Loading...
13-073 (43) ALLIED TESTING LABORATORIES, 115 St George Road • Springfield, Massachusetts 01 104 /3 73 Phone: (4 13) 736-1846 Fax: (4 13) 736-1838 ;ONCRETE FIELD REPORT NO. 2 DATE: 11/25/03 Client: Delphi Construction, Inc. Project: Rock Ridge @ Northampton, MA Assisted Living Facility Contractor: Delphi Construction, Inc. / Valley Concrete Producer: Bill Willard Concrete Location of Concrete Placement: Elevator Pad Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard, Project Manager CYLINDER FABRICATION - ASTM C31 DATE CAST: 11/25/03 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:00 -- 3000 4 1/4' Elevator Pad SLUMP TESTS - ASTM C143 AIR CONTENT TESTS - ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content (%) 13:00 -- 4 1/4" 13:00 -- 5.8% AMBIENT TEMPERATURE CONCRETE TEMPERATURE - ASTM C1064 Time Temperature Time Truck No. Temperature 13:00 45°F 13:00 -- 66°F Weather: Sunny/Clear Temp: 40's No. Yds: 6 DEC - Respectfully submitted, 2003 ALLIED ��ESTING L RATORIES, INC. a-4-01:(4" By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 1 I S St George Road • Springfield, Massachusetts 01 104 Phone: (4 13) 736-1846 Fax: (413) 736-1838 :ONCRETE FIELD REPORT NO. 2 DATE: 11/25/03 Client: Delphi Construction, Inc. Project: Rock Ridge @ Northampton, MA Assisted Living Facility Contractor: Delphi Construction, Inc. / Valley Concrete Producer: Bill Willard Concrete Location of Concrete Placement: Elevator Pad Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard, Project Manager CYLINDER FABRICATION - ASTM C31 DATE CAST: 11/25/03 IDENTIFICATION TIME TRUCK CLASS SJP EXACT LOCATION A,B,C,D 13:00 -- 3000 41111111111 Elevator Pad SLUMP TESTS - ASTM C143 AIR CONTENT TESTS - ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content (%) 13:00 -- 4 1/4" 13:00 -- 5.8% AMBIENT TEMPERATURE CONCRETE TEMPERATURE - ASTM C1064 Time Temperature Time Truck No. Temperature 13:00 45°F 13:00 -- 66°F Weather: Sunny/Clear Temp: 40's No. Yds: 6 Respectfully submitted, SEC - 1 2003 ALLIED ESTING L RATORIES, INC. \ \ - aga. By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ro ALLIED TESTING LABORATORIES, INC. 115 St.George Road • Springfield, Massachusetts 01104 Phone: (413) 736-1846 Fax: (413) 736-1838 CONCRETE FIELD REPORT NO. 3 DATE: 11/26/03 Client: Delphi Construction, Inc. Project: Rock Ridge @ Northampton, MA Assisted Living Facility Contractor: Delphi Construction, Inc. / Valley Concrete Producer: Bill Willard Concrete Location of Concrete Placement: Southwest Footing Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard, Project Manager CYLINDER FABRICATION - ASTM C31 DATE CAST: 11/26/03 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 15:30 15 3000 3 3/4" Southwest Footing SLUMP TESTS - ASTM C143 AIR CONTENT TESTS - ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content (%) 15:30 15 3 3/4" 15:30 15 6.4% AMBIENT TEMPERATURE CONCRETE TEMPERATURE — ASTM C1064 Time Temperature Time Truck No. Temperature 15:30 44°F 15:30 15 66°F Weather: Clear Temp: 40's No. Yds: 20 1/2. __ Ji7 _ DEC - l 2003 Respectfully submitted, ALLIED ESTIN/GG L RATORIES, INC. /. By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St.George Road • Springfield, Massachusetts 01 104 Phone: (4 13) 736-1846 Fax: (41-3) 736-1838 CONCRETE FIELD REPORT NO. 3 DATE: 11/26/03 Client: Delphi Construction, Inc. Project: Rock Ridge @ Northampton, MA Assisted Living Facility Contractor: Delphi Construction, Inc. / Valley Concrete Producer: Bill Willard Concrete Location of Concrete Placement: Southwest Footing Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard, Project Manager CYLINDER FABRICATION - ASTM C31 DATE CAST: 11/26/03 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 15:30 15 3000 3 3/4" Southwest Footing SLUMP TESTS - ASTM C143 AIR CONTENT TESTS - ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content (%) 15:30 15 3 3/4" 15:30 15 6.4% AMBIENT TEMPERATURE CONCRETE TEMPERATURE — ASTM C1064 Time Temperature Time Truck No. Temperature 15:30 44°F 15:30 15 66°F Weather: Clear Temp: 40's No. Yds: 20 1/2 DEC - 2003 Respectfully submitted, ALLIED ESTING L RATORIES, INC. l/ li;�(r� By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. Dec U4 U:3 DJ: boa Ue t pn i Lonstruct:i on inc 1 u /d Sri Y:, r , N, ALLIED TESTING LABORATORIES, INC. 115 St George Road • Springfield,Massachusetts 01 104 Phone:(413) 736-1846 Fax:(413) 736-1838 COMPRESSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS—ASTM C39 • REPORT NO: 1 CLIENT: Delphi Construction, Inc. PROJECT: Rock Ridge @ Northampton, MA - Assisted Living Facility LOCATION OF CONCRETE PLACEMENT: Basement Footing, Line 017 thru F16 Clockwise REPORTED TO: Delphi Construction, Inc.-Att: Mr. Paul Leonard DATE: 12/1/03 CONCRETE CLASS 3000 Mixture Weights per cubic yard DEC Cement (Ibs) Fine Aggregate (Ibs) Coarse Aggregate (Ibs) DEC - 3 2003 Water (gals) Admixture (oz) ' • LABORATORY NO. A-135 Specimen No. A Slump (in) 2" Entrained Air Content (°%) 4.77 Concrete Temp. 70°F Date Sampled 11/24/03 Date Received 11/25/03 Date Tested 12/1/03 Age at Test (days) 7 Dimensions (in) 6x12 Area (sq in). 28.3 Wgt. of Specimen (Ibs) 29.6 Total Load (lbs) 87,890 COMPRESSIVE STRENGTH (psi) 3110 Remarks. Respectfully submitted, ALLIED TESTING BORATORIES, INC. Copy: LaC I By: Chester V. Dawicki • tr:=2 -Lij=17 ALLIED TESTING LABORATORIES, INC. 115 St.George Road • Springfield,Massachusetts 01104 fee, Phone: (413) 736-1 846 Fax: (413) 736-1838 CONCRETE FIELD REPORT NO. 1 DATE: 11/24/03 Client: Delphi Construction, Inc. Project: Rock Ridge @ Northampton, MA Assisted Living Facility Contractor: Delphi Construction, Inc. Producer: Willard Concrete Location of Concrete Placement: Basement Footing, Line 017 thru F16 Clockwise Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard, Project Manager CYLINDER FABRICATION - ASTM C31 DATE CAST: 11/24/03 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 21 3000 2" Basement Footing, Line 017 Thru F16 Clockwise SLUMP TESTS - ASTM C143 AIR CONTENT TESTS - ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content (%) 13:30 21 2" 13:30 21 4.7% AMBIENT TEMPERATURE CONCRETE TEMPERATURE - ASTM C1064 Time Temperature Time Truck No. Temperature 13:30 50°F 13:30 21 70°F Weather: Sunny Temp: 50's Respectfully submitted, ': !� DEC - 1 2003 ALLIED TESTING L RATORIES, INC. ///' ax,(y.e.4. By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. • fz==iiij=1:7 ALLIED TESTING LABORATORIES, INC. 115 St.George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Fax: (413) 736-1838 CONCRETE FIELD REPORT NO. 1 DATE: 11/24/03 Client: Delphi Construction, Inc. Project: Rock Ridge @ Northampton, MA Assisted Living Facility Contractor: Delphi Construction, Inc. Producer: Willard Concrete Location of Concrete Placement: Basement Footing, Line 017 thru F16 Clockwise Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard, Project Manager CYLINDER FABRICATION - ASTM C31 DATE CAST: 11/24/03 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 21 3000 2" Basement Footing, Line 017 Thru F16 Clockwise SLUMP TESTS - ASTM C143 AIR CONTENT TESTS - ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content (%) 13:30 21 2" 13:30 21 4.7% AMBIENT TEMPERATURE CONCRETE TEMPERATURE - ASTM C1064 Time Temperature Time Truck No. Temperature 13:30 50°F 13:30 21 70°F Weather: Sunny Temp: 50's • DEC - I am Respectfully submitted, ALLIED TESTING L RATORIES, INC. By: Chester V. Dawicki Director of Testing Services MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. 4L-7401-.' ALLIED TESTING LABORATORIES, INC. 115 St.George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Fax: (413) 736-1838 Report No. 2 of Soils Tests Date: 11/20/03 Client: Delphi Construction, Inc. Project: ROCK RIDGE AT NORTHAMPTON, MA ASSISTED LIVING FACILITY Subject: Soils Tests Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (7) (pcf) (7.) 1 Footing T22 103.7 5.3 103.4 100.3 2 Footing J23 100.4 5.4 103.4 97.1 3 Footing G22 105.5 10.4 103.4 102.0 4 Footing F10 104.2 16.7 103.4 100.8 5 Footing H10 97.8 5.5 103.4 94.6 6 Footing J17 102.3 15.0 103.4 99.0 7 Footing 018 124.7 10.1 122.0 102.2 8 RETEST OF TEST #5 100.3 6.4 103.4 97.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester V. Dawicki Director of Testing Services NOV 2 1 2003 MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Fax: (413) 736-1838 Report No. 2 of Soils Tests Date: 11/20/03 Client: Delphi Construction, Inc. Project: ROCK RIDGE AT NORTHAMPTON, MA ASSISTED LIVING FACILITY Subject: Soils Tests Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard TEST: DENSITY OF SOIL IN PLACE BY NUCLEAR METHOD - ASTM D2922 TEST DRY MOISTURE MAXIMUM NO. LOCATION DENSITY CONTENT DENSITY COMPACTION (pcf) (%) (pcf) (%) 1 Footing T22 103. 7 5.3 103.4 100.3 2 Footing J23 100.4 5.4 103.4 97.1 3 Footing G22 105.5 10.4 103.4 102.0 4 Footing F10 104.2 16.7 103.4 100.8 5 Footing H10 97.8 5.5 103.4 94.6 6 Footing J17 102.3 15.0 103.4 99.0 7 Footing 018 124.7 10.1 122.0 102.2 8 RETEST OF TEST #5 100.3 6.4 103.4 97.0 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. elijt, ,6:144i6!.4- By: Chester V. Dawicki Director of Testing Services NOV 2 1 2003 MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (413) 736-1846 Fax: (413) 736-1838 Report No. 1 of Soils Tests Date: 11/18/03 Client: Delphi Construction, Inc. Project: ROCK RIDGE AT NORTHAMPTON, MA ASSISTED LIVING FACILITY Subject: Soils Tests Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard Herewith is submitted, the results of tests conducted on material proposed for use at the above noted project. Samples picke dup on site by Allied personnel on 11/17/03 at client's request. TEST: MOISTURE/DENSITY RELATIONSHIP OF SOILS TEST - ASTM D1557 Lab. No. 5931 5932 5933 Identificaiton: Sand Top Clay Middle Sand bottom Maximum Dry Unit Weight: (pcf) 124.6 122.0 103.4 Optimum Water Content: (%) 10.0 11.4 3.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. a4;;L. 1/ 41MAJ`' By: Chester V. Dawicki Director of Testing Services NOV 1 9 2003 MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St. George Road • Springfield, Massachusetts 01 104 Phone: (4 13) 736-1846 Fax: (413) 736-1838 Report No. 1 of Soils Tests Date: 11/18/03 Client: Delphi Construction, Inc. Project: ROCK RIDGE AT NORTHAMPTON, MA ASSISTED LIVING FACILITY Subject: Soils Tests Reported to: Delphi Construction, Inc. - Att: Mr. Paul Leonard Herewith is submitted, the results of tests conducted on material proposed for use at the above noted project. Samples picke dup on site by Allied personnel on 11/17/03 at client's request. TEST: MOISTURE/DENSITY RELATIONSHIP OF SOILS TEST - ASTM D1557 Lab. No. 5931 5932 5933 Identificaiton: Sand Top Clay Middle Sand bottom Maximum Dry Unit Weight: (pcf) 124.6 122.0 103.4 Optimum Water Content: (%) 10.0 11.4 3.8 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. aLLi' <steL. By: Chester V. Dawicki Director of Testing Services NOV 1 9 2003 MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.