Loading...
44-140 (4) 264 OLD WILSON RD COMMONWEALTH OF MASSACHUSETTS BP-2021-1820 Map:Block:Lot:44-140-001 Permit: Solar Build CITY OF NORTHAMPTON PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2021-1820 PERMISSIONIS HEREBY GRANTED TO: Project# Js-2021-002399 Contractor: License: PIONEER VALLEY Est.Cost: 45845 PHOTOVOLTAICS 111266 Const.Class: Exp.Date:03/14/2023 BROADBENT, ERICSSON & SUSAN LEIGH Use Group: Owner: MACRAE Lot Size (sq.ft.) Zoning: Applicant: PIONEER VALLEY PHOTOVOLTAICS Applicant Address Phone: Insurance: 311 WELLS ST -SUITE B (413)772-8788 375928710101 GREENFIELD, MA 01301 ISSUED ON:09/16/2021 TO PERFORM THE FOLLOWING WORK: ROOF MOUNT SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature:1 19 'r . e 5111 . 1 If Fees Paid: $75.00 212 Main Street, Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner -- 4wEEO —572UCrt)wL- LeETJ_ ok CkLLGO 9-1 LeF FTl'-'15G m I----- --- - Ijj Z-4 ^hll o 3 >. LS The Commonwealth of Massachusetts i c am, Board of Building Regulations and Standards MUNICIPALITYFOR r c iI i.' Massachusetts State Building Code, 780 CMR c,.> �IJ'i USE ° = Building Permit Application To Construct, Repair, Renovate Or Demolish a Revised Mar 2011 D , co \ One-or Two-Family Dwelling om o M This Section For Official Use Only rn-i r O z Building Pe •t Number: g�J-d,l - t 1.2-0 Date Applied: ,_ _ cn 7-e-- L-Vrti? U �S // Building Official(Print Name) Signature Date SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 264 Old Wilson Rd.Northampton MA 01062 //Z./ 1.1 a Is this an accepted street?yes. no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone: Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yes!: SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Ericsson Broadbent Northampton MA 01062 Name(Print) City,State,ZIP 264 Old Wilson Rd 978-906-5592 ebroadbent@mac.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg. 0 Number of Units Other El Specify:solar PV Brief Description of Proposed Work`:Installation of a root mounted solar array SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: (Labor and Materials) Official Use Only 1. Building $45,845.00 I. Building Permit Fee: $75 Indicate how fee is determined: 2. Electrical $ ❑Standard City/Town Application Fee ❑Total Project Cost3(Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees: $ (pJ Check No.01443bCheck Amount: / Cash Amount: 6. Total Project Cost: $45845 0 Paid in Full 0 Outstanding Balance Due: Sava 4 RF Q PV Squared Solar I www.pvsquared.coop Phone:413-772-8788 I Fax:413-772-8668 311 Wells St.,Ste. B I Greenfield,MA 01301 44,'orSp`'PP MA Elec. Lic.A13764 I MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Maya Fulford Installation Manager SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-111266 03/14/2021 Daniel Gomez-Gonzalez License Number Expiration Date Name of CSL Holder List CSL Type(see below) u 43 Hatfield Street No.and Street Type Description U Unrestricted(Buildings up to 35.000 cu.ft.) Northampton MA 01060 R Restricted l&2 Family Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 413-772-8788 BUILDINGPERMITS@PVSOUARED.COOP I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 140077 9/15/2021 PIONEER VALLEY PHOTOVOLTAICS COOP HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 311 WELLS STREET BUILDINGPERMITS@PVSOUARED.000P No.and Street Email address GREENFIELD MA 01301 413-772-8788 City/Town, State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes p No . ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Pioneer Valley Photovoltaics Cooperative to act on my behalf,in all matters relative to work authorized by this building permit application. SEE ATTACHMENT (A) Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. II/23/20 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" DocuSign Envelope ID:EBCF9669-B912-486C-95DE-ECF2763F5607 Attachment A PV Squared is committed to providing a high quality product and service and we look forward to working with you on your renewable energy project. Sincerely, Pioneer Valley PhotoVoltaics Cooperative Jonathan Child Design and Sales Team Attachments: A—PV Array Sketch General Terms and Conditions Right of Rescission AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes.A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date Ericsson B Broadbent III 4/6/2021 I 11:37 AM PDT Printed Name Date DocuSigned by. f YicsS01n. f V'OOJJIUAJ (It System Owner BBCOeEBFF13249A Signature Title Make a Payment Online Proposal and Agreement#00016369 Page 7 of 13 Eric Broadbent and Susie Macrae-March 31,2021 Commonwealth ot Massachusetts Division of Professional Licensure Board of Building Regulations and Standards Const r-uetil tipervisor C 1 1266Expires: 03114/2023 DANIEL GOMEZ-GONZALEZI Jr. 43 HATFIELD STREET • NORTHA M PTON MA 01060 tlf Commissioner ctd / ric , Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement Contractor Registration Type: Supplement Card PIONEER VALLEY PHOTOVOLTAICS COOP Registration: 190077 311 WELLS ST SUITE B Exppi ration: 09/15l2021 GREENFIELD,MA 01301 sch A zai�•osnr Update Address and Return Card. Office of Consumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Supplement Card before the expiration date. If found return to: Registration Expiration Office of Consumer Affairs and Business Regulation 140077 0911512021 1000 Washington Street •Suits 710 PIONEER VALLEY PHOTOVOLTAICS COOP Boston,MA 02118 >' f! fit MAYA FULFORD V% l 311 WELLS ST SUITE B ,r..+'..f.l'.�t�.• GREENFIELD,MA 01301 Undersecreta Ot vali ithout signs e ry 00 DATE(MM/DD/YYYY) A�ORCP CERTIFICATE OF LIABILITY INSURANCE 12/22/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Kathy Parker NAME: Webber&Grinnell PHONE (413)586-0111 FAX (413)586-6481 (A/C,No,Ext): (A/C,No): ) 8 North King Street E-MAIL kparker@webberandgrinnell.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIL# Northampton MA 01060 INSURER A: Ohio Casualty/Liberty 24074 INSURED INSURER B: Ohio Security/Liberty 24082 Pioneer Valley PhotoVoltaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: CL20122214681 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 �/ DAMAGE TO REN FED 300,000 CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $ MED EXP(Any one person) $ 15,000 A BKS57072282 01/01/2021 01/01/2022 PERSONAL BADVINJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER. GENERAL AGGREGATE $ 2,000,000 PRO00 - POLICY JECT LOC PRODUCTS-COMP/OP AGG $ 2,OO" OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) ANY AUTO BODILY INJURY(Per person) $ B - OWNED / SCHEDULED BAS57072282 01/01/2021 01/01/2022 BODILY INJURY(Per accident) $ AUTOS ONLY /'• AUTOS X HIRED Ne NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY _ AUTOS ONLY (Per accident) Underinsured motorist $ 300,000 UMBRELLA LIAB Z-i-O'V RREN E"'' 5,000,000 OCCUR EACH OCCURRENCE $ A - EXCESS LIAB CLAIMS-MADE US057072282 01/01/2021 01/01/2022 AGGREGATE $ 5,000,000 DED X RETENTION$ 10,000 $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER Y N C ANY PROPRIETOR/PARTNER/EXECUTIVE N NIA 375928710101 01/01/2021 01/01/2022 E.L.EACH ACCIDENT $ 1,000'000 OFFICER/MEMBER EXCLUDED'? (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E L DISEASE-POLICY LIMIT $ Business Pers Property $1,820,700 Commercial Property A BKS57072282 01/01/2021 01/01/2022 Installation $25,000 Transportation $75,000 DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) Worker's compensation includes MA and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Proof of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts 1 _1 _ 1, Department of Industrial Accidents _ �1=_ 1 Congress Street, Suite 100 r Boston, MA 02114-2017 We'sl_ wwn mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 48 employees(full and/or part-time).* 7. ❑ New construction 2.0 I am a sole proprietor or partnership and have no employees working for me in 8. 111 Remodeling any capacity.[No workers'comp.insurance required.] 3.0I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. ❑Demolition 4.0 I am a homeowner and will be hiring contractors to conduct all work on my property. I will 10 ❑ Building addition ensure that all contractors either have workers'compensation insurance or arc sole 11.Q Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.0 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13. Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 6.0 We are a corporation and its officers have exercised their right of exemption per MGL c. 14.ID Other Solar PV 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Continental Indemnity/AUW Policy#or Self-ins. Lic. #:37-592871-01-01 Expiration Date:01/01/2022 Job Site Address: 264 Old Wilson Rd city/state/zip:Northampton MA 01062 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer,: /r t e a s 'nd penalties of perjury that the information provided above is true and correct. Signatu �/� �+�%, Date:8/20/2021 Phone#:413-7L-87`8 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: ' • • 4� 1 ` k OST TRUSTED R E C 0,,,, 4., .. ', .. i .i , , ::ItN.0.• ? t: . t ) ,I ,te w as; t` *. 7 `1 1‘,' REC ALPHoc , ' BLACK SERIES I 1, i, PRODUCT SPECIFICATIONS 7000160 inter EXPERIENCE RF award 375wp 25 YEAR 19.9 /F-Tz 2020 WINNER IR ELI ELE PERFORMANCE i New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.rugg@NewEnglandConstructionEngineering.com September 15, 2021 Ms. Simone Audette Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street, Suite B Greenfield, MA 01301 Re: Broadbent & Macrae Residence, Northampton, MA NECE Project No. 21-001 T88 Dear Ms. Audette, At your request New England Construction Engineering, PLC (NECE) has reviewed the information that you provided on the roof and supporting structure of the attached garage at the Broadbent & Macrae residence, at 264 Old Williston Road, in Northampton, MA. The purpose of the review was to provide an opinion regarding the roofs' capacity to support rooftop mounted Photovoltaic (PV) panels. The proposed PV array and roof truss design information that you provided is attached to this letter for reference. You are proposing to mount PV panels on one side of the roof of the attached garage. The house is a recently constructed residence. You have provided architectural drawings by Wright Builders, dated September of 2020. You have also provided roof truss design output by Universal Forest Products. These truss design plans bear the seal of a Professional Engineer registered in the Commonwealth of Massachusetts. The Engineer's seal is dated October of 2020. The roof is 26' wide. The roof is supported by manufactured wood roof trusses at 2' O.C. The trusses were design for a 35psf top chord load. This is the minimum flat roof snow load for Northampton. The trusses were also design for a 15psf top chord dead load, and a 10psf bottom chord dead load. Since the trusses include a storage space, a portion of bottom chord is also designed for a 20psf storage load. NECE's review included the controlling gravity load combination (dead load, live load and snow load). Conclusion: Based on my review of the information that you provided, I conclude that, the garage roof will adequately support your proposed PV array. I base this opinion on the following. The PV panels will be installed parallel to the roof, eliminating additional wind load. The ground snow load (Pg) for Northampton is 40 psf. The minimum flat roof load (Pf) is 35psf. I assume that the building was constructed as designed, and that the roof trusses were constructed and installed in New England Construction Engineering. PLC PV Squared— Broadbent & Macrae Residence Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 accordance with the truss design. According to information that you provided on similar projects; the proposed PV panels weigh approximately 2.3psf. In summary, built and installed as designed, garage roofs will support your proposed PV array. Thank you for the opportunity to assist with this project. Please contact me if NECE can be of further assistance. z ��y Sincerely, JONATHAN A f RUGG No. 51982 /Jonathan Rugg, P.E. ' New England Construction Engineering, PLC. • 2 /20 1 el REC PRODUCT SPECIFICATIONS SOLAR'S MOST TRUSTED ICERTIFICATIONS 1721±2.5[67.ato.t] IEC 61215:2016,IEC 61730:2016,UL 1703,UL 61730 -28[1.1] 811[31.91 455 117.9] - - ti , �' IEC 62804 PID + IEC 61701 Salt Mist ��� t000[39 a] IEC 62716 Ammonia Resistance y • UL 1703 Fire Type Class 2 6.ot6.2 IEC 62782 Dynamic Mechanical Load (0.24±0.01] IEC 61215-2:2016 Hailstone(35mm) ci .� AS4040.2 NCC 2016 Cyclic Wind Load • 15014001:2004,ISO9001:2015,OHSA518001:2007,IEC 62941 o r O. C E 0 ul(0.43t0.01] ♦WARRANTY Standard REC ProTrUSt F 20.5±0.5 ' c (0.8t0.021 1200147.21 - Installed by anREC Certified Solar Professional No Yes Yes 1 1/"- - T 1 System Size All 425 kW 25-500 kW ► - 4511.81 22.5[0.91 - 621±3(24.5±0.121 . Product Warranty(yrs) 20 _ 25 25 i- ]t30[1.2] Power Warranty(yrs) 25 25 25 t, Measurements in mm linl Labor Warranty(yrs) 0 25 10 fGENERAL DATA Power in Year 1 98% 98% 98% 120 half-cut cells with REC Staubli MC4 PV-KBT4/KST4,12AWG(4 mm2) Annual Degradation 0.25% 0.25% 0.25% Cell type: heterojunctioncelltechnology Connectors: in accordancewithlEC62852 Power inYear25 92% 92% 92% 6 strings of 20 cells in series IP68 only when connected See warranty documents for details.Conditions apply. Glass: 0.13in(3.2 mm)solar glass with Cable: 12AWG(4mm2)PVwire,39+47in(1+1.2m)in t MAXIMUM RATINGS anti-reflection surface treatment accordancewithEN50618 Highly resistant Operational temperature: -40...+185°F(-40...+85°C) Backsheet: polymeric construction(black) Dimensions: 678x40x1.2in(1721x1016x30mm) Maximum system voltage: 1000 V Frame: Anodized aluminum(black) Weight: 43 lbs(19.5 kg) Maximum test load(front): +7000Pa(146lbs/sgft)' 3part.3bypassdiodes,IP67rated Maximum test load(rear): -4000Pa(83.5lbs/sgft)' Junction box: naccordancewithlEC62790 Origin: Made in Singapore Max series fuse rating: 25A .o tELECTRICAL DATA Product Code':RECxxxAA Black Max reverse current: 25 A .g Power Output-PMAx(Wp) 355 360 365 370 375 'See installation manual far mounting instructions. _. . . Design load•Test load/1.5(safety factor) o;�o Watt Class Sorting-(W) -0/+5 -0/+5 -0/+5 -0/+5 -0/+5 Nominal Power Voltage-VMrr,(V) 36.4 36.7 37.1 37.4 37.8 ♦TEMPERATURE RATINGS* P. lai u Nominal Power Current 9.77 9.82 9.85 9.90 9.94 Nominal Module Operating Temperature: 44°C(:2°C) I-vi Open Circuit Voltage-Va(V) 43.6 43.9 44.0 44.1 44.2 Temperature coefficient of PM x: -0.26%/°C o Short Circuit Current-Is((A) 10.47 10.49 10.52 10.55 10.58 Temperature coefficient of Voc: -0.24%/°C Power Density(W/sq ft) 18.9 19.1 19.4 19.7 19.9 Temperature coefficient of lsc: 0.04%/°C n o Panel Efficiency(%) 20.3 20.6 20.9 21.2 21.4 'The temperature coefficients stated are linear values 410 LOW LIGHT BEHAVIOUR Power Output PMax(Wp) 271 274 278 282 286 Nominal Power Voltage-VM�(V) 34.3 34.6 35.0 35.2 35.6 I- TypicallowirradianceperformanceofmoduleatSTC: ri o 0 Nominal Power Current-IMm(A) 7.89 7.93 7.96 8.00 8.03 ,, Z Open Circuit Voltage-Va(V) 41.1 41.4 41.5 41.6 41.6 ° A Short Circuit Current-Is,(A) 8.46 8.47 8.50 8.52 8.55 W 0 Values at standard test conditions(STC:air mass AM1.5,irradiance 10.75W/sgft(1000W/m')temperature 77T(25Y)based onaproduction c ' f spread with a tolerance of P V &IK:3%within one watt class.Nominal module operating temperature(NMOT:air mass AMIS.irradiance - ,• - w M M M .. 0. 800 W/m2,temperature 68'(2UDC),windspeed 3.3 ft/s(1 m/s).'Where xxx indicates the nominal power class(P.0 jat STC above. Irradiant.(W/m') ix Founded in 1996,REC Group is an international pioneering solar energy ®` RE C company dedicated to empowering consumers with clean,affordable solar power.As Solar's Most Trusted,REC is committed to high quality, innovation,and a low carbon footprint in the solar materials and solar www.recgroup.com panels it manufactures. Headquartered in Norway with operational Di '13 headquarters in Singapore,REC also has regional hubs in North America, Europe,and Asia-Pacific. - 1 0.4 PROJECT INFORMATION 5QU4 • Owner Broadbent_Macrae Residence N Q �A^`o • Address: 264 Old Wilson Road „ Northampton.MA k���'>' • System Size: 15.33 kW DC c+Re • so`• 10 kW AC(PV&Storage) 19.4 kWh(Storage) SERVICE DISCONNECT&UTILITY METER PV SQUARED SOLAR SYSTEM DETAILS SOLAR PV/ESS RAPID SHUTDOWN DISCONNECT 311 WELLS STREET.SUITE B • Modules (42) REC375AA &SOLAR SMART PRODUCTION METER cREENrielo,MAo+eTe • Inverters- (1)SolarEdge Energy Hub SE10000H-US .+n """-el VSOUA ocOOP • Optimizers (42)SE P370 • Storage(ESS) (2)SolarEdge Energy Banck 9.7 kWh BROADBENT MACRAE • Rail: IronRidge XR100 (PV AND STORAGE) • Bases. AceClamp A2 26,OLD WLSON ROAD NORTNAMPTON.MA DESIGN CRITERIA • Ground Snow Load: 40(pfs) • Design Snow Load' 35(pfs) • Design Wind Speed 117(mph) • Exposure Category. B • Risk Category II i AUTHORITY HAVING JURISDICTION • • Building- Kevin Ross (413)587-1239 • Electncal- Roger Malo (413)587-1244 - i • Code Ref NEC 2020(MA) • Electncal Utility. NGRID PROJECT NOTES. • 0 / MAIN ELECTRICAL PANELS ---"re"."."----er------------"r::: (BASEMENT) SOLAR PV&ESS EQUIPMENT •• (BASEMENT) 1 LO '- Li-Ion BATTERY/ESS • \``` ' (BASEMENT) SITE PLAN& J PROJECT INFO. DATE. e/24R021 BY ME [ll + SCALE NOSG'E SIZE 11 ) ®AERIAL MAP OSITE PLAN PV-M 1 A tin''G SCALE B NOT 10 SCALE ARRAY NOTES: SQU4, a 1. Unless otherwise noted bases are staggered and spaced not Q .Q more than 48"O.C. 431- 2. Additional or alternative bases may be used to meet actual roof conditions. kt♦��ef ROOF SPECIFICATIONS: 44, " so` Material Standing Seam 16"OC(1-3/8"x 1/4") PV SQUARED SOLAR Attachment Structure Roof Seam Pitch 22° Azimuth 195° 311 WELLS STREET,SUITE El GREENFIELD,MA 01376 W W W.PVSOUARED.COOP MODULE SPECIFICATIONS: 411.772a76e Make&Model: REC365AA Black X Roof 638" X BROADBENT_MACRAE Length(in) 67.8 1" (PV AND STORAGE) Width(in) 40.0 XArray 6054 X 264 OLD WILSON ROAD Height(mm) 30.0 X Section 363" X -Gap 1212" i-- Section 12 4" -1' Ndi7NAN1PTON"" Long Side Min(in) 8.1 Long Side Max(in) 23.8 I7�20�" - Short Side Min(in) 3.9 . (, i i Short Side Max 9.8 ♦ (in) e • • ♦ 4 • o i. , • - — ° -1 ? RAIL SPECIFICATIONS Make&Model: Ironridge XR100 • _ Mod Clamp Torque: 80 in-lbs r41.7. L-Foot/Rail Torque: 250 in-lbs • • • 4 • - 7 • •' 4 - • • 4 Co) N Max Span: 70" ON a Max Cantilever: 28" M ` 0 STRUCTURE ATTACHMENT SPECIFICATIONS - I• co Q i Make&Model: AceClamp A2 ' - .- • • m - • • m v • m • Roof Seam Torque: 165 in-lbs X " (17')204" i or 264" •sr (' 1�" N Clamp/L-Foot Torque: 125 in-lbs 11ff I + • \I.-- —• • m T 4 • ' T >t \ r 8" 8. i I — t 4" - Base Rail Standing Seam 16"OC • ARRAY LAYOUT& .F— 67�" �f MODULE INFO. ° c__ DATE: 8I24/2021 BY MF 1 16 .IL— 40" —7Y SCALE AS SHOWN SIZE 1107 ®MODULE DETAIL ®SCALE Custom ARRAY LAYOUT PV-M2 p` QU4 R o PV SQUARED SOLAR 311 WELLS STREET.SUITE B GREENFIELD MA 01316 W W W PVSOUARED.COOP 4 1111I-6166 BROADBENT_MACRAE (PV AND STORAGE) 264 OLD WLSON WAD NORTHAMPTON.MA MODULE MAP DATE: 6/24R021 BY ME SCALE. NO SCALE SIZE 1107 PV-M3 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder setup o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities