Loading...
609 Title V Installation Final Inspection Report 8-2021/Z�� . iicy L],,�of Northampton Heath Dept,, 2-1-2 bion Street Northampton, MA,,, 01060 REV On August 12, 2021 1 conducted. the final inspection ®f an on lot septic system installed by Duffy and Willard Construction© (413) 427 0626 Location.- 609 Cole Mead®W Rd, Northampton. Owner-, Felicia Biaiici Map ?, lot Observations: The system appears to be installed in compliance with 3 ) I OC MR 15. 00 Signed. - Charles Kaniecki, Witness for the City. Page 1 of 3 '4� A In let baffle Page 2 of 3 �1 It Out let baffle with It Distribution Box Page 3 of 3