Butler-PlansetRELEASEREVDATE NAMEGOVERNING CODESPARCEL MAP PROJECT LOCATION
SHEET INDEX
ENGINEERED BY:
CONTRACTOR:
CONTRACTOR LIC #:
PHONE:
CONTACT NAME:
PHONE:
EMAIL:
DESIGN BY:
PHONE:
HOME OWNER PROJECT LOCATION:
PROJECT DRAFTER:
LICENSE #:
PHONE:
ELECTRICAL UTILITY:
AUTHORITY HAVINGJURISDICTION:
BUILDING:
CONTACT NAME:PHONE:
LICENSE TYPE:
PHONE:
EMAIL:
EMAIL:
PHONE:COVER SHEETSHEET SHEET TITLE
EMAIL:APNAdvanced Solar Solutions39650 MallardBass Lake, CA 93604
PHONE: 559-321-7000EMAIL: info@advpermits.com ADDRESS ADDRESS kW PHOTOVOLTAIC PLANS PROJECT APN:
GENERAL PROJECT & JURISDICTIONAL NOTES
1. UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT EXPRESSEDWRITTEN PERMISSION FROM THE CONTRACTOR AND ADVANCED SOLAR
SOLUTIONS IS A VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT
TO CIVIL DAMAGES AND PROSECUTION.
APPLICABLE BUILDING CODES:
INTERNATIONAL BUILDING CODE
INTERNATIONAL RESIDENTIAL CODE
INTERNATIONAL FIRE CODE
NATIONAL ELECTRIC CODE
DESIGN CRITERIA
BUILDING OCCUPANCY:
RISK CATEGORY:
EXPOSURE CATEGORY:
SNOW LOAD:
SNOW EXPOSURE:
CONSTRUCTION TYPE:
SCOPE OF WORK
NUMBER
PROPOSED SOLAR EQUIPMENT SITE / PROJECT DETAILS
QTY. EQUIPMENT DESCRIPTION/MFG/MODEL
MODULES
INVERTER(S)
RACKING
STANCHIONS
RSD DEVICE
BATTERIES
SYSTEM SIZE DC
SYSTEM SIZE AC
QTY. STRING/CKT.
ELECT. SERVICE
PROJECT TEAM LIST
COPYRIGHT NOTICE
1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH ALL
OSHA REGULATIONS.
2. PENDING LOCAL JURISDICTIONAL REQUIREMENTS AND WHEN APPLICABLEALL ELECTRICAL ENCLOSURE DEAD FRONTS, COVERS, DOORS, ETC. SHALE BE
OPEN AND ACCESSIBLE FOR INSPECTIONS. WHEN TRENCH AND ROOF INSPECTIONSARE REQUIRED WORK SHALL BE OPEN AND ACCESSIBLE FOR INSPECTOR.
INSPECTION REQUIREMENTS
1. WHEN APPLICABLE A SMOKE DETECTOR, APPROVED AND LISTED BY THE
STATE FIRE MARSHAL OR ANSI/UL 217 CERTIFIED TO NATIONAL FIRE ALARM
AND SIGNALING CODE, NFPA 72 SHALL BE VERIFIED FUNCTIONAL OR INSTALLED
IN ALL APPLICABLE CODE REQUIRED LOCATIONS.
2. ALL APPLICABLE EQUIPMENT TO BE UL LISTED OR LISTED BY OTHERJURISDICTIONAL AND UTILITY APPROVED ASSOCIATION OR NATIONALLY
RECOGNIZED ORGANIZATION.
3. FULL SCOPE OF WORK SHALL COMPLY WITH ALL APPLICABLE CODES LISTED
IN GOVERNING CODES SECTION, ALL MANUFACTURES' LISTINGS, INSTALLATION
INSTRUCTIONS AND SPECIFICATIONS AND JURISDICTIONAL REQIREMENTS.
JURISDICTIONAL & LISTING REQUIREMENTS
4. REVISED PLANS WILL BE REQUIRED TO BE RESUBMITTED TO THE LOCALJURISDICTION IF THE INSTALLED ARRAY AND ASSOCIATED EQUIPMENT DOES
NOT MATCH THE APPROVED BUILDING PLANS. ADDITIONAL FEES MAY ALSOAPPLY.
5. THE PLACEMENT OF A UTILITY PV PRODUCTION METER SHALL BE PROVIDEDAND PLACED BY THE CONTRACTOR AS PER APPLICABLE UTILITY OR AHJREQUIREMENTS.
MSP RATINGS
COMBINER(S)
AZIMUTH
TILT
ROOF COVERING
NORTH
⅊
DRIVEWAY
℄JAMES AVEVERNON ST⅊
⅊
⅊
N/A
VB
4.070 KW
PV-001 COVER SHEET
Butler, Stephen
Jake Stocker
2015
National Grid
2015
79106403
2015
21134A(413) 584-8844
2020
Lilian Wanjiku(413) 584-8844 City of Northampton
jstocker@valleysolar.solar
50507Civil(202) 874-3483swyssling@wysslingconsulting.com
R-3
II
C
40
Scott E. Wyssling
76 North Meadowbrook Dr
(413) 584-8844 Alpine, UT 84004
jstocker@valleysolar.solar
Butler, Stephen94 Vernon St, Northampton, MA 01060
ROOF MOUNTED PV (SOLAR) PROJECT GRID-TIED
WITH BATTERY STORAGE
340 Riverside Dr
Valley Solar
Florence, MA 01062
REC REC370AA BLKEnphase IQ7PLUS-72-2-US (240V)
SnapNrack Ultra Rail UR-60
Snapnrack 242-01220 L Foot
INTEGRATED IN INVERTER
Enphase Encharge 10
1111
N/A
28N/A
1
1
(E)
COORDINATES: 42.32045933753292, -72.65125192833814
3.245 KW
1
120/240V - 1
34°
222°
MAX ARRAY HGT.
117
N/AComp Shingle
N-001 GENERAL NOTES
PV-100R PV ARRAY LAYOUT
S-100 RACKING LAYOUT
S-200 SECTION ELEVATION
S-201 ATTACHMENT DETAILS
E-001 EQUIP. CALCULATIONMETER NUMBER:E-002 WIRE AND COND. CALCS
E-003 THREE LINE DIAGRAM
E-100 ELECTRICAL LAYOUT
P-001 STANDARD PLACARDS
P-002 DYNAMIC PLACARDS
R-1xx EQUIP.CUT SHEETS
Enphase X-IQ-AM1-240-3
100A BUS/100A MAIN BREAKER
LINE-SIDE TAP PV-001ASCE 7-10 WIND SPEED:Valley Solar21134A340 Riverside DrFlorence, MA 01062(413) 584-88444.070Butler, Stephen94 Vernon StNorthampton, MA 0106008/05/2021SUBMIT FOR PERMIT
RELEASEREVDATE NAME ADDRESSAPNGENERAL NOTES ADDRESS kW PHOTOVOLTAIC PLANS
GENERAL NOTES:*
PROPER ACCESS AND WORKING CLEARANCE AROUND
EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE
PROVIDED AS PER SECTION NEC 110.26.
PV SYSTEM COMPONENTS; INCLUDING BUT NOT LIMITED
TO, MODULES, INVERTERS AND SOURCE CIRCUIT
COMBINERS ARE IDENTIFIED AND LISTED FOR USE IN PV
SYSTEMS IN COMPLIANCE WITH NEC 690.4 AND 690.6
AND ALL UL, IEC, IEEE CLASSIFICATIONS AS
REQUIREMENTS.
RAPID SHUTDOWN NOTES:*
PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDIDNG
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT
CONTROLS SPECIFIC PV CONDUCTORS IN ACCORDANCE
WITH 2020 NEC 690.12(A)-(D)
EQUIPMENT LOCATIONS &