23A-053 12 WEST CENTER ST BP-2021-1516
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 23A- 053 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: SOLAR ELECTRIC SYSTEM BUILDING PERNIIT
Permit# BP-2021-1516
Project# JS-2021-002525
Est. Cost: $22000.00
Fee: $75.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: TRINITY SOLAR 098295
Lot Size(sq. ft.): 5052.96 Owner: GIORDANO LESLIE A
Zoning: URB(100)/ Applicant: TRINITY SOLAR
AT: 12 WEST CENTER ST
Applicant Address: Phone: Insurance:
4 OPEN SQUARE WAY, SUITE 410 ATTN: APPLICATIONS D (413)
203-9088 O WC
HOLYOKEMA01040 ISSUED ON:6/21/2021 0:00:00
TO PERFORM THE FOLLOWING WORK:INSTALL 17 PANEL 5.78 KW SOLAR SYSTEM ON
• ROOF
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough-'7 h House# Foundation:
nj f Driveway Final:
Final: Final:/0 -J 3-
no Rough Frame:
20 tab " ' 7/
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final: t),) /0-1y•Zi 11.12
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REG LATIONS.
Certificate of Geet4pancu. / _l - Signature:
FeeType: Date Paid: Amount:
Building 6/21/2021 0:00:00 $75.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner
WESTSHORE
DESIGN ENGINEERS, P.C.
A IGO GREAT OAKS SIVD, (SITE 115
At..BANY NEYJ YORk ( .1.22{'
immeimo
To: Trinity Solar
4 Open Square Way#410
Holyoke, MA 01040
Date: October 13, 2021
Ref.: 21060056
Subject: Giordano Residence
12 West Center Street
Northampton, MA
Dear Trinity Solar,
The following references the Giordano Residence in Northampton,MA:
1. Existing roof framing:
Roof 2: Conventional framing is 2x12 at 24"o.c. with a 14'-0" max span (horizontal rafter
projection).
Roof 4&5: Conventional framing is 2x4 at 24"o.c. with a 10'-0" max span (horizontal rafter
projection).The roof 2 existing structure is capable to support all the loads that are indicated below
for this photovoltaic project.Roofs 4&5 are capable after installing new collar ties between rafters
without existing collar ties at 1/3 of the rafter length from the ridge or sistering a new 2x6 to each
existing 2x4 rafter below the solar array to any rafters with a span greater than 9' in length
2. Roof Loading:
- 4.33psf dead load (modules plus mounting hardware)
- 40psf ground snow load
- 5.lpsf roof materials (1.lpsf 2x4, 1.5psf sheathing, 2.5psf asphalt shingles)
- Exposure Category B, 140mph wind(3 sec.)
This installation design will be in general conformance to the manufacturer's specifications, and complies
with all applicable laws, codes, and ordinances, specifically the International Building Code/IBC 2015
and International Residential Code/IRC 2015 including all MA regulations and amendments. The spacing
and fastening of the mounting brackets is to have a maximum of 64"o.c. span between mounting brackets
and secured using 5/16" diameter corrosive resistant steel lag bolts. To evenly distribute the load across
the roof rafters, there shall be a minimum of 2 mounting brackets per rafter & min. 3"penetration of lag
bolt per bracket, which is adequate to resist all 125mph wind live loads including wind shear. Per NDS
Section 11.1.4 clearance holes equal to the diameter of the shank need to be bored into primary a primary
framing member for the full length to the threaded portion of the screw to avoid splitting of the framing
member.
,soN Of 448g,4C
Thank you. o‘ EX,.&,o.22 yGs
' NICOLAS A.
Westshore Design Engineers NITTI
CIVIL
4 NO. 50222
10/13/2021 -tess oNAi.EN'`���
John Eibert Nicolas Nitti, P
Project Coordinator President
WestShore Design Engineers 1 100 Great Oaks Blvd. II Suite 115 I Albany,NY 12203 1518.313.7153
12 WEST CENTER ST EP-2021-1064
COMMONWEALTH OF MASSACHUSETTS
CITY OF NORTHAMPTON
Map: 23A
Lot:053 ELECTRICAL PERMIT
Permit: Electrical
Category: INSTALL 17 PANEL 5.78 KW SOLAR SYSTEM ON ROOF
Permit# Electrical
PERMISSION IS HEREBY GRANTED TO:
Project# JS-2021-002525
Est.Cost: Contractor: License:
Fee: $60.00 TRINITY SOLAR MASTER ELECTRICIAN 21233
Owner: GIORDANO LESLIE A
Applicant: TRINITY SOLAR
AT: 12 WEST CENTER ST
Applicant Address Phone Insurance
4 OPEN SQUARE WAY, SUITE 410 ATTN: APPLICATIONS D (413) 203-9088 () C- Liability,
GL201900013378
H O LYO K E MA01040 ISSUED ON:6/21/2021 0:00:00
TO PERFORM THE FOLLOWING WORK:
INSTALL 17 PANEL 5.78 KW SOLAR SYSTEM ON ROOF
Call In Date: Date Requested Inspection Date/SignOff: Reinspect?:
Trench/UG: ¢' /f 'i3
Special Instructions
Rough • I
x
Special Instructions:
Final: /6 - '3 ` a(
SRE Called In: 30401871
Signature:
Fee Type:: Amount: DatePaid
Electrical $60.00 6/21/2021 0:00:00 8716
212 Main Street,Phone(413)587-1244,Fax(413)587-1272-Inspector of Wires -Roger Malo