Loading...
FY 19 MVP Action-October-2019-Northampton1 PROGRESS REPORT:   ENV 19 MVP 02 ‐ FY 19 MVP Action Grant Monthly Report Form   to:10/31/ 2019   Municipality: Northampton  MMARS Doc ID (from contract):  CT ENV 0621190000 000000 3786  Phone413‐: 587‐1265   Email: WFeiden@NorthamptonMA.gov  REPORT SUMMARY  Reporting period   from: 10/1/2019  Project Name: Protecting Downtown:   Northampton’s Flood Control Levees  Contractor vendor code (from contract):  VC6000192124  Project Manager: Wayne Feiden  GRANT REPORT NARRATIVE  1.Project schedule (please include any reasons for change in schedule if needed) A.Administration and project mobilization and contracting (by end August, 2019) B.As‐Built Survey (12/31/2019) –  Changed tog focused on completing USACE Drilling Work Plan review and beginning the subsurface exploration program before winter conditions. C.Subsurface Exploration (1/13/2020) – Changed to address USACE review timeline. D.Operations and Maintenance Document Evaluation (5/15/2020) E.Engineering Evaluations and Analysis (6/1/2020) 2.Project scope (progress toward deliverables and percent of task completion (please list for each task in attachment B of your contract). Include any change in scope. A.Project mobilization, contracting, and subcontracting‐ complete B.As‐Built Survey‐ review of existing data currently underway, final expected early Dec., 2019 C.Subsurface Exploration‐ draft work plan under review, subsurface explorations anticipated early December D.Operations and Maintenance Document evaluation‐ not yet started but on‐schedule E.Engineering Evaluations and Analysis‐ not yet started by on‐schedule 3.Current status of project costs/budget (please include any anticipated underruns or overruns) A.Project is currently within budget and no overruns or underruns are anticipated. 4.List significant activities that have occurred this period which have advanced deliverable completion A.Project contracting and mobilization has been completed. B.Draft subsurface exploration work plan has been completed and is under review 5.List anticipated work for next period  2 A.Review of As‐built survey data is anticipated in November/December. B.Review of subsurface exploration work plan by the USACE is anticipated in December. C.The start of the subsurface exploration program is anticipated in early December.  6.List any upcoming significant project meetings or community engagement meetings related to this project, including dates, times, and locations if known (our Regional Coordinators may reach out to attend) None currently anticipated  ADDITIONAL INFORMATION  7.Please let us know if additional assistance from EEA or partners is needed. None currently anticipated INVOICE SUMMARY  Please fill out the invoice summary below and attach all invoices for fully completed tasks(s  since last submission. Please clearly indicate what task the invoice is for based on the  nomenclature used in the scope in attachment B of your contract. Please also clearly document  the match amount for the task (for both cash and in‐kind match).  INVOICES will be included in December report (still below up-front portion of grant) Additional cummulative match (not reflected in above invoices) for these tasks:_$10,398  In‐Kind Match:  Wayne Feiden, Project Manager & coordination with resiliency plan=133 hours @$71/hour David Veleta, City Engineer- technical oversight=5 hours @70/hour Kris Baker, Project Engineer= 11 hours @55/hour Please  attach  documentation  of  cash  match  or  in‐kind  hours  worked  and  resulting  expenses  related to these tasks.  *Reminder  that  reimbursements  will  only  be  triggered  after  total  invoices  for  the  project exceed the up‐front portion of the grant funds.* 3 DELIVERABLES  NO DELIVERABLES TO DATE‐procurement, contracting, mobilization complete.  Associated Vendor Personnel:  Name: Chris Baker, Project Manager Phone: 781‐278‐5881  Email: Christopher.Baker@gza.com  Name: Tom Jenkins Phone: 413‐726‐2121  Email: thomas.jenkins@gza.com