Loading...
Paradise Pond - Annual sediment redistribution notification.pdf12/6/21, 2:37 PM City of Northampton Mail - Paradise Pond - Annual sediment redistribution notification https://mail.google.com/mail/u/0/?ik=fec0f72d97&view=pt&search=all&permthid=thread-f%3A1716959150765903032%7Cmsg-f%3A17169591507659…1/1 Sarah LaValley <slavalley@northamptonma.gov> Paradise Pond - Annual sediment redistribution notification 1 message Gary Hartwell <ghartwel@smith.edu>Sat, Nov 20, 2021 at 9:50 AM To: Sarah LaValley <slavalley@northamptonma.gov>, "misty-anne.marold@state.ma.us" <misty-anne.marold@state.ma.us>, "Sneeringer, Paul J CIV USARMY CENAE (US)" <Paul.J.Sneeringer@usace.army.mil>, "Wong, David W (DEP)" <david.w.wong@state.ma.us> Cc: Peter Gagnon <pgagnon@smith.edu>, Scott Richards <srichards@smith.edu>, John LaBrie <jlabrie@smith.edu>, Robert Newton <rnewton@smith.edu>, Sarah Pierce <spierce@parecorp.com>, Allen Orsi <aorsi@parecorp.com>, Greg de Wet <gdewet@smith.edu>, Jennifer Marcotte <jgraveline@smith.edu>, Kathy San Antonio <ksananto@smith.edu>, David Veleta <dveleta@northamptonma.gov>, Kristine Baker <kbaker@northamptonma.gov>, Bill Moynihan <bmoynihan@hatfieldconstruction.com>, Marney Pratt <mcpratt@smith.edu>, Ethan Nedeau <nedeau.ethan@gmail.com>, James Lucey <jlucey@smith.edu>, Jessica Applin <jess@landstewardshipinc.com>, Rosalie Starvish <rosalie.starvish@gza.com> To: Northampton Conservation Commission, Mass DEP, Mass Wildlife and USACE, Referencing File No. WE 246-0725, USACE Permit #NAE-2012-2550, Chapter 91 Permit No. 15001, 401 WQC Transmittal No. X281564 and *MassDEP File #246-0715 (Water Resources Maintenance Activities) Smith College Facilities Management will undertake annual sediment redistribution within Paradise Pond. The Pond will be partially drawn down on Monday, December 6, 2021, weather permitting. Sediment will be redistributed within Paradise Pond via mechanical equipment (bulldozer & excavator) from higher elevations to lower elevations including the river channel, within the Pond. Within the area proposed for redistribution the Pond bottom will be graded to elevation 134', about 2' below normal pool. Some sediment is expected to be transported by river flow through the dam sluice and settle within the plunge pool below the spillway. We expect some sediment will pass further downstream settling in the river below Lamont Bridge. The work is expected to take 2 weeks. Restoration of the Pond to normal pool should be complete by December 24 depending on flow. *Taking advantage of the partial drawdown, invasive plants on the Pond Island will be surveyed and inventoried for eventual control activities in 2022. The brush will be mowed following the survey. Minor damage to the flashboards will be repaired. See links below for current Pond and River conditions. USGS data is updated hourly. Pond data is updated 4 times/hour. Webcams are live. Please contact me with questions or concerns. Gary J. Hartwell Project Manager Facilities Management Smith College 126 West Street Northampton, MA 01063 413-320-9763 https://waterdata.usgs.gov/ma/nwis/uv?site_no=01171500 http://pond.smith.edu/index.html https://www.smith.edu/about-smith/video-library/campus-webcams