Loading...
23A-053 12 WEST CENTER ST BP-2021-1516 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 23A- 053 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERNIIT Permit# BP-2021-1516 Project# JS-2021-002525 Est. Cost: $22000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: TRINITY SOLAR 098295 Lot Size(sq. ft.): 5052.96 Owner: GIORDANO LESLIE A Zoning: URB(100)/ Applicant: TRINITY SOLAR AT: 12 WEST CENTER ST Applicant Address: Phone: Insurance: 4 OPEN SQUARE WAY, SUITE 410 ATTN: APPLICATIONS D (413) 203-9088 O WC HOLYOKEMA01040 ISSUED ON:6/21/2021 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 17 PANEL 5.78 KW SOLAR SYSTEM ON • ROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough-'7 h House# Foundation: nj f Driveway Final: Final: Final:/0 -J 3- no Rough Frame: 20 tab " ' 7/ Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: t),) /0-1y•Zi 11.12 THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REG LATIONS. Certificate of Geet4pancu. / _l - Signature: FeeType: Date Paid: Amount: Building 6/21/2021 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner WESTSHORE DESIGN ENGINEERS, P.C. A IGO GREAT OAKS SIVD, (SITE 115 At..BANY NEYJ YORk ( .1.22{' immeimo To: Trinity Solar 4 Open Square Way#410 Holyoke, MA 01040 Date: October 13, 2021 Ref.: 21060056 Subject: Giordano Residence 12 West Center Street Northampton, MA Dear Trinity Solar, The following references the Giordano Residence in Northampton,MA: 1. Existing roof framing: Roof 2: Conventional framing is 2x12 at 24"o.c. with a 14'-0" max span (horizontal rafter projection). Roof 4&5: Conventional framing is 2x4 at 24"o.c. with a 10'-0" max span (horizontal rafter projection).The roof 2 existing structure is capable to support all the loads that are indicated below for this photovoltaic project.Roofs 4&5 are capable after installing new collar ties between rafters without existing collar ties at 1/3 of the rafter length from the ridge or sistering a new 2x6 to each existing 2x4 rafter below the solar array to any rafters with a span greater than 9' in length 2. Roof Loading: - 4.33psf dead load (modules plus mounting hardware) - 40psf ground snow load - 5.lpsf roof materials (1.lpsf 2x4, 1.5psf sheathing, 2.5psf asphalt shingles) - Exposure Category B, 140mph wind(3 sec.) This installation design will be in general conformance to the manufacturer's specifications, and complies with all applicable laws, codes, and ordinances, specifically the International Building Code/IBC 2015 and International Residential Code/IRC 2015 including all MA regulations and amendments. The spacing and fastening of the mounting brackets is to have a maximum of 64"o.c. span between mounting brackets and secured using 5/16" diameter corrosive resistant steel lag bolts. To evenly distribute the load across the roof rafters, there shall be a minimum of 2 mounting brackets per rafter & min. 3"penetration of lag bolt per bracket, which is adequate to resist all 125mph wind live loads including wind shear. Per NDS Section 11.1.4 clearance holes equal to the diameter of the shank need to be bored into primary a primary framing member for the full length to the threaded portion of the screw to avoid splitting of the framing member. ,soN Of 448g,4C Thank you. o‘ EX,.&,o.22 yGs ' NICOLAS A. Westshore Design Engineers NITTI CIVIL 4 NO. 50222 10/13/2021 -tess oNAi.EN'`��� John Eibert Nicolas Nitti, P Project Coordinator President WestShore Design Engineers 1 100 Great Oaks Blvd. II Suite 115 I Albany,NY 12203 1518.313.7153 12 WEST CENTER ST EP-2021-1064 COMMONWEALTH OF MASSACHUSETTS CITY OF NORTHAMPTON Map: 23A Lot:053 ELECTRICAL PERMIT Permit: Electrical Category: INSTALL 17 PANEL 5.78 KW SOLAR SYSTEM ON ROOF Permit# Electrical PERMISSION IS HEREBY GRANTED TO: Project# JS-2021-002525 Est.Cost: Contractor: License: Fee: $60.00 TRINITY SOLAR MASTER ELECTRICIAN 21233 Owner: GIORDANO LESLIE A Applicant: TRINITY SOLAR AT: 12 WEST CENTER ST Applicant Address Phone Insurance 4 OPEN SQUARE WAY, SUITE 410 ATTN: APPLICATIONS D (413) 203-9088 () C- Liability, GL201900013378 H O LYO K E MA01040 ISSUED ON:6/21/2021 0:00:00 TO PERFORM THE FOLLOWING WORK: INSTALL 17 PANEL 5.78 KW SOLAR SYSTEM ON ROOF Call In Date: Date Requested Inspection Date/SignOff: Reinspect?: Trench/UG: ¢' /f 'i3 Special Instructions Rough • I x Special Instructions: Final: /6 - '3 ` a( SRE Called In: 30401871 Signature: Fee Type:: Amount: DatePaid Electrical $60.00 6/21/2021 0:00:00 8716 212 Main Street,Phone(413)587-1244,Fax(413)587-1272-Inspector of Wires -Roger Malo