTION FENCE
PROP PLANT PROTECTION FENCE Δ=6°30
'13
"
.00'L=68.10
'T=34.09
'Δ=11°
4
4
'
27
"R=30
0
.00
'
L=61
.47
'T=30.
8
5
'
N0°59'52"E
750.06'
Δ=48
°
2
6
'
0
3
"
R=225.00'L=19
0
.
2
0
'
T=10
1
.
2
0
'
RET EXIST LEVEL
LANDING
RET EXIST LEVEL LANDING
PROPOSED DRAINAGE STRUCTURE DATA
NO.TYPE STATION OFFSET RIM ELEV.INV. ELEV. IN INV. ELEV. OUT REMARKS
2 PROP CB 112+31.1 62.3' RT 138.32 -134.30
3 PROP DMH 112+31.7 67.8' RT 138.26 134.20
MATCH EXIST (EX)MATCH EXIST CONNECT TO EXIST
PVC
4 PROP CB 112+16.3 88.9' RT 138.05 -134.35
5 PROP DMH 112+25.7 100.7'
RT 138.02
134.00 (4)
134.00(6)
MATCH EXIST (EX)
MATCH EXIST CONNECT TO EXIST
PVC
6 PROP CB 112+29.9 100.6'
RT 137.98 -134.10
7 PROP CB 112+57.5 53.4' RT 138.05 -134.05
8 PROP DMH 112+65.3 59'.1 RT 138.92 133.80 (7)
MATCH EXIST (EX)MATCH EXIST CONNECT TO EXIST
PVC T1006.01_HD5(CONSTRUCTION PLANS).DWG12-Nov-2021 2:59 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS - 4 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
8
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE BELOW
DRAINAGE DETAILS
SEE BELOW
CONTINUED ONSHEET NO. 9
NNAD 83
117 118 119
2
1
8
219PC +75.60PT
+
0
5
.
6
5
PT +00.80PRC +44
.17219+40.63PROP CEM CONC CURB RAMP W/
DETECTABLE WARNING PANEL (TYP)
PROP VGC; TYPE VB (TYP)
REM CURB
MEET EXIST VGC & SW
PROP SAWCUT (TYP)
MEET EXIST VGC & SW
PROP 5' CEM CONC SW
BRIDGE STREETPARSONS STREET
18
19
LIMIT OF WORK
STA 218+68
N2945244.9199
E351827.5126
=CEM CONC WHEELCHAIR RAMP
=DRIVEWAY NUMBER
=PEDESTRIAN CURB RAMP NUMBER
#
#
=DRAINAGE STRUCTURE NUMBER#
MEET EXIST SW
LIMIT OF WORK
STA 118+62
N2945352.3276
E351898.0194N4
9
°
4
4
'
3
5
"E
6
9
.
9
5
'S89°00'08"E39.83'T=34.09
'Δ=1
1
°
4
4
'
27
"R=300.
0
0
'L=6
1
.
4
7
'T=30.85
'
Δ=41°15'17"
R=35.00'
L=25.20'
T=13.17'
N0°59'52"E
750.06'T1006.01_HD5(CONSTRUCTION PLANS).DWG11-Nov-2021 2:01 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS - 5 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
9
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
CONTINUED ONSHEET NO. 8CONTINUED ON
SHEET NO. 7
PC +7
7
.
6
4
PC +99.09
PT +37.68
301
302
303 304 305
306
RET UP
PROP HMA TO MEET
EXIST DWY
MEET EXIST SW
& VGC
MEET EXIST SW
& VGC
PROP TEMP
EASEMENTPROP CEM
CONC DWY
PROP VGC;
TYPE VB (TYP)
PROP SAWCUT (TYP)
LIMIT OF WORK
STA 304+31
N2943573.5332
E351621.2873
PROP 5' CEM
CONC SW
PROP 4" LOAM & SEED
LIMIT OF WORK
STA 305+35
N2943497.5894
E351692.3405
PROP GCC (TYP)
HAWLEY STREET
14
=CEM CONC WHEELCHAIR RAMP
=DRIVEWAY NUMBER
=PEDESTRIAN CURB RAMP NUMBER
#
#
=DRAINAGE STRUCTURE NUMBER#
RET BERMBUTLER PLACEPHILLIPS PLACES43°05'40"E
361.41'
Δ=18°20'22
"
R =5 0 0 .0 0 '
L=160.04'
T=80.71'
Δ=8°11'05"
R=1000.00'
L=142.85'
T=71.55'
REM BERM ALONG SW
PROP 10' CEM
CONC SW
RET BIKE RACKNN
A
D
8
3
CONTINUED ONSHEET NO. 11T1006.01_HD5(CONSTRUCTION PLANS).DWG11-Nov-2021 2:02 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS - 6 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
10
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
PC +
7
9
.
8
7
PC +06.41
PT +93.85
PT +53.69
PT +13.11
316+66
.
1
7
HAWLEY STREETISABELLA STREETHOLYOKE STREETMEET EXIST
BERM & SW
LCONST B
PROP VGC;
TYPE VB (TYP)
RET UPADJ CB
RET UP
RET UP &
GUY WIRE
R&R USPS MB
IN PLACE (BO)
RET UP
ADJ WG
LIMIT OF WORK
STA 316+24
N2942515.3110
E352105.0031
LIMIT OF WORK
STA 312+70
N2942852.4220
E352001.9425
PROP CEM CONC SIDEWALK
THROUGH DWY (TYP)
PROP TEMP
EASEMENT (TYP)
ADJ CB
ADJ WG
PROP 5'
CEM CONC SW
312
313
314 315
316
PROP CEM CONC
SW THROUGH DWY
PROP HMA DWY (TYP)
PROP
SAWCUT (TYP)
PROP 5.5' CEM CONC SW
PROP CEM CONC DWY
MEET EXIST
BERM & SW
PROP 4" LOAM & SEED
15
16 18 1917
PROP 4" LOAM & SEED
APPROX. LOG (TYP)PROP 4" LOAM & SEED
=CEM CONC WHEELCHAIR RAMP
=DRIVEWAY NUMBER
=PEDESTRIAN CURB RAMP NUMBER
#
#
=DRAINAGE STRUCTURE NUMBER#
PROP
AMUR MAPLE
TREE (TYP)
S4°3
1
'
4
1
"
E
86.02
'
S21°26'51"E
152.72'
S9°13'1
4
"
E
53.06'
Δ=16°55'10
"
R=250.00'L=73.83'
T=37.18'
Δ=12°13'37
"
R=500.00'L=106.70'
T=53.55'
RET HEDGENNA
D
8
3
T1006.01_HD5(CONSTRUCTION PLANS).DWG11-Nov-2021 2:02 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLANS - 7 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
11
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE BELOW
DRAINAGE DETAILS
SEE BELOW
CONTINUED ONSHEET NO. 10
NAVD 88
BASE ELEV
100.00
BRIDGE STREET
110
120
130
140
150
100
110
120
130
140
150
111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00
EXISTING GROUND
LIMIT OF WORK
STA 112+20
N2944712.3407
E351872.8182
LIMIT OF WORK
STA 118+62
N2945352.3276
E351898.0194
STA 117+67.08 BRIDGE STREET =
STA 219+40.63 PARSONS STREET =
NAVD 88
BASE ELEV
110.00
PARSONS STREET
120
130
140
150
110
120
130
140
150
199+50 200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00
EXIST GROUND
PROJECT BEGIN
STA 200+10
N2946236.4404
E350562.6579
NOTE: EXISTING GROUND PROFILE PROVIDED FOR INFORMATIONAL PURPOSES ONLY.T1006.01_HD6(PROFILES).DWG11-Nov-2021 8:19 AMPlotted onPROFILES - 1 of 2
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
12
0
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
40 40 80
8 8 16CONTINUED ONSHEET NO. 13
NAVD 88
BASE ELEV
110.00
PARSONS STREET
120
130
140
150
110
120
130
140
150
210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00 219+00 220+00
EXIST GROUND
PROJECT END
STA 216+70
N2945130.6497
E351666.4446
STA 219+40.63 PARSONS STREET =
STA 117+67.08 BRIDGE STREET
NAVD 88
BASE ELEV
100.00
HAWLEY STREET
110
120
130
140
100
110
120
130
140
NAVD 88
BASE ELEV
100.00
HAWLEY STREET
110
120
130
140
100
110
120
130
140
304+00 305+00 306+00 312+00 313+00 314+00 315+00 316+00 317+00
EXIST GROUND
EXIST GROUND
NOTE: EXISTING GROUND PROFILE PROVIDED FOR INFORMATIONAL PURPOSES ONLY.
LIMIT OF WORK
STA 304+31
N2943573.5332
E351621.2873
LIMIT OF WORK
STA 305+35
N2943497.5894
E351692.3405
LIMIT OF WORK
STA 316+24
N2942515.3110
E352105.0031
LIMIT OF WORK
STA 312+70
N2942852.4220
E352001.9425 T1006.01_HD6(PROFILES).DWG11-Nov-2021 8:19 AMPlotted onPROFILES - 2 of 2
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
13
0
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
40 40 80
8 8 16CONTINUED ONSHEET NO. 12
NORTH STREETHIGHLAND AVENUE201
202
203
204
205
PC +32.55
PT +80.65
200+00
PROJECT BEGIN
STA 200+10
N2946236.4404
E350562.6579
L1
C1
L2
CONST BL
10.00'10.00'C2 C3PT
+25.30
10.00 RT
PC
+54.64
10.00 RT
PT
+64.60
20.96 RT
PC
+86.16
23.32 RT
PT
+01.06
10.00 RT
10.01 RT
PC
+10.29
25.11 RT
C1
(TO UPL 15)
28.53'
(TO UPL 16)
30.01'
(TO WG)
21.10'
(TO SMH 91)
28.43'
(TO WG)
48.68'(TO SMH 86)
48.14'(TO BL)
S52°41'19"W
8.10'
(TO SMH 85)
14.42'
(TO WG)
12.63'
(TO UPL 12)
20.03'
(TO BL)
S56°04'15"W
8.90'X138.31 X137.77 X137.64 X137.45
X136.74
X136.34
X135.42
X134.87
X134.37
X133.68
133.17
PARSONS STREET
X138.19
X139.13 X137.87 X137.51 X137.44 X136.87
X136.20
X135.51
X134.92
X134.19 X133.71
L25
L26
C31
+17.92
OFFSET: 29.27
+10.31
OFFSET: 29.32
+89.20
OFFSET: 33.30
+85.58
OFFSET: 32.89
+13.70
OFFSET: 27.67
+18.84
OFFSET: 27.31NN
A
D
8
3
PARSONS STREET CONSTRUCTION BASELINE DATA
NUMBER
L1
C1
L2
STARTING
STATION
200+00.00
201+32.55
202+80.65
NORTHING
2946243.378
2946151.389
2946038.132
EASTING
350555.461
350650.890
350745.891
CURVE DATA
R=700.00' Δ 12°07'20"
L=148.10' T=74.33'
LINE DATA
S46°03'06"E
132.55'
S33°55'45"E
276.98'
ENDING
STATION
201+32.55
202+80.65
205+57.63
NORTHING
2946151.389
2946038.132
2945808.317
EASTING
350650.890
350745.891
350900.491
CURVE TABLE
CURVE #
C1
C2
C3
DELTA
90° 20' 53"
95° 30' 57"
83° 34' 28"
RADIUS
15.00
10.00
15.00
LENGTH
23.65
16.67
21.88
TANGENT
15.09
11.01
13.41
PC STATION OFFSET PT STATION OFFSET
200+10.29
203+54.64
203+86.16
25.09
23.32
200+25.29
203+64.60
204+01.06
10.00
20.96
10.00
10.00
Survey Traverse Point Table
Point #
2139
2144
2150
Northing
2945967.292
2946076.623
2946273.493
Easting
350804.268
350728.269
350562.793
Elevation
135.010
136.910
139.590
Raw Description
MTRV MMAG SET
MTRV MMAG SET
MTRV MREB FD GPS 2508 CONTINUED ONSHEET NO. 15T1006.01_HD5(CURB TIE & GRADING PLANS).DWG11-Nov-2021 2:07 PMPlotted on20
SCALE: 1" = 20'
0 50 100
CURB TIE & GRADING PLANS - 1 OF 7
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
14
PARSONS STREET
LINDEN STREETWALNUT STREETCHERRY STREET205
206
207
208 209 210
211
PC +57.63
PT +60.43 L3
5
CONST BL
L4C2
10.00'10.00'C4 C5
C6
C7
C8
C9PC
+63.62
10.01 RT
PT
+73.44
21.07 RT
PC
+98.12
18.68 RT
PT
+07.94
10.00 RT
PC
+05.52
10.00 RT
PT
+15.40
21.53 RT
PC
+41.87
13.92 RT
PT
+46.75
10.00 RT
PC
+93.95
10.00 RT
PT
+98.95
15.16 RT
(TO WG)
11.20'
(TO UPL 10)
16.55'(TO SMH 74)
11.22'
(TO DMH 70)
21.21'
(TO SMH 68)
19.82'
(TO UPL 7.5)
5.62'
(TO BL)
S55°06'46"W
10.37'
(TO UPL 6)
15.50'
(TO DMH 64)
15.63'
(TO SMH 63)
11.35'
(TO BL)
S47°23'46"W
6.28'
(TO BL)
S47°37'48"W
7.88'X133.68
X133.17
X132.56
X132.53
X132.83
X133.12
X133.83 X134.21 X134.42 X134.71 X135.16 X135.38 X135.78X133.71
X133.29
X132.70
X132.62
X132.93 X133.33 X133.72 X134.06 X134.44 X134.79 X135.14 X135.42 X135.69
C32
+65.87
OFFSET: 23.95
+72.58
OFFSET: 24.70
+96.99
OFFSET: 27.42
+04.32
OFFSET: 28.40
+09.53
OFFSET: 29.19
+14.11
OFFSET: 29.95
+40.01
OFFSET: 22.29
+44.70
OFFSET: 23.34
+92.19
OFFSET: 23.80
+98.67
OFFSET: 23.80
CB
RIM= 132.44NN
A
D
8
3
CURVE TABLE
CURVE #
C4
C5
C6
C7
C8
DELTA
95° 47' 51"
82° 15' 07"
98° 42' 32"
77° 28' 27"
91° 50' 30"
RADIUS
10.00
10.00
10.00
5.00
5.00
LENGTH
16.72
14.36
17.23
6.76
8.01
TANGENT
11.07
8.73
11.65
4.01
5.16
PC STATION OFFSET PT STATION OFFSET
PARSONS STREET CONSTRUCTION BASELINE DATA
NUMBER
C2
L3
L4
STARTING
STATION
205+57.63
208+60.43
208+60.43
NORTHING
2945808.317
2945570.799
2945570.799
EASTING
350900.491
351087.847
351087.847
CURVE DATA
R=2000.00' Δ 8°40'29"
L=302.81' T=151.69'
LINE DATA
S42°36'14"E
391.21'
S42°36'14"E
391.21'
ENDING
STATION
208+60.43
212+51.64
212+51.64
NORTHING
2945570.799
2945282.847
2945282.847
EASTING
351087.847
351352.670
351352.670
10.01
205+98.12
209+05.52
209+41.87
10.00
205+73.44
206+07.94
209+15.40
209+46.75
210+98.95
205+63.62
18.68
10.00
13.92
210+93.95
21.07
10.00
21.53
10.00
15.16
Survey Traverse Point Table
Point #
2129
2131
2133
Northing
2945392.906
2945524.260
2945786.657
Easting
351259.986
351141.321
350927.895
Elevation
135.760
134.650
132.620
Raw Description
MTRV MMAG SET
MTRV MMAG SET
MTRV MMAG SETCONTINUED ONSHEET NO. 14CONTINUED ONSHEET NO. 16T1006.01_HD5(CURB TIE & GRADING PLANS).DWG11-Nov-2021 2:08 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
15
CURB TIE & GRADING PLANS - 2 OF 7
PARSONS STREET
CHERRY STREETUNION STREETPARSONS STREET211
212 213 214
215 216217PC +51.64
PC +95.81
PC +76.07
PT +11.98
PT +97.90
PROJECT END
STA 216+70
N2945130.6497
E351666.4446
L5 L6CONST BL L7C3
C4
10.00'C8
C9 C10 C11
C13
PC
+93.95
10.00 RT
PT
+98.95
15.16 RT
PC
+23.35
14.18 RT
PT
+28.28
10.00 RT
PC
+58.77
10.00 RT
PT
+68.77
20.24 RT
PC
+94.73
28.86 RT
PT
+53.89
28.83 RT
(TO UPL 6)
15.50'
(TO DMH 64)
15.63'
(TO SMH 63)
11.35'
(TO BL)
S47°23'46"W
6.28'
PRC
+11.03
11.79 RT
PRC
+32.40
14.99 RT
C12
C14
PRC
+50.11
24.93 RT
(TO WG)
17.63'
(TO GG)
18.72'
(TO UPL 5)
21.59'
(TO BL)
S47°23'46"W
5.52'
(TO WG)
25.42'
(TO SMH 58)
25.62'
(TO UPL 3)
8.66'
(TO BL)
S37°16'55"W
6.70'X135.78 X135.96 X136.18 X136.64 X136.64 X136.81 X137.11 X137.53
X137.58 X137.51
X135.69 X136.00 X136.24 X136.38 X136.65 X136.84 X137.03 X137.27 X137.59 X137.39
+98.67
OFFSET: 23.80
+92.19
OFFSET: 23.80
+61.90
OFFSET: 34.69
+68.39
OFFSET: 34.86
+91.76
OFFSET: 89.98
+96.44
OFFSET: 90.25
+54.48
OFFSET: 29.32
+51.91
OFFSET: 36.48
C15
+59.70
OFFSET: 23.20
+61.68
OFFSET: 18.66
PC
+35.67
10.56 LT
PT
+52.12
10.95 LT
+22.78
OFFSET: 23.44
+06.23
OFFSET: 89.59
+25.57
OFFSET: 21.18
X138.98X138.67
X138.83X 139.01
X138.09X137.86X138.30X 138.26
X137.51X137.27 X137.53X137.64
(TO CB 55)
77.64'
(TO 2" TREE)
29.26'
(TO UPL 2)
46.37'
(TO BL)
N35°01'11"W
35.03'
+22.09
OFFSET: 10.97NN
A
D
8
3
PARSONS STREET CONSTRUCTION BASELINE DATA
NUMBER
L5
C3
L6
C4
L7
STARTING
STATION
208+60.43
212+51.64
213+11.98
214+95.81
215+97.90
NORTHING
2945570.799
2945282.847
2945238.028
2945100.258
2945089.274
EASTING
351087.847
351352.670
351393.067
351514.764
351607.397
CURVE DATA
R=3010.00' Δ 1°08'55"
L=60.34' T=30.17'
R=70.00' Δ 83°33'51"
L=102.09' T=62.55'
LINE DATA
S42°36'14"E
391.21'
S41°27'20"E
183.82'
N54°58'49"E
78.17'
ENDING
STATION
212+51.64
213+11.98
214+95.81
215+97.90
216+76.07
NORTHING
2945282.847
2945238.028
2945100.258
2945089.274
2945134.133
EASTING
351352.670
351393.067
351514.764
351607.397
351671.415
CURVE TABLE
CURVE #
C8
C9
C10
C11
C12
C13
C14
C15
DELTA
91° 50' 30"
86° 38' 19"
91° 29' 09"
83° 38' 28"
21° 01' 42"
23° 45' 41"
14° 59' 39"
26° 46' 33"
RADIUS
5.00
5.00
10.00
20.00
70.00
60.12
25.00
30.00
LENGTH
8.01
7.56
15.97
29.20
25.69
24.93
6.54
14.02
TANGENT
5.16
4.71
10.26
17.89
12.99
12.65
3.29
7.14
PC STATION OFFSET PT STATION OFFSET
14.18 211+28.28211+23.35 10.00
10.00 214+68.77214+58.77 20.24
28.83 215+11.03214+94.73 11.73
215+50.11 24.93
215+52.89 28.83
10.00 210+98.95210+93.95 15.16
215+11.03 11.73 215+32.40 14.99
215+32.40 14.99
215+50.11 24.93
215+52.12 10.95215+35.67 10.56
Survey Traverse Point Table
Point #
2039
2119
2121
2129
Northing
2945080.620
2945096.235
2945301.113
2945392.906
Easting
351656.090
351528.884
351343.369
351259.986
Elevation
137.940
137.510
136.250
135.760
Raw Description
MTRV MDHL SET
MTRV MMAG SET
MTRV MMAG SET
MTRV MMAG SETCONTINUED ONSHEET NO. 15T1006.01_HD5(CURB TIE & GRADING PLANS).DWG11-Nov-2021 2:09 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
16
CURB TIE & GRADING PLANS - 3 OF 7
CONTINUED ON
SHEET NO. 18
NNAD 83
DDD1
1
1
11
2
113 114 115 116 117PC
+
0
9
.
7
4
PT +99.94
BRIDGE STREET
POME
R
O
Y
T
E
R
R
A
C
E
2
1
8PRC +44
.17
LIMIT OF WORK
STA 112+20
N2944712.3407
E351872.8182
C5
L8N
4
9
°
2
5
'
5
5
"
E
7
4
9
.
9
3
'
CONST BL 16.95'17.09'22.04
'
C16
C17
C18
C19
PC
+22.44
80.28 RT
PT
+30.35
64.48 RT
PT
+57.53
53.59 RT
PC
+44.82
83.39 RT
PC
+99.20
2.83 LT
PT
+99.27
3.17 RT
PT
+43.36
2.67 RT
PC
+43.27
3.33 LT
(TO DMH 43)
40.49'
(TO BL)
S89°00'08"E
33.65'
(TO SMH 41)
42.98'
(TO UPL 15)
11.04'X138.32X138.38
X138.42X 138.57
X138.20X138.26
(TO UPL 12)
90.32'
(TO HYD)
4.36'
(TO BL)
S89°00'08"E
31.64'
(TO UPL 14)
23.90'X138.85 X138.71 X138.67 X138.61 X138.43 X138.30 X138.12
+18.26
OFFSET: 85.76
+14.30
OFFSET: 91.23
+24.86
OFFSET: 107.13
+28.31
OFFSET: 106.81
+29.94
OFFSET: 109.55
+61.18
OFFSET: 69.83+62.62
OFFSET: 73.14
+57.78
OFFSET: 50.61
+70.72
OFFSET: 22.22
+20.10
OFFSET: 25.90
+17.68
OFFSET: 20.00
+38.24
OFFSET: 20.00
+26.94
OFFSET: 30.31 +31.94
OFFSET: 30.36
+25.31
OFFSET: 2.88
+35.31
OFFSET: 2.76
+35.24
OFFSET: 3.24
+25.24
OFFSET: 3.12
+39.82
OFFSET: 19.71
+21.59
OFFSET: 19.83
+33.49
OFFSET: 40.83
+28.49
OFFSET: 40.73
PROP CB
RIM= 138.32
PROP DMH
RIM= 138.26
PROP CB
RIM= 138.05
PROP CB
RIM= 137.98
PROP DMH
RIM= 138.01
PROP DMH
RIM= 138.92
PROP CB
RIM= 138.05
OFFSET: 26.41
+02.27
OFFSET: 26.49
X138.24 X138.34X138.28
X138.17
BRIDGE STREET - 1 CONSTRUCTION BASELINE DATA
NUMBER
C5
L8
STARTING
STATION
111+09.74
112+99.94
NORTHING
2944623.355
2944790.354
EASTING
351809.595
351888.232
CURVE DATA
R=225.00' Δ 48°26'03"
L=190.20' T=101.20'
LINE DATA
N0°59'52"E
750.06'
ENDING
STATION
112+99.94
120+50.00
NORTHING
2944790.354
2945540.299
EASTING
351888.232
351901.293
CURVE TABLE
CURVE #
C16
C17
C18
C19
DELTA
28° 49' 40"
50° 26' 15"
180° 00' 00"
180° 00' 00"
RADIUS
38.00
40.00
3.00
3.00
LENGTH
19.12
35.22
9.42
9.42
TANGENT
9.77
18.84
INFINITY
INFINITY
PC STATION OFFSET PT STATION OFFSET
112+30.35 64.48112+22.44 80.28
112+57.53 53.59
114+99.20
83.39
114+99.27 3.17
112+44.82
2.83
115+43.36 2.67115+43.27 3.33
Survey Traverse Point Table
Point #
2040
2043
Northing
2945024.263
2944880.092
Easting
351858.655
351858.147
Elevation
138.640
138.890
Raw Description
MTRV MMAG SET
MTRV MMAG SET T1006.01_HD5(CURB TIE & GRADING PLANS).DWG12-Nov-2021 3:05 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
CURB TIE & GRADING PLANS - 4 OF 7
CONTINUED ONSHEET NO. 1817
NNAD 83
117 118
2
1
8
219PC +75.60PT
+
0
5
.
6
5
PT +00.80PRC +44
.17219+40.63C20
C21
L9 L32PC
+75.83
10.92 LT
PRC
+87.35
10.66 LT
PT
+20.15
59.10 LT11.00'(TO HYD)
50.36'(TO UPL 17)
51.48'
(TO UPL 19)
72.66'
(TO BL)
S1°10'57"E
28.43'
+68.21
OFFSET: 11.00
PC
+68.21
16.50 LT
PT
+01.53
49.17 LT
+07.17
OFFSET: 49.11
+07.97
OFFSET: 26.41
+02.27
OFFSET: 26.49
20.50'LIMIT OF WORK
STA 218+68
N2945244.9199
E351827.5126
LIMIT OF WORK
STA 118+62
N2945352.3276
E351898.0194
C30
C31
C32
PRC
+90.06
28.32 LT
PRC
+96.57
35.99 LT
BRIDGE STREET - 1 CONSTRUCTION BASELINE DATA
NUMBER
L9
STARTING
STATION
112+99.94
NORTHING
2944790.354
EASTING
351888.232
CURVE DATA LINE DATA
N0°59'52"E
750.06'
ENDING
STATION
120+50.00
NORTHING
2945540.299
EASTING
351901.293
CURVE TABLE
CURVE #
C20
C21
C30
C31
C32
DELTA
70° 17' 51"
21° 37' 14"
24° 11' 48"
42° 50' 18"
67° 00' 13"
RADIUS
55.00
40.00
80.00
20.00
15.00
LENGTH
67.48
15.09
33.78
14.95
17.54
TANGENT
38.72
7.64
17.15
7.85
9.93
PC STATION OFFSET PT STATION OFFSET
PARSONS STREET CONSTRUCTION BASELINE DATA
NUMBER
L32
STARTING
STATION
219+00.80
NORTHING
2945258.115
EASTING
351856.539
CURVE DATA LINE DATA
S89°00'08"E
39.83'
ENDING
STATION
219+40.63
NORTHING
2945257.421
EASTING
351896.366
218+87.35 10.66218+75.83 10.93
219+20.15 59.10218+87.35 10.66
Survey Traverse Point Table
Point #
2036
Northing
2945286.532
Easting
351854.620
Elevation
137.310
Raw Description
MTRV MMAG SET
218+90.06 28.32218+68.21 16.50
218+96.57 35.99218+90.06 28.32
219+01.53 49.17218+96.57 35.99 T1006.01_HD5(CURB TIE & GRADING PLANS).DWG11-Nov-2021 2:10 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
18
CURB TIE & GRADING PLANS - 5 OF 7
CONTINUED ONSHEET NO. 17CONTINUED ON
SHEET NO. 16
PC +99.09
303 304 305
306
CONST BL
LIMIT OF WORK
STA 304+31
N2943573.5332
E351621.2873
LIMIT OF WORK
STA 305+35
N2943497.5918
E351692.3382
12.00'L11
(TO UPL 7)
41.67'
(TO SMH 113)
24.83'
(TO BL)
N46°54'20"E
19.61'
(TO UPL 8)
25.81'X127.23 X128.16 X128.14X127.41
+31.31
OFFSET: 12.00
+31.32
OFFSET: 23.13
+82.30
OFFSET: 28.31
+07.58
OFFSET: 28.75
+34.98
OFFSET: 23.00
+35.01
OFFSET: 11.93NN
A
D
8
3
HAWLEY STREET CONSTRUCTION BASELINE DATA
NUMBER
L11
STARTING
STATION
302+37.68
NORTHING
2943714.702
EASTING
351489.210
CURVE DATA LINE DATA
S43°05'40"E
361.41'
ENDING
STATION
305+99.09
NORTHING
2943450.787
EASTING
351736.129
Survey Traverse Point Table
Point #
2077
Northing
2943494.711
Easting
351668.174
Elevation
128.720
Raw Description
MTRV MMAG SET CONTINUED ONSHEET NO. 20T1006.01_HD5(CURB TIE & GRADING PLANS).DWG11-Nov-2021 2:11 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
19
CURB TIE & GRADING PLANS - 6 OF 7
PC +
7
9
.
8
7
PC +06.41
PT +93.85
PT +53.69
PT +13.11
316+66
.
1
7
HAWLEY STREETISABELLA STREETHOLYOKE STREETLIMIT OF WORK
STA 312+70
N2942852.4220
E352001.9425
312
313
314 315
316
CONST BL
12.00'12.00'C22
C23
C24 C25
C26 C27
C28
C29PC
+23.50
25.50 RT PT
+26.49
OFFSET: 24.96
PC
+85.73
22.08 RT
PT
+88.73
25.15 RT
PT
+29.47
23.09 RT
PC
+26.63
25.15 RT
PT
+66.06
19.98 RT
PC
+69.06
22.98 RT
PT
+98.61
19.63 RT
PC
+95.64
22.98 RT
PC
+24.45
19.21 RT PT
+26.01
20.71 RT
PC
+41.47
20.71 RT
PT
+43.03
19.21 RT
(TO DMH 100)
37.78'(TO BL)
N73°57'43"E
22.80'
(TO UPL 15)
16.35'
(TO WG)
61.41'
L10
L12
L13
C7
C8(TO UPL 16)
69.41'
(TO DMH 98)
52.27'
(TO UPL 17)
16.41'
(TO BL)
N68°33'09"E
13.73'
PC
+42.94
19.61 RT
PT
+44.33
17.50 RTX124.83
X124.52 X123.57 X123.09 X123.06
X123.56
X124.26X125.12
X124.45 X123.76
X123.39 X123.44
X123.85 X124.16
LIMIT OF WORK
STA 316+24
N2942515.3124
E352105.0029
+71.98
OFFSET: 11.45
+70.88
OFFSET: 20.35
+70.88
OFFSET: 24.70
+23.87
OFFSET: 15.90
+24.00
OFFSET: 12.00
+87.86
OFFSET: 19.50NNA
D
8
3
HAWLEY STREET CONSTRUCTION BASELINE DATA
NUMBER
L10
C7
L12
C8
L13
STARTING
STATION
311+93.85
312+79.87
313+53.69
315+06.41
316+13.11
NORTHING
2942928.334
2942842.586
2942770.910
2942628.767
2942526.060
EASTING
351995.931
352002.722
352019.253
352075.095
352103.258
CURVE DATA
R=250.00' Δ 16°55'10"
L=73.83' T=37.18'
R=500.00' Δ 12°13'37"
L=106.70' T=53.55'
LINE DATA
S4°31'41"E
86.02'
S21°26'51"E
152.72'
S9°13'14"E
53.06'
ENDING
STATION
312+79.87
313+53.69
315+06.41
316+13.11
316+66.17
NORTHING
2942842.586
2942770.910
2942628.767
2942526.060
2942473.682
EASTING
352002.722
352019.253
352075.095
352103.258
352111.761
CURVE TABLE
CURVE #
C22
C23
C24
C25
C26
C27
C28
C29
DELTA
19° 11' 38"
75° 34' 50"
91° 26' 51"
91° 48' 49"
90° 00' 00"
90° 43' 40"
89° 49' 11"
89° 49' 13"
RADIUS
10.00
2.00
3.00
3.00
3.00
3.00
1.50
1.50
LENGTH
3.35
2.64
4.79
4.81
4.71
4.75
2.35
2.35
TANGENT
1.69
1.55
3.08
3.10
3.00
3.04
1.50
1.50
PC STATION OFFSET PT STATION OFFSET
313+26.49 24.96313+23.50 25.50
313+44.33 17.50313+42.94 19.61
313+88.73 25.15313+85.73 22.08
314+29.47 23.09314+26.63 25.15
314+69.06 22.98314+66.06 19.98
314+98.61 19.63314+95.64 22.98
315+26.01 20.71315+24.45 19.21
315+43.03 19.21315+41.47 20.71
Survey Traverse Point Table
Point #
2103
2107
Northing
2942786.955
2942652.967
Easting
351989.760
352050.834
Elevation
125.220
123.430
Raw Description
MTRV MMAG SET
MTRV MMAG FD GPS 2502 T1006.01_HD5(CURB TIE & GRADING PLANS).DWG11-Nov-2021 2:16 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
20
CURB TIE & GRADING PLANS - 7 OF 7
CONTINUED ONSHEET NO. 19
PARSONS S
T
R
E
E
TNORTH STREETHIGHLAND AVENUE200+00
PROJECT BEGIN
STA 200+10
N2946236.4404
E350562.6579
PC +32.55
PT +80.65
201
202
203
204
205
R1-1
10' CW
R&S
R&S
R&S
RET
RET10' CW12" SLMA-D3-1a(2)
R7-112" SLR1-1
R&D
RETNN
A
D
8
3
CONTINUED ONSHEET NO. 22T1006.01_HD6(TSPM).DWG11-Nov-2021 1:44 PMPlotted on20
SCALE: 1" = 20'
0 50 100
TRAFFIC SIGN & PAVEMENT MARKING PLANS - 1 OF 6
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
21
PARSONS STREET
LINDEN STREETWALNUT STREETCHERRY STREETPC +57.63
PT +60.43
205
206
207
208 209 210 211
R1-1
R1-1
10' CW10' CW
10' CW
RET
RET
R&R TO NEW POST
R&S
R&R
R&R
R&R
12" SL
12" SL
12" SL
R&D
R&R TO NEW POST
R&R
R&R
R7-1NN
A
D
8
3
CONTINUED ONSHEET NO. 21CONTINUED ONSHEET NO. 23T1006.01_HD6(TSPM).DWG11-Nov-2021 1:44 PMPlotted on20
SCALE: 1" = 20'
0 50 100
TRAFFIC SIGN & PAVEMENT MARKING PLANS - 2 OF 6
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
22
PARSONS STREET
CHERRY STREETUNION STREETPARSONS STREETPROJECT END
STA 216+70
N2945130.6497
E351666.4446
PC +51.64 PC +95.81
PC +76.07
PT +11.98
PT +97.90
211 212 213 214 215 216217ERADICATE EXISTING PAVEMENT
MARKINGS CONFLICTING W/
PROP MARKINGS (TYP)
R1-1
1
2
"
S
L
10' CW 10
'
CW
10' CW
R&S
R&R ON NEW POLE
R&R
R&S
R&S
R&R ON NEW POST
R&S
R&R
R&S 6" DBYLR&S
RET
R1-1
R1-3P 12" SL12" SL 12" SL
R2-1(20)
S4-1P
S4-3P
S4-6P
R1-1
R1-3P
MA-D3-1b(2)
R1-1
R1-3P
R&R
R&S
R&S
S5-2
6" SWL 6" DBYLMA-D3-1c
R7-1
R7-201aP
R&S
R7-1
R2-1(25)
R&R ON NEW POST
R&R ON NEW POLE
RETNN
A
D
8
3
CONTINUED ONSHEET NO. 22T1006.01_HD6(TSPM).DWG11-Nov-2021 1:45 PMPlotted on20
SCALE: 1" = 20'
0 50 100
TRAFFIC SIGN & PAVEMENT MARKING PLANS - 3 OF 6
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
23
CONTINUED ON
SHEET NO. 25
NNAD 83
PC
+
0
9
.
7
4
PT +99.94
BRIDGE STREET 5'11'1'6'1'11'5'±LIMIT OF WORK
STA 112+20
N2944712.3407
E351872.8182
POME
R
O
Y
T
E
R
R
A
C
E
LCONST B
12" SYL @1:1,
10' O.C.
BRIDGE STREETPARSONS S
TREE
TPRC +44
.17
1
1
1
11
2
113 114 115 116 117
2
1
8
S1-1 (2)
W16-7pL
W16-7pR
R10-25
S1-1(2)
W16-7pL
W16-7pR
R10-25
W1-10R
ERADICATE EXIST MARKINGS
CONFLICTING W/ PROP
MARKINGS (TYP)
REMOVE EXIST
FLASHING SIGN,
FOUNDATIONS &
ELEC METER
REMOVE EXIST
FLASHING SIGN,
FOUNDATIONS & ELEC
METER FROM APPROX
STA 110+40
PROP W1-10L
(INSTALL AT STA
110+40, RT)
W11-2 (2)
W16-7pL
W16-7pR
W11-2 (2)
W16-7pL
W16-7pR
ERADICATE EXIST
MARKINGS
ERADICATE EXIST
MARKINGS
PROP RRFB (TYP)
(SEE DETAILS ON SHEET 31)
PROP SPEED HUMP MARKINGS
(SEE DETAIL ON SHEET 31)
W17-1
W13-1P (25)
W17-1
W13-1P (25)
R&S
R&S
R&S
R&R
R&S
R&S
R&S
RET
R&S
R&S
R&S
RET
6"DWLEX 6" SWL
6" SWL
6" SYL 10'CW10'CWR&S
R&S
6" DBYL
6" DBYL
R&S
12"
S
L
6" DBYLMEET EXIST
PAVEMENT MARKING
R&R
R&R
MEET EXIST
PAVEMENT MARKING
RET
RET
R&R
R&R
R&R
R1-1
R7-1
MA-D3-1c (2)
RET
RET RET
RET
RET
MEET EXIST
PAVEMENT MARKINGS T1006.01_HD6(TSPM).DWG11-Nov-2021 1:45 PMPlotted on20
SCALE: 1" = 20'
0 50 100
TRAFFIC SIGN & PAVEMENT MARKING PLANS - 4 OF 6
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
24
CONTINUED ONSHEET NO. 25
NNAD 83
219+40.63BRIDGE STREETPARSONS S
TREE
T
PC +75.60PT
+
0
5
.
6
5
PT +00.80
117 118 119
2
1
8
219R1-1
R&S
R&S
10'CW
12" SL
6
"
DBY
L
LIMIT OF WORK
STA 218+68
N2945244.9199
E351827.5126
LIMIT OF WORK
STA 118+62
N2945352.3276
E351898.0194
R&R
R&R
R&R
RET
MA-D3-1c (2)T1006.01_HD6(TSPM).DWG11-Nov-2021 1:46 PMPlotted on20
SCALE: 1" = 20'
0 50 100
TRAFFIC SIGN & PAVEMENT MARKING PLANS - 5 OF 6
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
25
CONTINUED ONSHEET NO. 24CONTINUED ON
SHEET NO. 23
PC +
7
9
.
8
7
PC +06.41
PT +93.85
PT +53.69
PT +13.
1
1
316+66
.
1
7
HAWLEY STREETISABELLASTREET
HOLYOKE STREETLIMIT OF WORK
STA 316+24
N2942515.3110
E352105.0031
LIMIT OF WORK
STA 312+70
N2942852.4220
E352001.9425
312
313
314 315
316
R&S
R&S
R&S R7-1
RET
RET
RET
RET
R7-1
R7-1NNA
D
8
3
T1006.01_HD6(TSPM).DWG11-Nov-2021 1:46 PMPlotted on20
SCALE: 1" = 20'
0 50 100
TRAFFIC SIGN & PAVEMENT MARKING PLANS - 6 OF 6
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.-609515
26
TRAFFIC SIGN SUMMARY
IDENTIFICATION
NUMBER
SIZE OF SIGN (in)TEXT DIMENSIONS (in)NUMBER OF
SIGNS
REQUIRED
COLOR NUMBER OF
POSTS REQUIRED
UNIT AREA
(SF)
TOTAL AREA
(SF)
WIDTH HEIGHT LEGEND LETTER
HEIGHT
VERTICAL
SPACING
ARROW RTE.
MKR BACK- GROUND LEGEND BORDER
S1-1 36 36 1 4 FLUORESCENT
YELLOW GREEN BLACK BLACK MOUNT ON RRFB PAID UNDER ITEM 824.221
S4-1P 24 10 1 WHITE BLACK BLACK 1 1.67 1.67
S4-3P 24 8 1 FLUORESCENT
YELLOW GREEN BLACK BLACK MOUNT W/ S4-1P 1.33 1.33
S4-6P 24 10 1 WHITE BLACK BLACK MOUNT W/ S4-1P 1.67 1.67
S5-2 24 30 1 WHITE BLACK BLACK 1 5.00 5.00
R1-1 30 30 10 RED WHITE WHITE 10 6.25 62.50
R1-3P 18 6 3 RED WHITE BLACK MOUNT W/ R1-1 0.75 2.25
R2-1(20)24 30 1 WHITE BLACK BLACK MOUNT W/ S4-1P 5.00 5.00
R2-1(25)24 30 1 WHITE BLACK BLACK 1 5.00 5.00
R7-1 12 18 8 WHITE RED RED 8 1.50 12.00
R7-201aP 12 6 1 WHITE RED RED MOUNT W/ R7-1 0.50 0.50
R10-25 9 12 2 WHITE BLACK BLACK MOUNT ON RRFB PAID UNDER ITEM 824.221
W1-10L 36 36 1 YELLOW BLACK BLACK 1 9.00 9.00
W1-10R 36 36 1 YELLOW BLACK BLACK 1 9.00 9.00
W11-2 30 30 4 YELLOW BLACK BLACK 2 6.25 25.00
W13-1P 18 18 2 YELLOW BLACK BLACK MOUNT W/ W17-1 2.25 4.50
W16-7pL 24 12
2
FLUORESCENT
YELLOW GREEN BLACK BLACK
MOUNT ON RRFB PAID UNDER ITEM 824.221
2 MOUNT W/ W11-2 2.00 4.00
W16-7pR 24 12
2
FLUORESCENT
YELLOW GREEN BLACK BLACK
MOUNT ON RRFB PAID UNDER ITEM 824.221
2 MOUNT W/ W11-2 2.00 4.00
W17-1 30 30 2 YELLOW BLACK BLACK 2 6.25 12.50
MA-D3-1a 27 12 SEE BELOW 6D / 4D 3
3 N/A 2 GREEN WHITE WHITE 1 PAID UNDER ITEM 874.
MA-D3-1b 18 12 SEE BELOW 6D / 4D 3
3 N/A 2 GREEN WHITE WHITE 1 PAID UNDER ITEM 874.
MA-D3-1c 24 12 SEE BELOW 6D/4D 3
3 N/A 3 GREEN WHITE WHITE
1
MOUNT 2 W/
MA-D3-1b
PAID UNDER ITEM 874.
MA-D3-1a MA-D3-1b MA-D3-1c T1006.01_HD6(TSPM).DWG11-Nov-2021 1:46 PMPlotted onNOTES:
1.SEE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR
STREETS AND HIGHWAYS FOR TEXT AND LEGEND DIMENSIONS.
2.THE MINIMUM MOUNTING HEIGHT OF POST-MOUNTED SIGNS, MEASURED
VERTICALLY FROM THE BOTTOM OF THE SIGN TO THE TOP OF
CURB OR SIDEWALK, OR THE ELEVATION OF THE NEAR EDGE OF TRAVEL
WAY, SHALL BE 7 FEET UNLESS OTHERWISE SPECIFIED.
3.A MINIMUM OF 3'-0" PATH OF TRAVEL CLEARANCE, EXCLUDING CURB, IS
REQUIRED WHEN PLACING SIGNS.
4.ALL SIGNS NOTED AS "R&R" SHALL BE MOUNTED ON NEW P5 POSTS
UNLESS OTHERWISE DETERMINED REUSABLE BY THE ENGINEER.
TRAFFIC SIGN SUMMARY
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.
-
609515
27
P/F
LEGEND:
REFLECTORIZED PLASTIC DRUM
OR 36" CONE
POLICE/FLAGGER DETAIL
TYPE III BARRICADE
CHANGEABLE MESSAGE SIGN
ARROW BOARD
TEMPORARY TRAFFIC CONTROL NOTES:
1.ALL TEMPORARY TRAFFIC CONTROL WORK SHALL CONFORM TO THE LATEST EDITION OF THE "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD) AND ALL REVISIONS, UNLESS SUPERCEDED BY THESE PLANS.
2.ALL SIGN LEGENDS, BORDERS, AND MOUNTING SHALL BE IN ACCORDANCE WITH THE MUTCD.
3.TEMPORARY CONSTRUCTION SIGNING AND ALL OTHER TRAFFIC CONTROL DEVICES SHALL BE IN PLACE PRIOR TO
THE START OF ANY WORK.
4.TEMPORARY CONSTRUCTION SIGNING, BARRICADES, AND ALL OTHER NECESSARY WORK ZONE TRAFFIC
CONTROL DEVICES SHALL BE REMOVED FROM THE HIGHWAY OR COVERED WHEN THEY ARE NOT REQUIRED FOR
CONTROL OF TRAFFIC.
5.SIGNS AND SIGN SUPPORTS LOCATED ON OR NEAR THE TRAVELED WAY, CHANNELIZING DEVICES, BARRIERS,
AND CRASH ATTENUATORS MUST PASS THE CRITERIA SET FORTH IN THE "MANUAL FOR ASSESSING SAFETY
HARDWARE" (MASH).
6.CONTRACTORS SHALL NOTIFY EACH ABUTTER AT LEAST 24 HOURS IN ADVANCE OF THE START OF ANY WORK
THAT WILL REQUIRE THE TEMPORARY CLOSURE OF ACCESS, SUCH AS CONDUIT INSTALLATION, EXISTING
PAVEMENT EXCAVATION, TEMPORARY DRIVEWAY PAVEMENT PLACEMENT, AND SIMILAR OPERATIONS.
7.THE FIRST TEN PLASTIC DRUMS OF A TAPER SHALL BE MOUNTED WITH SEQUENTIAL FLASHING LIGHTS.
8.THE ADVISORY SPEED LIMIT, IF REQUIRED, SHALL BE DETERMINED BY THE ENGINEER.
9.DISTANCES ARE A GUIDE AND MAY BE ADJUSTED IN THE FIELD BY THE ENGINEER.
10.MAXIMUM SPACING OF TRAFFIC DEVICES IN A TAPER (DRUMS OR CONES) IS EQUAL IN FEET TO THE SPEED LIMIT
IN MPH.
11.MINIMUM LANE WIDTH IS TO BE 11 FEET UNLESS OTHERWISE SHOWN. MINIMUM LANE WIDTH TO BE MEASURED
FROM THE EDGE OF DRUMS OR MEDIAN BARRIER.
12.ALL SIGNS SHALL BE MOUNTED ON THEIR OWN STANDARD SIGN SUPPORTS.
WORK ZONE
DIRECTION OF TRAFFIC
IMPACT ATTENUATOR
MEDIAN BARRIER
MEDIAN BARRIER WITH
WORK VEHICLE
TRUCK MOUNTED ATTENUATOR
TRAFFIC OR PEDESTRIAN SIGNAL
SIGN
ROAD TYPE
DISTANCE BETWEEN SIGNS **
BA C
*
**
SUGGESTED WORK ZONE WARNING SIGN SPACING
ROAD TYPE TO BE DETERMINED BY MASSDOT OFFICE OF TRANSPORTATION PLANNING.
DISTANCES ARE SHOWN IN FEET. THE COLUMN HEADINGS A, B, AND C ARE THE DIMENSIONS SHOWN IN THE DETAIL/
TYPICAL SETUP FIGURES. THE A DIMENSION IS THE DISTANCE FROM THE TRANSITION OR POINT OF RESTRICTION TO
THE FIRST SIGN. THE B DIMENSION IS THE DISTANCE BETWEEN THE FIRST AND SECOND SIGNS. THE C DIMENSION IS
THE DISTANCE BETWEEN THE SECOND AND THIRD SIGNS. (THE "THIRD" SIGN IS THE FIRST ONE TYPICALLY
ENCOUNTERED BY A DRIVER APPROACHING A TEMPORARY TRAFFIC CONTROL (TTC) ZONE.)
THE "THIRD" SIGN ABOVE IS TYPICALLY REFERRED TO AS AN "ADVANCE WARNING" SIGN ON THE TTCP SETUPS. THESE
ADVANCE WARNING SIGNS ARE LOCATED PRIOR TO THE PROJECT LIMITS ON ALL APPROACHES (i.e. THE W20-1 SERIES
(ROAD WORK XX FT) SIGNS), AND USUALLY REMAIN FOR THE DURATION OF THE PROJECT. ADDITIONAL SIGNS (i.e.
"RIGHT LANE CLOSED 1 MILE" AND "LEFT LANE CLOSED 1 MILE") HAVE BEEN SHOWN IN SOME FIGURES AS EXAMPLES OF
REINFORCEMENT SIGN PLACEMENT BUT ARE USED IN RARE OCCASIONS.
THE FIRST AND SECOND WARNING SIGNS ABOVE ARE REFERRED TO AS THE OPERATIONAL (DAY-TO-DAY) WORK ZONE
SIGNS AND MAY BE MOVED DEPENDING ON WHERE THE SPECIFIC ROADWAY WORK FOR THAT DAY IS LOCATED.
MA-R2-10a SIGNS SHALL BE PLACED BETWEEN THE SECOND AND THIRD SIGNS AS DESCRIBED ABOVE.
MA-R2-10a, MA-R2-10e, AND W20-1 SERIES SIGNS ARE TO BE INCLUDED ON ALL DETAILS/TYPICAL SETUPS.
LOCAL OR LOW VOLUME
ROADWAYS*
MOST OTHER ROADWAYS*
FREEWAYS AND
EXPRESSWAYS*
350
500
1,000 1,500 2,640
350
500
350
500
WHERE:
MERGING TAPER
TYPE OF TAPER TAPER LENGTH (L)
SHIFTING TAPER
SHOULDER TAPER
ONE-LANE, TWO-WAY TRAFFIC TAPER
DOWNSTREAM TAPER
AT LEAST L
AT LEAST 0.5L
AT LEAST 0.33L
50 FT MIN. 100 FT MAX.
50 FT MIN. 100 FT MAX. PER LANE
TAPER LENGTH CRITERIA FOR TEMPORARY TRAFFIC CONTROL ZONES
40 MPH OR LESS
SPEED LIMIT (S)TAPER LENGTH (L)
FEET
45 MPH OR
MORE
L=
L=
WS
60
WS
FORMULAS FOR DETERMINING TAPER LENGTHS
L = TAPER LENGTH IN FEET
W = WIDTH OF OFFSET IN FEET
S = POSTED SPEED LIMIT, OR OFF-PEAK
85TH-PERCENTILE SPEED PRIOR TO
WORK STARTING, OR THE ANTICIPATED
OPERATING SPEED IN MPH
2
TYPICAL PEDESTRIAN DETAILS:
OPTIONAL 2-4 IN. WIDE CONTRAST EDGE MARKING
YELLOW NON-SLIP PROTECTION (TYP)
GRANITE CURB
6 IN REVEAL (TYP)
CLEAR SPACE
JOINT/GAP TREATMENT 60x60 IN. MIN.
TURNING AREA
PROTECTIVE EDGING
2 IN. MIN. HEIGHT
DETECTABLE EDGING
6 IN. MIN. HEIGHT
1 IN.
12 IN. MIN.
GRANITE CURB
6 IN REVEAL (TYP)
JOINT/GAP TREATMENT
PROTECTIVE EDGING
2 IN. MIN. HEIGHT
12 IN.
M
I
N
.
1 IN.
2.0
%
SL
O
P
E
M
A
X
PROTECTIVE EDGE
YELLOW NON-SLIP
PROTECTION (TYP)
DETECTABLE
WARNING PANEL
DETECTABLE
WARNING PANEL
NOTES:
1.WHEN EXISTING PEDESTRIAN FACILITIES ARE DISRUPTED, CLOSED, OR RELOCATED IN A
TTC ZONE, TEMPORARY FACILITIES SHALL BE PROVIDED AND THEY SHALL BE
DETECTABLE AND INCLUDE ACCESSIBILITY FEATURES CONSISTENT WITH THE
FEATURES PRESENT IN THE EXISTING PEDESTRIAN FACILITY.
2.A PEDESTRIAN CHANNELIZING DEVICE THAT IS DETECTABLE BY A PERSON WITH A
VISUAL DISABILITY TRAVELING WITH THE AID OF A LONG CANE SHALL BE PLACED ALONG
THE FULL LENGTH OF THE TEMPORARY PEDESTRIAN ROUTE.
3.WHEN USED, TEMPORARY RAMPS SHALL COMPLY WITH AMERICANS WITH DISABILITIES
ACT.
4.THE ALTERNATE PATHWAY SHOULD HAVE A SMOOTH CONTINUOUS HARD SURFACE FOR
THE ENTIRE LENGTH OF THE TEMPORARY PEDESTRIAN FACILITY.
5.THE TEMPORARY SIDEWALK SHOULD BE A MINIMUM OF 4 FEET WIDE. IF THE SIDEWALK
EXCEEDS 200 FEET THEN A 5 FOOT BY 5 FOOT PASSING ZONE SHALL BE PROVIDED
NEAR THE MIDPOINT OF THE CLOSURE.
6.THE PROTECTIVE REQUIREMENTS OF A TTC WORK ZONE MAY HAVE AN IMPACT IN
DETERMINING THE NEED FOR TEMPORARY TRAFFIC BARRIERS AND THEIR USE IN
PROVIDING PEDESTRIAN DELINEATION SHOULD BE BASED ON ENGINEERING
JUDGEMENT.
7.ON-DEMAND PEDESTRIAN ASSISTANCE PERSONNEL TO ASSIST WITH NAVIGATION
AROUND THE CLOSURE/WORK AREA MAY BE CONSIDERED AS AN OPTION IN PLACE OF
PROVIDING ADA/AAB DEVICES FOR WORK CLOSURES LASTING 4 HOURS OR LESS.
8.CONTROLS ONLY FOR PEDESTRIAN TRAFFIC ARE SHOWN; VEHICULAR TRAFFIC SHOULD
BE HANDLED AS SHOWN ELSEWHERE. THESE DETAILS ARE USED IN CONJUNCTION WITH
THE PROPOSED LANE CLOSURE DETAILS AND DURING CONSTRUCTION STAGING, AS
DETERMINED BY THE ENGINEER.
WARNING LIGHTS
TEMPORARY CURB RAMP PARALLEL TO CURB
TEMPORARY CURB RAMP-PERPENDICULAR TO CURB
2" MIN.
TYPICAL PEDESTRIAN DEVICES:
3:1 MAX SLOPE INTO GUTTER
WITHOUT EDGE PROTECTION
GROUND SURFACE
CURB
LANDING
PORTABLE
WALKWAY
DETECTABLE EDGING
DETECTABLE WARNING PANEL
WORK ZONE AREA (CLOSED)
TURNING
AREA
EXISTING SIDEWALK
AREA48 IN MIN
48 IN MIN
HIGH CONTRAST
COLOR ON ALL
NON-SKID ADA
COMPLIANT
SURFACES
(TYP)
VARIES VARIES 48 IN MIN ***
LANDING
AREA
CURB
RAMPSEE NOTE #10
BELOW
EXISTING SURFACE
PORTABLE WALKWAY
TEMPORARY CURB RAMP
48 IN MIN LANDING AREA
DETECTABLE EDGE
GROUND SURFACE
CURB
EXISTING SIDEWALK
TURNING AREA
6 IN MAX
OR TEMPORARY PEDESTRIAN FACILITY
12:1
* LANDING
AREA
VARIES.
* -LANDING AREA USED TO OVERLAP NON-ADA COMPLIANT SURFACES.
**-DETECTABLE EDGE REMOVED IF A CONTINUOUS SIDEWALK.
*** -60 IN. IF AN OBSTRUCTION IS AT BACK OF SIDEWALK
**
TEMPORARY CURB RAMP-TYPE 2
OR DETECTABLE EDGE
48" MIN.
48"
48"
48"
48"
PEDESTRIAN
CHANNELIZING
DEVICE
TYPE III
BARRICADE
PEDESTRIAN BYPASS
OPTIONAL 2-4 IN. WIDE CONTRAST
EDGE MARKING
HAND-TRAILING EDGE
DETECTION PLATE***
2" GAP MIN.*
2" GAP MAX.**
32" MIN.
8" MIN. HEIGHT
NOTES:
THERE SHALL BE A 2 INCH GAP BETWEEN THE
HAND-TRAILING EDGE AND ITS SUPPORT.
A MAXIMUM 2 INCH GAP BETWEEN THE BOTTOM
OF THE BOTTOM RAIL AND THE SURFACE MAY BE
USED TO PROVIDE DRAINAGE.
**
*
CROSS SECTION VIEW
THE HAND-TRAILING EDGE AND DETECTION
PLATE SHALL BE CONTINUOUS THROUGHOUT THE
LENGTH OF THE PATH SUCH THAT A PEDESTRIAN
***
USER WITH A LONG CANE CAN FOLLOW IT.
***
PEDESTRIAN CHANNELIZING DEVICE
DRUMS/CONES
PEDESTRIAN
CHANNELIZING
DEVICE T1006.01_HD8(TEMPORARY TRAFFIC CONTROL PLANS).DWG11-Nov-2021 8:28 AMPlotted onTYPICAL PEDESTRIAN DEVICE NOTES:
-DETAIL I IS CONSIDERED AN EXAMPLE OF A SHORT TERM CLOSURE AND PEDESTRIAN ASSISTANCE {PERSONEL) TO NAVIGATE
AROUND THE CLOSURE/WORK AREA COULD BE CONSIDERED AS AN OPTION IN PLACE OF PROVIDING ADA/AAB DEVICES. DETAIL II
IS CONSIDERED AN EXAMPLE OF A LONG TERM CLOSURE THAT WOULD REQUIRE ADDITIONAL ADA/AAB COMPLIANT
DEVICES. IF A SIDEWALK CLOSURE OR RESTRICTION LASTS FOR MORE THAN ONE {1) WORK SHIFT THEN ADA/AAB COMPLIANCE
SHALL BE FOLLOWED.
-WHEN EXISTING PEDESTRIAN FACILITIES ARE DISRUPTED, CLOSED, OR RELOCATED IN A TIC ZONE, TEMPORARY FACILITIES SHALL
BE PROVIDED AND THEY SHALL BE DETECTABLE AND INCLUDE ACCESSIBILITY FEATURES CONSISTENT WITH THE FEATURES
PRESENT IN THE EXISTING PEDESTRIAN FACILITY.
-A PEDESTRIAN CHANNELIZING DEVICE THAT IS DETECTABLE BY A PERSON WITH A VISUAL DISABILITY TRAVELING WITH THE AID OF
A LONG CANE SHALL BE PLACED ACROSS THE FULL WIDTH OF THE CLOSED SIDEWALK.
-WHEN USED, TEMPORARY RAMPS SHALL COMPLY WITH AMERICANS WITH DISABILITIES ACT {SEE FIGURES PED-1 & PED-2).
-THE ALTERNATE PATHWAY SHOULD HAVE A SMOOTH CONTINUOUS HARD SURFACE FOR THE ENTIRE LENGTH OF THE
TEMPORARY PEDESTRIAN FACILITY.
-THE TEMPORARY SIDEWALK SHOULD BE A MINIMUM OF 4 FEET WIDE. IF THE SIDEWALK EXEEDS 200 FEET THEN A 5 FOOT BE 5
FOOT PASSING ZONE SHALL BE PROVIDED.
-THE PROTECTIVE REQUIREMENTS OF A TIC WORK ZONE MAY HAVE AN IMPACT IN DETERMINING THE NEED FOR TEMPORARY
TRAFFIC BARRIERS AND THEIR USE IN PROVIDING PEDESTRIAN DELINEATION SHOULD BE BASED ON ENGINEERING JUDGMENT .
-CONTROLS ONLY FOR PEDESTRIAN TRAFFIC ARE SHOWN; VEHICULAR TRAFFIC SHOULD BE HANDLED AS SHOWN ELSEWHERE.
THESE DETAILS ARE USED IN CONJUNCTION WITH THE PROPOSED LANE CLOSURE DETAILS AND DURING CONSTRUCTION
STAGING, AS DETERMINED BY THE ENGINEER.
-AUDIBLE INFORMATION DEVICES SHOULD BE CONSIDERED WHERE MIDBLOCK CLOSINGS AND CHANGED CROSSWALK AREAS
CAUSE INADEQUATE COMMUNICATION TO BE PROVIDED TO PEDESTRIANS WHO HAVE VISUAL DISABILITIES.
-EXISTING AUDIBLE DEVICES NO LONGER APPLICABLE DUE TO CONSTRUCTION SHALL BE DISABLED.
AUDIBLE DEVICES
-FOR LONG TERM SIDEWALK CLOSURES {AT A MINIMUM OVERNIGHT) A FORM OF SPEECH MESSAGING FOR PEDESTRIANS WITH
VISUAL DISABILITIES SHALL BE PROVIDED. AUDIBLE INFORMATION DEVICES SUCH AS DETECTABLE BARRIERS OR BARRICADES AND
OTHER PASSIVE PEDESTRIAN ACTIVATION {MOTION ACTIVATED) DEVICES SHOULD BE CONSIDERED FOR THESE CASES. THESE
AUDIBLE DEVICES CAN BE MOUNTABLE OR STAND ALONE.
TEMPORARY TRAFFIC CONTROL PLANS - 1 OF 3
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
28
SINGLE LANE APPROACH
CORNER CLOSURE
A
A
A
P
MA-W20-7b
ONE LANE ALTERNATING
TRAFFIC
B
B
W20-4
B
100 FT MAX.
POLICE
OFFICER
AHEAD
ONE LANE
ROAD
XXX
W20-4
ONE LANE
ROAD
XXX
MA-W20-7b
POLICE
OFFICER
AHEAD
MA-W20-7b
POLICE
OFFICER
AHEAD
W20-4
ONE LANE
ROAD
XXX
P
100 FT MAX.
100 FT MAX.
* THIS DELINEATION CAN BE REMOVED
TO INCREASE CAPACITY OF THE
INTERSECTION. POLICE OFFICER CAN
BE REMOVED AS WELL
P*
SIDEWALK
CLOSED
TEMPORARY MARKING FOR CROSSWALK
LINES (CR0SS-HATCHING OPTIONAL)
300 FT
300 FT
NOTE:
FOR LONG-TERM STATIONARY WORK, THE DOUBLE
YELLOW CENTERLINE AND/OR LANE LINES SHOULD BE
REMOVED BETWEEN THE CROSSWALK LINES.
SIDEWALK CLOSED
CROSS HERE
AHEAD
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
PEDESTRIAN
DETOUR
B A
WORK
ZONE BUFFER A BL/2DOWNSTREAM
TAPER
100 FT MAX
W5-1
ROAD
NARROWS
W1-4R
W5-1
ROAD
NARROWS
W1-4R
W1-4L
L/2
W1-4L
BUFFER
L/3
TWO LANE ROAD SHOULDER
AND TRAVEL LANE CLOSED
WORK
ZONE100FT MAX.
100FT
MAX.
BUFFER
100-150FT
MA-W20-7b
POLICE
OFFICER
AHEAD
W20-4
W13-1p
ONE LANE
ROAD
XXX
XX
M.P.H.
W20-4
W13-1p
ONE LANE
ROAD
XXX
XXMA-W20-7b
POLICE
OFFICER
AHEAD
P/F
P/F
A B
AB
M.P.H.
TWO LANE ROAD ONE LANE
ALTERNATING TRAFFIC
B
W5-1W21-5a
RIGHT
SHOULDER
CLOSED
ROAD
NARROWS
AWORK ZONE
100 FT
BUFFER L/3100 FT
TWO LANE ROAD
SHOULDER CLOSED
R9-9
R9-11aR
R9-11aL
SIDEWALK CLOSED
CROSS HERE
SIDEWALK CLOSED
CROSS HERE
SIDEWALK
CLOSED
SIDEWALK CLOSED WITHOUT
DETOUR
SIDEWALK CLOSED
CROSS HERE
AHEAD
PARKING LANES CLOSED
EXISTING SIDEWALK
EXISTING SIDEWALK
TEMPORARY
CROSSWALKTEMPORARY
CROSSWALK
WORK ZONE TO BE
ENCLOSED BY FENCING
TYPE III BARRICADE
PEDESTRIAN PATH
W11-2
W16-7pL
W11-2,W16-7pL
R9-11aR
TEMPORARY NO
PARKING SIGN
TEMPORARY NO
PARKING SIGN
W11-2,W16-7pL
W11-2
W16-7pL
SIDEWALK CLOSED
CROSS HERE
SIDEWALK CLOSED
CROSS HERE
1
4
24" (MIN.)
REFLECTORIZED
DRUM
TRAVEL WAY
WORK AREA
* - INCREASE SLOPE RATIO
FOR HIGHER SPEEDS
NOT TO SCALE
Depth≥4"
LATERAL DROP-OFF DETAIL
NOT TO SCALE
LIMIT OF EXCAVATION
TEMPORARY BIT.
CONC. PAVEMENT
GRAVEL BORROW/SUBBASE
DIRECTION OF TRAFFIC
* - INCREASE SLOPE RATIO
FOR HIGHER SPEEDS
12*
1
EXIST.
PAVEMENT
W8-3
OR
W8-24
OR
W8-15
A
W8-1
LONGITUDINAL DROP-OFF DETAIL
PEDESTRIAN
BYPASS
T1006.01_HD8(TEMPORARY TRAFFIC CONTROL PLANS).DWG11-Nov-2021 8:28 AMPlotted onTEMPORARY TRAFFIC CONTROL PLANS - 2 OF 3
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
29
C
B
A 1000'500'B
A 1000'500'C
B
A
A
C
C
N
OPERATIONAL
SIGNING
OPERATIONAL
SIGNING
BRIDGE STREET (ROUTE 9)
HAWLEY STREET
POMEROY TERRACE
PLEASANT STREET
C
C
C
A
C
B AC
BA
B
B
B
B
A
A
A
A
MARKET STREET
C
B
D
C
B
APARSONS S
TREET
B
A
C
B
A
D
A
F
F
E
C
TEMPORARY TRAFFIC CONTROL SIGN SUMMARY
IDENTIFICATIO
N NUMBER
SIZE OF SIGN (in)TEXT DIMENSIONS (in)COLOR NUMBER OF
SIGNS
REQUIRED
UNIT AREA
(SF)
TOTAL
AREA (SF)
WIDTH HEIGHT LEGEND LETTER
HEIGHT
VERTICA
L
SPACING
ARROW
RTE.
MKR
BACK-
GROUND LEGEND BORDER
MA-R2-10a 48 36 MASSDOT STANDARD SIGN
FL.
ORANGE
WHITE
BLACK
BLACK
BLACK
BLACK 13 12.00 156.00
MA-R2-10e 36 48
FL.
ORANGE
WHITE
BLACK
BLACK
BLACK
BLACK 13 12.00 156.00
R9-9 24 12
SEE 2009 MANUAL ON
UNIFORM TRAFFIC CONTROL
DEVICES FOR STREETS AND
HIGHWAYS
WHITE BLACK BLACK 2 2.00 4.00
R9-10 24 12 WHITE BLACK BLACK 2 2.00 4.00
R9-11L 24 18 WHITE BLACK BLACK 1 3.00 3.00
R9-11R 24 18 WHITE BLACK BLACK 1 3.00 3.00
R9-11aL 24 12 WHITE BLACK BLACK 1 2.00 2.00
R9-11aR 24 12 WHITE BLACK BLACK 1 2.00 2.00
W1-4L 36 36 FL.
ORANGE BLACK BLACK 2 9.00 18.00
W1-4R 36 36 FL.
ORANGE BLACK BLACK 2 9.00 18.00
W5-1 36 36 FL.
ORANGE BLACK BLACK 2 9.00 18.00
W8-3 36 36 FL.
ORANGE BLACK BLACK 1 9.00 9.00
W8-15 36 36 FL.
ORANGE BLACK BLACK 1 9.00 9.00
W8-24 36 36 FL.
ORANGE BLACK BLACK 1 9.00 9.00
W11-2 30 30 FL.
ORANGE BLACK BLACK 4 6.25 25.00
W13-1p 24 24 FL.
ORANGE BLACK BLACK 2 4.00 8.00
W16-7pL 24 12 FL.
ORANGE BLACK BLACK 2 2.00 4.00
W16-8p 23 8 FL.
ORANGE BLACK BLACK 2 1.28 2.56
W16-9p 24 12 FL.
ORANGE BLACK BLACK 2 2.00 4.00
W20-1 36 36 FL.
ORANGE BLACK BLACK 15 9.00 135.00
W20-4 36 36 FL.
ORANGE BLACK BLACK 3 9.00 27.00
MA-W20-7b 36 36 MASSDOT STANDARD SIGN FL.
ORANGE BLACK BLACK 3 9.00 27.00
W21-5a 36 36
SEE 2009 MANUAL ON
UNIFORM TRAFFIC CONTROL
DEVICES FOR STREETS AND
HIGHWAYS
FL.
ORANGE BLACK BLACK 1 9.00 9.00
M5-1L 21 15 FL.
ORANGE BLACK BLACK 2 2.19 4.38
M5-1R 21 15 FL.
ORANGE BLACK BLACK 3 2.19 6.56
STEEL
PLATE
AHEAD T1006.01_HD8(TEMPORARY TRAFFIC CONTROL PLANS).DWG11-Nov-2021 8:28 AMPlotted onADVANCE SIGNING SCHEMATIC
N.T.S.
LEGEND
A B C
W20-1 MA-R2-10a MA-R2-10e
TEMPORARY TRAFFIC CONTROL PLANS - 3 OF 3
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
30
NOTE: "B" & "C" SIGNS ON SIDE-STREETS SHALL BE PLACED
APPROXIMATELY 50' FROM PARSONS STREET, AND "A" SIGNS SHALL BE
PLACED APPROXIMATELY 150' FROM PARSONS STREET. "D","E" & "F"
SIGNS SHALL BE PLACED DIRECTLY UNDERNEATH A SIGNS AS MARKED
ABOVE.
W16-8
D E F
M5-1L M5-1R
12"
4'STOP LINE (WHITE)(WHERE SHOWN)NOTES:
1.ALL 12" LINES SHALL BE APPLIED IN ONE APPLICATION, NO COMBINATION OF
LINES (TWO - 6" LINES) WILL BE ACCEPTED.
2.LAYOUT OF CROSSWALKS SHALL BE APPROVED BY THE ENGINEER PRIOR
TO APPLICATION.
3.CROSSWALK BARS SHALL BE PLACED OUTSIDE THE VEHICULAR WHEEL
PATH WHEREVER POSSIBLE.VARIESVARIES2'-0" MAX2'-0"2'-0"24" THERMOPLASTIC
WHITE LINE (TYP)
CURBLINE
CURBLINE
DOUBLE YELLOW
CENTER LINE
N.T.S.
CROSSWALK PAVEMENT MARKING
(SEE PLANS)
N.T.S.
GRANITE CURB TRANSITION TO HMA BERM
GRANITE CURB
GUTTER LINE
GRANITE TRANSITION CURB
TAPER HMA BERM FROM
EXISTING WIDTH TO 5"
WIDE TO MEET PROP GC
6'-0" (MIN) TRANSITI
O
N
6'-0" (MIN) TRANSITIO
N
EXISTING HMA BERM
* CONCRETE SHALL BE
INCLUDED IN PRICE BID FOR
VARIOUS GRANITE CURB
ITEMS FOR 6" OFFSET FROM
FACE OF CURB.
PROP GRANITE CURB W/ 6" REVEAL
TREATMENT VARIES (SEE PLANS)6"MIN6"
MIN
GRAVEL BASE COURSE
GUTTER LINE
6"
MIN
* CEMENT CONCRETE
SAWCUT
EXISTING PAVEMENT
HMA FOR PATCHING (MATCH
EXIST TOP COURSE THICKNESS)
N.T.S.
GRANITE CURB IN EXISTING PAVEMENT
NOTES:
1.FRAME AND COVER SHALL BE
RATED FOR HL-93 LOADING.
2.MATERIAL - CAST IRON.
3.MINIMUM FRAME WEIGHT:
4 FLANGE - 295 LB
3 FLANGE - 264 LB
2"2'-9"
1'-10"8"2'-0"
SECTION A-A
PLAN
11 4"114"AA
2'-9"N.T.S.
CATCH BASIN FRAME & GRATE (MUNICIPAL STANDARD)
2'-9"
CL
PROP PRECAST
CONICAL SECTION
(OR FLAT TOP SECTION)
EXIST CATCH
BASIN TAPER
MORTAR ALL
JOINTS
MATCH EXISTING
CATCH BASIN WALL
THICKNESS
N.T.S.
CATCH BASIN REMODEL
SOLAR PANEL ORIENTED FOR
OPTIMAL SUNLIGHT CAPTURE
NEMA ENCLOSURE FOR CONTROLLER
(SIZE MAY VARY)
S1-1 SIGN (TYP. SEE SPECIAL PROVISIONS)
(FACING EACH DIRECTION OF TRAFFIC)
DUAL RECTANGULAR YELLOW LED
BEACONS IN NEMA ENCLOSURE
(FACING EACH DIRECTION OF TRAFFIC)
W16-7P SIGN
(FACING EACH DIRECTION OF TRAFFIC)
R10-25 SIGN
APS PUSHBUTTON
TRAFFIC SIGNAL
POST & PEDESTAL
ADA COMPLIANT
SURFACE
CONTRACTOR SHALL USE 4'-0" MIN.
DEPTH FOUNDATION SIMILAR TO
MASSDOT STANDARD SD3.010
(PRE-CAST OR CAST IN PLACE)
CURBTRAVEL WAY
1.5%*
(MAX)15' (TYP)10" (MAX) FOR SIDE REACH
SEE DETAIL A
2' (MIN) TO
FACE OF CURB
<6' (RECOMMENDED)
<10' (MAX) TO FACE OF CURB
1" (MAX) x 45° CHAMFER (TYP)7' (MIN)5'1'-8"
DETAIL A: DUAL YELLOW BEACON
NOTES:
1.CROSSWALK AND ADA-COMPLIANT RAMPS NOT SHOWN. SEE PLANS FOR
LOCATIONS.
2.REFER TO THE SPECIAL PROVISIONS FOR SIGN DIMENSIONS.
3.ACCESS TO ALL PEDESTRIAN ACTUATED CONTROLS SHALL BE ADA/AAB
COMPLIANT
4.*0.5% CONSTRUCTION TOLERANCE FOR CROSS-SLOPE
2" (MIN)PILOT LIGHT
(IF REQUIRED)
5"
(MIN)7"
(MIN)
5"
(MIN)
MAJOR ITEMS LIST
2 CEMENT CONCRETE FOUNDATIONS PER 812.30.1
2 15' TRAFFIC SIGNAL POSTS & PEDESTALS
2 APS PUSHBUTTON SYSTEMS
4 DUAL RECTANGULAR YELLOW LED BEACONS IN NEMA ENCLOSURES
2 R10-25 SIGNS
4 S1-1SIGNS
2 W16-7PR SIGNS
2 W16-7PL SIGNS
2 SOLAR PANEL SYSTEMS
2 NEMA ENCLOSURES FOR ALL COMPONENTS NEEDED TO MEET FUNCTIONAL REQUIREMENTS
PER SPECIAL PROVISIONS
2 BATTERY SYSTEMS
PLUS ALL MOUNTING AND SUPPORTING HARDWARE AND WIRING NECESSARY TO COMPLETE
A WORKING SYSTEM.
N.T.S.
RECTANGULAR RAPID FLASHING BEACON (RRFB)T1006.01_HD7(CONSTRUCTION DETAILS).DWG11-Nov-2021 8:28 AMPlotted on48" DIA. (MIN)
12"
24"
NOTES:
1.ALL SECTIONS SHALL BE
DESIGNED FOR HL-93
LOADING.
2.PROVIDE "V" KNOCKOUTS
FOR PIPES WITH 2" MAX
CLEARANCE TO OUTSIDE OF
PIPE. MORTAR ALL PIPE
CONNECTIONS.
3.JOINT SEALANT BETWEEN
PRECAST SECTIONS SHALL
BE PREFORMED BUTYL
RUBBER.
4.DRAIN MANHOLE FRAME AND
COVER SHALL BE SET IN
FULL MORTAR BED. ADJUST
TO GRADE WITH CLAY BRICK
AND MORTAR.
(2 COURSES TYP
5 COURSES MAX)
5.COPOLYMER MANHOLE
STEPS SHALL BE INSTALLED
AT 12" O.C. FOR THE FULL
DEPTH OF THE STRUCTURE.DIA.VARIES12"MONOLITHICBASE SECTIONRISERSECTION(S)AS REQ'D.ECCENTRICCONE SECTION(SEE ALT.TOP SLAB)8"8"
24" DIA.
ACCESS
48" DIA. (MIN)12"8"ALTERNATE TOP SLAB
COMPACTED GRAVEL
SEE NOTE 2
OUTLET
SHELF TO BE
CONCRETE
FORMED AT A
SLOPE OF 1" / FT
SEE NOTE 3
FINISH GRADE
STEPS
(SEE NOTE 5)
SEE NOTE 4
N.T.S.
DRAIN MANHOLE
NOTE:
ALL CATCH BASINS SHALL CONFORM TO MASSDOT CONSTRUCTION
STANDARD E 201.4.0 EXCEPT FOR 4' SUMP DEPTH AS SHOWN
RCP OUTLET
PIPE
4'-0"4'-0" MIN SUMPVARIESRISER SECTION
BASE SECTION
N.T.S.
DEEP SUMP CATCH BASIN 12"1"
118"
24"
34"
26"
3"
5"5"24"
26"
281 4"
8"
NOTES:
1.FRAME AND COVER SHALL BE RATED
FOR HL-93 LOADING.
2.MATERIAL - CAST IRON.
3.MINIMUM MASS - 265 LBS.
4.ALL MH FRAMES AND COVERS SHALL
BE ADA AND AAB COMPLIANT.
5.MANHOLE COVERS SHALL HAVE A
DIAMOND PATTERN, PICK HOLES, AND
THE WORD "DRAIN" OR "SEWER" CAST
IN 3-INCH LETTERS.
PLAN - FRAME
PLAN - COVER
SECTION - FRAME
N.T.S.
MANHOLE FRAME & COVER
PAVED AREA NON-ROADWAY AREA
DEPTH AND SURFACE
TREATMENT VARIES (SEE PLANS)
1
1
NOTES:
* EXISTING MATERIAL OBTAINED FROM EXCAVATION THAT IS DETERMINED TO BE SUITABLE,
AND APPROVED BY THE ENGINEER SHALL BE USED. BACKFILL SHALL BE PLACED IN LAYERS
NO MORE THAN 6" IN DEPTH AND THOROUGHLY COMPACTED. BACKFILLING TO A POINT 2'
OVER THE PIPE SHALL CONTAIN NO STONES LARGER THAN 3".
**SOFT OR UNSUITABLE MATERIAL EXISTING BELOW THE REQUIRED BEDDING GRADE SHALL BE
REMOVED AS DIRECTED AND REPLACED WITH SAND, GRAVEL, CRUSHED STONE OR OTHER
SUITABLE MATERIAL AND THOROUGHLY COMPACTED.
SAWCUT
CEMENT CONC
COMPACTED
SUBGRADE**
SURFACE VARIES
(SEE PVM'T NOTES)
D
EXISTING MATERIAL
SUITABLE FOR REUSE*
BOTTOM OF TRENCH
N.T.S.
UTILITY TRENCH
D + 3'
1' (TYP)8" GRAVEL
BORROW
(TYPE b)
SUPERPAVE INTERMEDIATE COURSE - 19.0
(SIC-19.0) COMPACTED IN 2" LIFTS TO
MATCH EXISTING PAVEMENT THICKNESS
MILLED
PAVEMENT
SURFACE
5" (MIN) CONC COVER
ABOVE & BELOW
N.T.S.
INLET PROTECTION SILT SACK IN CATCH BASIN
NOTES:
1.INSTALL SILT SACK IN EXISTING CATCH BASINS BEFORE COMMENCING WORK, AND
IN NEW CATCH BASINS IMMEDIATELY AFTER INSTALLATION OF STRUCTURE.
MAINTAIN UNTIL BINDER COURSE PAVING IS COMPLETE OR A PERMANENT STAND
OF GRASS HAS BEEN ESTABLISHED.
2.GRATE TO BE PLACED OVER SILT SACK.
3.SILT SACK SHALL BE INSPECTED PERIODICALLY AND AFTER ALL STORM EVENTS
AND CLEANING OR REPLACEMENT SHALL BE PERFORMED PROMPTLY AS NEEDED.
SILTSACK CATCH
BASIN
GRATE
EXPANSION
RESTRAINT
FLOW
CATCH
BASIN
GRATE
SILT SACK
FLOW
SECTION VIEW PLAN VIEW
CONSTRUCTION DETAILS - 1 OF 5
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
31
3"SECTION B-B
SECTION A-A
10'6'6'
ROAD SURFACE3"SOURCE:
MUTCD SECTION 3B.25 FIGURE 3B-30
NOTE:
SIGNS TO BE INSTALLED PER
MUTCD SECTION 2C.29
RAISED CROSSWALK SHALL BE
PAID FOR UNDER ITEM 450.23
LEGEND:
DIRECTION OF TRAVEL
10'6'6'6'
12"12'
12" WHITE LINE
(TYP)
A
A
B B
N.T.S.
SPEED TABLE (RAISED CROSSWALK)
CENTER OF
TRAVEL LANE
CENTER OF ROADWAY
DIRECTION OF TRAFFIC HOT MIX ASPHALT
SECTION
RAISED
CROSSWALK
ELEVATION
ROADWAY APPROACH ELEVATION
CURB LINE (0" REVEAL
AT WCR OPENING BACK OF
SIDEWALK
SOURCE:
ITE PROPOSED RECOMMENDED
PRACTICE, GUIDELINES FOR
THE DESIGN AND APPLICATION
OF SPEED HUMPS, 2007,
FIGURES 4.3 AND 4.7
PROPOSED
WHEELCHAIR
RAMP
(SEE DETAILS)
3' x 112" KEYWAY
AT PVMT
TRANSITION (TYP)
SECTION A-A
N.T.S.
PEDESTRIAN CURB RAMP TYPE E
LEGEND:
W =SIDEWALK WIDTH
W1 =PERPENDICULAR RAMP LENGTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR
CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT
WHEN FACING RAMP OPENING
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
7.5%*
ROADWAY
REFERENCE POINT C
RAMP OPENING
A
L
1.5%*
0" REVEAL
EDGE OF ACCESSIBLE ROUTE
SIDEWALK 1.5%*
SIDEWALK
1.
5
%
*
6" CURB
REVEAL (TYP)
6" CURB
REVEAL (TYP)
L
E
F
T
S
I
D
E
T
R
A
N
S
I
T
I
O
N
7.
5
%
*
7.5%*
3 4" CURB
REVEAL (TYP)
W
6"
Lw5'-
0
"
(
M
I
N
)
LE
V
E
L
1.5%*
A
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
CC = 4"
8"
SIDEWALK
FOUNDATIO
N
PLAIN CEMENT CONCRETE
0" REVEAL RIGH
T
SI
D
E
TRA
N
SI
TI
O
N
Ld
4'-0" (
MI
N)
N.T.S.
PEDESTRIAN CURB RAMP TYPE C
LEGEND:
W =SIDEWALK WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR
CONSTRUCTION ±0.5%
7.5%*
ROADWAY
LEVEL
ENTRANCE
1.5%*
SECTION A-A
SIDEWALK
FOUNDATI
O
N
CC = 4"
8"
HSLSIDEWALK
4.5%*
SIDEWALK
W
LOAM & SEED
1.5%*
TRA
N
SI
TI
O
N
3'-
0
"
(
M
I
N
)
EDGE OF ACCESSIBLE ROUTE
7.5%*
6"A
A
PLAIN CEMENT CONCRETE
4.5%*
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
L
LE
V
E
L
1.
5
%
*
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT
WHEN FACING RAMP OPENING
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
ROADWAY
GUTTER
SLOPE
TRANSITION
LENGTH
CURB
REVEAL
SIDEWALK
WIDTH
2 PARSONS STREET 203+63 14' RT 1.2%9'-0"0'-6"5'-0"
9 PARSONS STREET 211+24 14' RT 0.7%7'-8"0'-6"5'-0"
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
LEFT SIDE TRANSITION RIGHT SIDE
TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH
CURB
REVEAL
TRANSITION
LENGTH
CURB
REVEAL
1 PARSONS STREET 200+17 13' RT 5'-0"7'-4"1.9%6'-6"0'-6"9'-0"0'-6"
3 PARSONS STREET 203+91 14' RT 5'-0"5'-6"1.2%6'-6"0'-6"9'-0"0'-6"
13 PARSONS STREET 215+42 18' RT 5'-0"5'-8"0.5%6'-6"0'-6"7'-8"0'-6"
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
LEFT SIDE TRANSITION RIGHT SIDE
TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH
CURB
REVEAL
TRANSITION
LENGTH
CURB
REVEAL
5 PARSONS STREET 206+00 14' RT 7'-5"7'-6"1.2%6'-6"0'-6"9'-0"0'-6"
8 PARSONS STREET 210+99 14' RT 5'-0"6'-6"-0.7%6'-6"0'-6"6'-6"0'-6"T1006.01_HD7(CONSTRUCTION DETAILS).DWG11-Nov-2021 8:28 AMPlotted onFED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
32
CONSTRUCTION DETAILS - 2 OF 5
N.T.S.
PEDESTRIAN CURB RAMP TYPE B
Lw 5'-0" (MIN)1.5%*WLEVEL
LANDING
GUTTER SLOPE
1.5%*
SECTION A-A
A
A
EDGE OF ACCESSIBLE ROUTE
SIDEWALK
ROADWAY
SIDEWALK
FOUNDATION
6" CURB
REVEAL (TYP)
7.5%*7.5%*
CC = 4"
8"LdLEGEND:
W =SIDEWALK WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
W = SIDEWALK WIDTHNOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W-6"
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT
WHEN FACING RAMP OPENING
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
5.SEE E 107.2.1 FOR ALL OTHER DETAILS
SIDEWALK
LEFT SID
E
T
R
A
N
S
I
T
I
O
N
6
"
RIGHT SID
E
T
R
A
N
S
I
T
I
O
N
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
L1.5%*1.5%
*
SECTION A-A
N.T.S.
PEDESTRIAN CURB RAMP TYPE F
LEGEND:
W =SIDEWALK WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR
CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT
WHEN FACING RAMP OPENING
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
7.5%*
ROADWAY
REFERENCE POINT C
RAMP OPENING
A
L
1.5%*
0" REVEAL
EDGE OF ACCESSIBLE ROUTE
SIDEWALK1.
5
%
*
SIDEWALK
1.5%*
6" CURB
REVEAL (TYP)
6" CURB
REVEAL (TYP) RIGH
T
SI
D
E
TRA
N
SI
TI
O
N7.5%*
7.
5
%
*
3 4" CURB
REVEAL (TYP)
W
6"
Lw
5'-0" (
MI
N)
LEVE
L
1.
5
%
*
A
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
CC = 4"
8"SIDEWALK
FOUNDATION
PLAIN CEMENT CONCRETE
0" REVEAL
L
E
F
T
S
I
D
E
T
R
A
N
S
I
T
I
O
N
Ld4'-
0
"
(
M
I
N
)
N.T.S.
PEDESTRIAN CURB RAMP TYPE D
Lw 5'-0" (MIN)1.5%*WLEVEL
LANDING
1.5%*
SECTION A-A
A
A
EDGE OF ACCESSIBLE ROUTE
SIDEWALK
ROADWAY
SIDEWALK
FOUNDATION
6" CURB
REVEAL (TYP)
7.5%*
7.5%*
CC = 4"
8"LdLEGEND:
W =SIDEWALK WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
W = SIDEWALK WIDTHNOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W-6"
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT
WHEN FACING RAMP OPENING
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
5.SEE E 107.2.1 FOR ALL OTHER DETAILS
DRIVEWAY
LEFT SID
E
T
R
A
N
S
I
T
I
O
N
6"
RIGHT
S
I
D
E
T
R
A
N
S
I
T
I
O
N
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
L1.5%*1.5%
*
7.5%*
7.5%*
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
LEFT SIDE TRANSITION RIGHT SIDE
TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH
CURB
REVEAL
TRANSITION
LENGTH
CURB
REVEAL
4 PARSONS STREET 205+72 14' RT 5'-0"5'-6"1.2%9'-0"0'-6"9'-0"0'-6"
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
LEFT SIDE TRANSITION RIGHT SIDE
TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH
CURB
REVEAL
TRANSITION
LENGTH
CURB
REVEAL
7 PARSONS STREET 209+42 14' RT 5'-0"5'-0"-0.7%7'-8"0'-6"6'-6"0'-6"
6" CURB
REVEAL (TYP)
BACK CURB
SIDEWALK
+
-
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
T1006.01_HD7(CONSTRUCTION DETAILS).DWG12-Nov-2021 3:08 PMPlotted onCONSTRUCTION DETAILS - 3 OF 5
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
33
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
RAMP
LENGTH
(W1)WIDTH
(Lw)
DEPTH
(Ld)
16 BRIDGE STREET 115+30 20' LT 5'-0"4'-0"-0.3%7'-0"
17 BRIDGE STREET 115+30 20' RT 5'-0"4'-0"0.3%7'-0"
18 PARSONS STREET 219+05 14' RT 5'-0"4'-0"2.1%8'-0"
A
A
EDGE OF ACCESSIBLE ROUTE
LEFT SI
D
E
T
R
A
N
S
I
T
I
O
N
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
7
.
5%
*W1
L
6" CURB
REVEAL (TYP)
7.5%*
7.5%*
LEGEND:
W =SIDEWALK WIDTH
W1 =PERPENDICULAR RAMP LENGTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN FACING RAMP OPENING.
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
N.T.S.
PEDESTRIAN CURB RAMP TYPE L
Lw 5'-0"
NON-WALKING LANDSCAPED AREA
GRADED TO MEET ADJOINING CURB
AND SIDEWALK SURFACES
NON-WALKING LANDSCAPED AREA
GRADED TO MEET ADJOINING CURB
AND SIDEWALK SURFACES
SIDEWALK
RIGHT S
I
D
E
T
R
A
N
S
I
T
I
O
N
L
d
(
4
'
-
0
"
)
W
1.5%*
SECTION A-A
ROADWAYSIDEWALK
FOUNDATION
CC = 4"
8"
Ld 4'-0" (MIN)
7.5%*
W1W1
1
.
5%
N.T.S.
PEDESTRIAN CURB RAMP TYPE K
Lw 5'-0" (
M
I
N
)
1
.
5%
*WLEVEL
LANDING
1.5%*
SECTION A-A
A
A
EDGE OF ACCESSIBLE ROUTE
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
DRIVEWAY
(SEE DRIVEWAY
DETAIL 3)
ROADWAY
L
SIDEWALK
FOUNDATION
PROP CURB CORNER
7.5%*
7.5%*
CC = 4"
8"
L
d
LEGEND:
W =SIDEWALK WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
LEFT SI
D
E
T
R
A
N
S
I
T
I
O
N
RIGHT S
I
D
E
T
R
A
N
S
I
T
I
O
N
W = SIDEWALK WIDTH
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W-6"
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN FACING RAMP OPENING.
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
5.SEE E 107.2.1 FOR ALL OTHER DETAILS
SIDEWALK
1
.
5%
*
1
.
5%
*
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
LEFT SIDE TRANSITION RIGHT SIDE
TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH
CURB
REVEAL
TRANSITION
LENGTH
CURB
REVEAL
15 BRIDGE STREET 112+37 93' RT 5'-0"6'-6"-0.7%7'-8"*6'-6"*
N.T.S.
PEDESTRIAN CURB RAMP TYPE H
Lw 5'-0" (MIN)1.5%*WLEVEL
LANDING
1.5%*
SECTION A-A
A
A
EDGE OF ACCESSIBLE ROUTE
LOAM & SEED
ROADWAYSIDEWALK
FOUNDATION
7.5%*
CC = 4"
8"Ld 4'-0" (MIN)LEGEND:
W =SIDEWALK WIDTH
W1 =PERPENDICULAR RAMP LENGTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%Ld 4'-0" (MIN)
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN
FACING RAMP OPENING.
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
SIDEWALKRIGHT SIDE
T
R
A
N
S
I
T
I
O
N
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
LW1
7.5%*
W1
NON-WALKING
LANDSCAPED AREA
GRADED TO MEET
ADJOINING CURB AND
SIDEWALK SURFACES
EDGE OF PAVEMENT 1.5%
*
7.5%*
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
RIGHT SIDE
TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH
CURB
REVEAL
12 PARSONS STREET 215+40 10' LT 5'-0"6'-0"-0.4%6'-6"0'-6"
7.5%*
A
EDGE OF ACCESSIBLE ROUTE
LEFT SI
D
E
T
R
A
N
S
I
T
I
O
N
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
7
.
5%
*W1
L
6" CURB
REVEAL (TYP)
7.5%*
7.5%
*
1.5%*
SECTION A-A
ROADWAY
SIDEWALK
FOUNDATIO
N
CC = 4"
8"
LEGEND:
W =SIDEWALK WIDTH
W1 =PERPENDICULAR RAMP LENGTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN FACING RAMP OPENING.
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
7.5%*
W1
N.T.S.
PEDESTRIAN CURB RAMP TYPE J
Lw 5'-0"
NON-WALKING LANDSCAPED AREA
GRADED TO MEET ADJOINING CURB
AND SIDEWALK SURFACES
NON-WALKING LANDSCAPED AREA
GRADED TO MEET ADJOINING CURB
AND SIDEWALK SURFACES
SIDEWALK
RIGHT S
I
D
E
T
R
A
N
S
I
T
I
O
N
SIDEWALK6"N.T.S.
PEDESTRIAN CURB RAMP NOTES
PEDESTRIAN CURB RAMP NOTES:
1.MAXIMUM ALLOWABLE SLOPE OF ACCESSIBLE ROUTE EXCLUDING CURB RAMPS
SHALL BE DESIGNED TO 4.5% ±0.5% (7.5% ±0.5% FOR CURB RAMPS)
2.A MINIMUM OF 3'-0" CLEAR SHALL BE MAINTAINED AT ANY PERMANENT OBSTACLE IN
ACCESSIBLE ROUTE (I.E., HYDRANTS, UTILITY POLES, TREE WELLS, SIGNS, ETC.).
3.CURB TREATMENT VARIES, SEE PLANS FOR CURB TYPE.
4.RAMP, CURB AND ADJACENT PAVEMENTS SHALL BE GRADED TO PREVENT PONDING.
5.WHERE ACCESSIBLE ROUTES ARE LESS THAN 5' IN WIDTH (EXCLUDING CURBING) A
5'x5' PASSING AREA SHALL BE PROVIDED AT INTERVALS NOT TO EXCEED 200 FT.
6.ELIMINATE CURBING AT RAMP WHERE IT ABUTS ROADWAY.
7.DETECTABLE WARNING PANELS ARE REQUIRED ON ALL OF THE PROPOSED
PEDESTRIAN CURB RAMPS AND ARE TO BE INSTALLED IN ACCORDANCE WITH
CONSTRUCTION STANDARD E 107.6.5 (OCTOBER 2017). CONTRACTOR SHALL
PROVIDE 6" BETWEEN DETECTABLE WARNING PANEL AND EDGE OF CONCRETE
WHERE IT ABUTS LOAM & SEED.
8.PEDESTRIAN CURB RAMP SLOPES AND CROSS SLOPES SHALL HAVE A
CONSTRUCTION TOLERANCE OF ±0.5%.
9.DETECTABLE WARNING PANELS SHALL BE YELLOW IN COLOR AS APPROVED BY THE
CITY.
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
A
A
EDGE OF
ACCESSIBLE
ROUTE
LEFT SIDE TRANSITION REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
SIDEWALK
7
.
5%
*W1
L
6" CURB
REVEAL (TYP)
7.5%*
7.5%
*
1.5%*
SECTION A-A
ROADWAYSIDEWALK
FOUNDATION
CC = 4"
8"
LEGEND:
W =SIDEWALK WIDTH
W1 =PERPENDICULAR RAMP LENGTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
Ld 4'-0" (MIN)
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT
WHEN FACING RAMP OPENING
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
7.5%*
W1
N.T.S.
PEDESTRIAN CURB RAMP TYPE G
LEVEL
LANDING
1
.
5%
*
Lw 5'-0"
(
M
I
N
)
L
d
4
'
-
0
"
(M
I
N
)WRIGH
T
SI
D
E
T
R
A
N
SI
TI
O
N
1
.
5%
*
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
RAMP
LENGTH
(W1)
LEFT SIDE TRANSITION RIGHT SIDE
TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH
CURB
REVEAL
TRANSITION
LENGTH
CURB
REVEAL
11 PARSONS STREET 215+00 17' RT 5'-0"4'-0"-0.3%6'-8"7'-8"0'-6"6'-6"0'-6"
GUTTER SLOPE
+
-
NON-WALKING LANDSCAPED AREA
GRADED TO MEET ADJOINING CURB
AND SIDEWALK SURFACES
NON-WALKING LANDSCAPED AREA
GRADED TO MEET ADJOINING CURB
AND SIDEWALK SURFACES
EXIST LEVEL
LANDING
*CURB REVEAL VARIES IN THE AREA OF THE RAISED CROSSWALK, SEE SPORT GRADES.
*CURB REVEAL VARIES IN THE AREA OF THE RAISED CROSSWALK, SEE SPORT GRADES.
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
ROADWAY
GUTTER
SLOPE
LEFT SIDE TRANSITION RIGHT SIDE
TRANSITION
TRANSITION
LENGTH
CURB
REVEAL
TRANSITION
LENGTH
CURB
REVEAL
14 BRIDGE STREET 112+26 74' RT 0.7%7'-8"*6'-6"*
T1006.01_HD7(CONSTRUCTION DETAILS).DWG11-Nov-2021 8:28 AMPlotted onCONSTRUCTION DETAILS - 4 OF 5
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
34
N.T.S.
PEDESTRIAN CURB RAMP TYPE B
Lw 5'-0" (MIN)1.5%*W
LEVEL
LANDING
GUTTER SLOPE
1.5%*
SECTION A-A
A
A
EDGE OF ACCESSIBLE ROUTE
SIDEWALK
ROADWAY
SIDEWALK
FOUNDATION
6" CURB
REVEAL (TYP)
7.5%*7.5%*
CC = 4"
8"LdLEGEND:
W =SIDEWALK WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
W = SIDEWALK WIDTHNOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W-6"
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT
WHEN FACING RAMP OPENING
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
5.SEE E 107.2.1 FOR ALL OTHER DETAILS
SIDEWALK
LEFT SID
E
T
R
A
N
S
I
T
I
O
N RIGHT SIDE TRANSITIONDETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
L1.5%*+
-
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
LEFT SIDE TRANSITION RIGHT SIDE TRANSITION
WIDTH
(Lw)
DEPTH
(Ld)
TRANSITION
LENGTH CURB REVEAL TRANSITION
LENGTH
CURB
REVEAL
10 PARSONS STREET 215+66 14 RT 13'-4"7'-6"-0.5%6'-6"0'-6"6'-6"0'-6"
6 PARSONS STREET 209+14 15 RT 6'-7"6'-0"-0.7%6'-6"0'-6"6'-6"0'-6"
1.
5
%
*
A
A
EDGE OF ACCESSIBLE ROUTE
LEFT SID
E
T
R
A
N
S
I
T
I
O
N
DETECTABLE WARNING
PANEL (SEE E 107.6.5)
REFERENCE POINT C
RAMP OPENING
PLAIN CEMENT CONCRETE
7
.
5%
*W1
L
6" CURB
REVEAL (TYP)
7.5%*
7.5%
*
1.5%*
SECTION A-A
ROADWAY
SIDEWALK
FOUNDATIO
N
CC = 4"
8"
LEGEND:
W =SIDEWALK WIDTH
W1 =PERPENDICULAR RAMP LENGTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN FACING RAMP OPENING.
4.SEE E 107.6.5 FOR DETECTABLE WARNING PANEL DETAILS
7.5%*
W1
N.T.S.
PEDESTRIAN CURB RAMP TYPE N
Lw 6'-0"
NON-WALKING LANDSCAPED AREA
GRADED TO MEET ADJOINING CURB
AND SIDEWALK SURFACES
SIDEWALK
RIGHT S
I
D
E
T
R
A
N
S
I
T
I
O
N
1
.
5%
SIDEWALK
W
6"L
d
(
4
'
-
0
"
)
GUTTER SLOPE
+
-
SIDEWALK
NON-WALKING LANDSCAPED
AREA GRADED TO MEET
ADJOINING CURB AND
SIDEWALK SURFACES
PEDESTRIAN CURB RAMP DATA
RAMP #BASELINE
REFERENCE STATION OFFSET
LEVEL LANDING ROADWAY
GUTTER
SLOPE
RAMP
LENGTH
(W1)WIDTH
(Lw)
DEPTH
(Ld)
19 PARSONS STREET 219+04 21' RT 6'-0"5'-0"-2.1%7'-6"6"6"
T1006.01_HD7(CONSTRUCTION DETAILS).DWG11-Nov-2021 8:28 AMPlotted onCONSTRUCTION DETAILS - 5 OF 5
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
35
N.T.S.
SIDEWALK THROUGH DRIVEWAY TYPE 1
LEGEND:
W =SIDEWALK WIDTH
Wc =CURB WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W-6"
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM LEFT TO RIGHT WHEN FACING DRIVEWAY OPENING
4.SURFACE TREATMENT VARIES; SEE PLANS
A
A
EDGE OF
ACCESSIBLE
ROUTE
REFERENCE POINT C
RAMP OPENING
L
7.5%*
7.5%*
LEFT SIDE TR
A
N
S
I
T
I
O
N
SIDEWALK
1.5%*
SECTION A-A
ROADWAYDRIVEWAY
FOUNDATION
CC = 6"
8" (MIN)
3'-0" (MIN)
5% TO 15
%
S
L
O
P
E
VARIES W6
"
SIDEWALK
6" CURB REVEAL (TYP)
RIGHT SIDE T
R
A
N
S
I
T
I
O
N5% TO
15%SLOPE3
'
-0
"
(M
IN
)
1
.5%
*CROSSSLOPEPATH OF TRAVEL
1" LIP
MATCH EXIST D
R
I
V
E
W
A
Y
W
I
D
T
H
DRIVEWAY DATA
DWY #BASELINE
REFERENCE STATION OFFSET DRIVEWAY
SURFACE
DWY
WIDTH
@
GUTTER
ROADWAY
GUTTER
SLOPE
WIDTH OF
ACCESSIBLE
ROUTE
LEFT SIDE RIGHT SIDE
LENGTH CURB
REVEAL
SW
WIDTH LENGTH CURB
REVEAL
SW
WIDTH
1 PARSONS STREET 201+27 10' RT CEM CONC 20'-2"0.8%4'-6"6'-6"0'-6"7'-0"7'-8"0'-6"7'-0"
2 PARSONS STREET 202+07 10' RT CEM CONC 21'-9"1.2%3'-0"6'-6"0'-6"5'-5"9'-0"0'-6"5'-6"
3 PARSONS STREET 202+88 10' RT CEM CONC 19'-4"1.5%3'-0"6'-6"0'-6"5'-6"9'-0"0'-6"5'-6"
4 PARSONS STREET 204+61 10' RT CEM CONC 14'-3"1.4%3'-0"3'-3"0'-3"5'-6"9'-0"0'-6"5'-6"
5 PARSONS STREET 204+87 10' RT CEM CONC 22'-10"1.1%3'-0"6'-6"0'-6"5'-6"4'-6"0'-3"5'-6"
6 PARSONS STREET 207+23 10' RT CEM CONC 24'-11"-0.8%3'-0"3'-10"0'-3"5'-6"6'-6"0'-6"5'-6"
7 PARSONS STREET 207+71 10' RT CEM CONC 54'-10"-0.8%3'-0"7'-8"0'-6"5'-6"3'-3"0'-3"5'-6"
8 PARSONS STREET 210+09 10' RT CEM CONC 15'-3"-0.3%3'-0"7'-8"0'-6"5'-6"6'-6"0'-6"5'-6"
9 PARSONS STREET 210+46 10' RT CEM CONC 17'-10"-0.2%3'-0"7'-8"0'-6"5'-6"6'-6"0'-6"5'-6"
10 PARSONS STREET 212+52 10' RT CEM CONC 27'-7"-0.3%3'-0"7'-8"0'-6"5'-6"6'-6"0'-6"5'-6"
11 PARSONS STREET 213+12 10' RT CEM CONC 18'-10"-0.5%3'-0"7'-8"0'-6"5'-6"6'-6"0'-6"5'-6"
12 PARSONS STREET 213+64 10' RT CEM CONC 19'-10"-0.5%3'-0"7'-8"0'-6"5'-6"6'-6"0'-6"5'-6"
16 HAWLEY STREET 313+67 12' RT CEM CONC 41'-11"1.5%3'-0"6'-6"0'-6"5'-6"9'-0"0'-6"5'-6"
17 HAWLEY STREET 314+47 12' RT CEM CONC 36'-6"0.4%3'-0"6'-6"0'-6"5'-6"7'-8"0'-6"5'-6"
18 HAWLEY STREET 315+11 12' RT CEM CONC 25'-5"-0.5%3'-0"7'-8"0'-6"5'-6"6'-6"0'-6"5'-6"
19 HAWLEY STREET 315+60 12' RT CEM CONC 31'-6"-0.8%3'-0"7'-8"0'-6"7'-6"6'-6"0'-6"5'-6"
N.T.S.
SIDEWALK THROUGH DRIVEWAY TYPE 3
LEGEND:
W =SIDEWALK WIDTH
Wc =CURB WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W-6"
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN FACING DRIVEWAY OPENING.
4.SURFACE TREATMENT VARIES; SEE PLANS
A
A
EDGE OF
ACCESSIBLE
ROUTE
REFERENCE POINT C
RAMP OPENING
L
7.5%*
7.5%*
LEFT SIDE TR
A
N
S
I
T
I
O
N
1.5%*
SECTION A-A
ROADWAYDRIVEWAY
FOUNDATION
CC = 6"
8" (MIN)
3'-0" (MIN)
5% TO 15
%
S
L
O
P
E
VARIESW 6
"
SIDEWALK
6" CURB
REVEAL (TYP)5% TO15%SLOPE3
'
-
0
"
(M
IN
)
1
.5%
*CROSSSLOPEPATH OF TRAVEL
1" LIP
MATCH EXIST D
R
I
V
E
W
A
Y
W
I
D
T
H
2'
2'
DRIVEWAY DATA
DWY #BASELINE
REFERENCE STATION OFFSET DRIVEWAY
SURFACE
DWY
WIDTH
@
GUTTER
ROADWAY
GUTTER
SLOPE
WIDTH OF
ACCESSIBLE
ROUTE
LEFT SIDE
LENGTH CURB
REVEAL
SW
WIDTH
13 BRIDGE STREET 112+48 80' RT CEM CONC 20'-6"-0.80%4'-6"7'-8"0'-6"4'-6"
1.5%*
1.5%*
PEDESTRIAN
CURB RAMP
(SEE DETAIL I)
DRIVEWAY DATA
DWY #BASELINE
REFERENCE STATION OFFSET DRIVEWAY
SURFACE
DWY
WIDTH
@
GUTTER
ROADWAY
GUTTER
SLOPE
WIDTH OF
ACCESSIBLE
ROUTE
LEFT SIDE RIGHT SIDE
LENGTH CURB
REVEAL
SW
WIDTH LENGTH CURB
REVEAL
SW
WIDTH
14 HAWLEY STREET 304+96 12' RT CEM CONC 31'-8"-1.60%7'-8"9'-0"0'-6"5'-0"6'-6"0'-6"11'-3"
N.T.S.
SIDEWALK THROUGH DRIVEWAY TYPE 4
LEGEND:
W =SIDEWALK WIDTH
Wc =CURB WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN FACING DRIVEWAY OPENING.
4.SURFACE TREATMENT VARIES; SEE PLANS
A
A
EDGE OF
ACCESSIBLE
ROUTE
REFERENCE POINT C
RAMP OPENING
L
7.5%*
7.5%*
LEFT SIDE TR
A
N
S
I
T
I
O
N
SIDEWALK
1.5%*
SECTION A-A
ROADWAYDRIVEWAY
FOUNDATION
CC = 6"
8" (MIN)
3'-0" (MIN)
5% TO 15
%
S
L
O
P
E
VARIES WSIDEWALK
6" CURB
REVEAL (TYP)
RIGHT SIDE T
R
A
N
S
I
T
I
O
N5% TO15%SLOPE3
'
-
0
"
(M
IN
)
1
.5%
*CROSSSLOPEPATH OF TRAVEL
1" LIP
MATCH EXIST
D
R
I
V
E
W
A
Y
W
I
D
T
H
R=4'R=12'
7.5%*
7.5%*
BACK CURB
N.T.S.
SIDEWALK THROUGH DRIVEWAY TYPE 2
LEGEND:
W =SIDEWALK WIDTH
Wc =CURB WIDTH
CC = CEMENT CONCRETE
* =TOLERANCE FOR CONSTRUCTION ±0.5%
NOTES:
1.USABLE SIDEWALK WIDTH PER AAB = W-6"
2.USABLE SIDEWALK WIDTH PER AAB IS NOT TO BE LESS THAN 4'-0"
3.ROADWAY GUTTER SLOPE MEASURED FROM RIGHT TO LEFT WHEN FACING DRIVEWAY OPENING.
4.SURFACE TREATMENT VARIES; SEE PLANS
A
A
EDGE OF
ACCESSIBLE
ROUTE
REFERENCE POINT C
RAMP OPENING
L
7.5%*
7.5%*
LEFT SIDE TR
A
N
S
I
T
I
O
N
SIDEWALK
1.5%*
SECTION A-A
ROADWAYDRIVEWAY
FOUNDATION
CC = 6"
8" (MIN)
W W6"SIDEWALK
6" CURB REVEAL (TYP)
RIGHT SIDE T
R
A
N
S
I
T
I
O
NW
1" LIP
MATCH EXIST D
R
I
V
E
W
A
Y
W
I
D
T
H
1.5%
*
DRIVEWAY DATA
DWY #BASELINE
REFERENCE STATION OFFSET DRIVEWAY
SURFACE
DWY
WIDTH
@
GUTTER
ROADWAY
GUTTER
SLOPE
WIDTH OF
ACCESSIBLE
ROUTE
LEFT SIDE RIGHT SIDE
LENGTH CURB
REVEAL
SW
WIDTH LENGTH CURB
REVEAL
SW
WIDTH
15 HAWLEY STREET 312+90 12' RT CEM CONC 23'-0"1.50%5'-0"6'-6"0'-6"5'-0"9'-0"0'-6"5'-0"
7.5%*
7.5%*
LANDSCAPE AREA
7.5%*
7.5%*
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
GUTTER SLOPE
+
-
LANDSCAPE AREA
200+50
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
201+00
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
201+25
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
201+50
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
138.5138.0137.6137.51.5%
1.5%
1.5%
1.5%10.0%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
CONST BL
6:1
6:1
6:1
0.8%
PERM
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 7.74 SF
FILL: 0.00 SF
CUT: 9.72 SF
FILL: 0.00 SF
CUT: 8.28 SF
FILL: 0.00 SF
CUT: 6.77 SF
FILL: 0.00 SF T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:28 AMPlotted on-
CROSS SECTIONS - 1 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
36
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
202+00
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
202+50
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
202+90
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
203+00
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
137.4136.9136.3136.21.5%
1.5%10.0%
1.5%15.0%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
CONST BL
1.5%
6:1
10.8%
13:1
7.3%
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 7.57 SF
FILL: 0.00 SF
CUT: 8.38 SF
FILL: 0.00 SF
CUT: 7.74 SF
FILL: 0.00 SF
CUT: 8.87 SF
FILL: 0.00 SF T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:28 AMPlotted on-
CROSS SECTIONS - 2 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
37
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
203+50
128
132
136
140
144
128
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
204+00
128
132
136
140
144
128
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
204+50
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
135.5134.9134.21.5%
1.5%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
1.5%
3:1
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 6.17 SF
FILL: 0.00 SF
CUT: 6.98 SF
FILL: 0.00 SF
CUT: 7.16 SF
FILL: 0.00 SF T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:28 AMPlotted on-
CROSS SECTIONS - 3 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
38
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
204+60
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
205+00
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
205+50
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
206+00
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
134.1133.7133.3132.71.5%
1.5%10.0%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
CONST BL
3:1
8.4%
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 0.00 SF
FILL: 0.00 SF
CUT: 6.93 SF
FILL: 0.00 SF
CUT: 8.60 SF
FILL: 0.00 SF
CUT: 8.64 SF
FILL: 0.00 SF
1.0%1.5%5.0%T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:28 AMPlotted on-
CROSS SECTIONS - 4 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
39
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
206+50
124
128
132
136
140
124
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
207+00
124
128
132
136
140
124
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
132.6132.91.5%
1.5%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
3:1
3:1
TEMP
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
PERM
EASEMENT
CUT: 7.28 SF
FILL: 0.00 SF
CUT: 7.68 SF
FILL: 0.00 SF T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 5 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
40
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
207+50
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
208+00
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
208+50
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
209+00
128
132
136
140
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
133.3133.7134.1134.41.5%
1.5%
1.5%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
CONST BL
3:1
3:1
3.0%
0.5%
0.5%
PERM
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
CUT: 7.83 SF
FILL: 0.00 SF
CUT: 8.11 SF
FILL: 0.00 SF
CUT: 10.42 SF
FILL: 0.00 SF
CUT: 8.63 SF
FILL: 0.00 SF T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 6 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
41
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
209+50
128
132
136
140
144
128
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
210+00
128
132
136
140
144
128
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
210+09
128
132
136
140
144
128
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
134.8135.1135.21.5%
1.5%15.0%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
1.5%
15.0%
3:1
5:1
PERM
EASEMENT
TEMP
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
CUT: 10.95 SF
FILL: 0.00 SF
CUT: 7.44 SF
FILL: 0.00 SF
CUT: 9.26 SF
FILL: 0.00 SF T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 7 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
42
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
210+50
128
132
136
140
144
128
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
211+50
128
132
136
140
144
128
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
212+00
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
135.4136.0136.21.5%
1.5%
1.5%15.0%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
3:1
3:1
15.0%
TEMP
EASEMENT
PERM
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 9.56 SF
FILL: 0.00 SF
CUT: 8.04 SF
FILL: 0.00 SF
CUT: 6.57 SF
FILL: 0.00 SF
212+50
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56 136.45.0%1.5%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT CONST BL
TEMP
EASEMENT
CUT: 7.92 SF
FILL: 0.00 SF
T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 8 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
43
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
213+00
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
213+15
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
213+50
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
136.7136.7136.81.5%10.0%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
1.5%3:1
1.5%10.0%
10.0%
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
15.0%
CUT: 7.58 SF
FILL: 0.00 SF
CUT: 7.23 SF
FILL: 0.00 SF
CUT: 11.04 SF
FILL: 0.00 SF
213+65
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56 136.91.5%15.0%
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT CONST BL
12.0%
TEMP
EASEMENT
CUT: 8.67 SF
FILL: 0.00 SF
T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 9 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
44
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
214+00
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
214+50
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
137.0137.31.5%
1.5%
215+00
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 600-4-8-12-16-20-24-28-32-36-40-44-48-52-56
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
215+50
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
CONST BL
CONST BL
3:1
3:1137.4137.39PERM
EASEMENT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
TEMP
EASEMENT
TEMP
EASEMENT
CONST BL
EXIST CITY
LAYOUT
CONST BL
EXIST CITY
LAYOUT
0.8%
1.5%
CUT: 18.89 SF
FILL: 0.00 SF
CUT: 12.56 SF
FILL: 0.00 SF
CUT: 7.81 SF
FILL: 0.00 SF
CUT: 7.90 SF
FILL: 0.00 SF
1.5%10:1 7:1
2.8%T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 10 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
45
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
219+05
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
218+90
132
136
140
144
132
136
140
144
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56 137.6137.3CONST BL
CONST BL
1.5%
1.5%1.7%1.5%0.7%
4:1
1.5%
CUT: 35.26 SF
FILL: 0.00 SF
CUT: 7.18 SF
FILL: 0.46 SF T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 11 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
46
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
305+25
120
124
128
132
136
120
124
128
132
136
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
305+00
120
124
128
132
136
120
124
128
132
136
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
304+50
120
124
128
132
136
140
120
124
128
132
136
140
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
EXIST CITY
LAYOUT
CONST BL
CONST BL
CONST BL
1.5%
1.5%
1.5%
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 15.96 SF
FILL: 0.00 SF
CUT: 8.57 SF
FILL: 0.71 SF
CUT: 8.20 SF
FILL: 0.00 SF
11.8%
7:1
T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 12 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
47
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
312+85
120
124
128
132
136
120
124
128
132
136
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
313+00
120
124
128
132
120
124
128
132
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
313+50
120
124
128
132
120
124
128
132
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
125.3125.1124.4EXIST CITY
LAYOUTCONST BL
EXIST CITY
LAYOUTCONST BL
EXIST CITY
LAYOUTCONST BL
1.5%
1.5%
1882 CITY
LAYOUT
1882 CITY
LAYOUT
1882 CITY
LAYOUT
5.0%1.5%1.0%
10.0%
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 12.83 SF
FILL: 0.00 SF
CUT: 11.34 SF
FILL: 0.10 SF
CUT: 15.87 SF
FILL: 0.00 SF
2.5%T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 13 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
48
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
314+00
116
120
124
128
132
116
120
124
128
132
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
314+50
116
120
124
128
132
116
120
124
128
132
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
315+00
116
120
124
128
132
116
120
124
128
132
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
123.8123.4123.4EXIST CITY
LAYOUTCONST BL
EXIST CITY
LAYOUTCONST BL
EXIST CITY
LAYOUTCONST BL
1882 CITY
LAYOUT
1882 CITY
LAYOUT
1882 CITY
LAYOUT
5.0%1.5%6.2%
1.5%
1.5%
TEMP
EASEMENT
TEMP
EASEMENT
TEMP
EASEMENT
CUT: 12.04 SF
FILL: 0.10 SF
CUT: 13.97 SF
FILL: 0.00 SF
CUT: 15.51 SF
FILL: 0.00 SF
8.0%9.4%
13:1 T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 14 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
49
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
315+50
116
120
124
128
132
116
120
124
128
132
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
316+00
116
120
124
128
132
116
120
124
128
132
0 4 8 12 16 20 24 28 32 36 40 44 48 52 560-4-8-12-16-20-24-28-32-36-40-44-48-52-56
123.8124.2EXIST CITY
LAYOUTCONST BL
EXIST CITY
LAYOUTCONST BL
1.5%
1.5%
1882 CITY
LAYOUT
1882 CITY
LAYOUT
4:1
TEMP
EASEMENT
CUT: 9.53 SF
FILL: 0.00 SF
CUT: 11.11 SF
FILL: 0.00 SF
6.0%10.0%T1006.01_HD10(CROSS SECTIONS).DWG11-Nov-2021 8:29 AMPlotted on-
CROSS SECTIONS - 15 OF 15
FED. AID PROJ. NO.SHEET
NO.
TOTAL
SHEETS
NORTHAMPTON
BRIDGE STREET (ROUTE 9), PARSONS STREET
& HAWLEY STREET
50
PROJECT FILE NO.609515
50
0
HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8