Loading...
42-031 Woodland Drive LC 111- SITE PLAN_2021-06-24306 3 0 6 306 305 305 306 306 306307 306 306 305305306 306 30630 6 306307 304 30 7 30 6 306WWWWWWV WV 11'18'4' 10' MIN. 11'20'4' 10' MIN. WV WWW24'WD Shed Woodland Drive Public Right Of Way - 60' Wide Westhampton Road ~ Route 66Public Right Of Way - Variable WidthChecked By: Drawn By: Revisions Scale: Date:Sheet Number This drawing is not intended nor shall it be used for construction purposes unless the signed professional seal of a registered landscape architect, civil engineer or land surveyor employed by The Berkshire Design Group, Inc. is affixed above. Do not scale drawing for quantity take-offs or construction. Use written dimensions only. If dimensions are incomplete, contact The Berkshire Design Group Inc. for clarification. Copyright The Berkshire Design Group, Inc. This drawing and all of its contents are the express property of The Berkshire Design Group, Inc., and shall not be copied or used in any way without the written consent of The Berkshire Design Group, Inc. c F:\NORTHAMPTON - WOODLAND DRIVE\02-DESIGN PROCESS\01-DRAWINGS\LC 111- SITE LAYOUT PLAN.DWG PLOT DATE: 6/24/2021Woodland Dr. Northampton, MA Web: http://www.berkshiredesign.com Email: bdg@berkshiredesign.com (413) 582-7000 4 Allen Place, Northampton, Massachusetts 01060 FAX (413) 582-7005 Landscape Architecture Civil Engineering Planning Berkshire Group Design Land Surveying June 24, 2021 WDS JDS SITE PLAN LC 111 ZONING TABLE: WATER SUPPLY PROTECTION DISTRICT LOT SIZE FRONTAGE DEPTH FRONT SETBACK SIDE SETBACK REAR SETBACK MAX BUILDING HEIGHT BUILDING SF % OPEN SPACE # PARKING SPACES MIN: 80,000 SF MIN: 175 LF MIN:200 LF MIN: 20 LF MIN: 15 LF MIN: 20 LF MAX: 35 FT -- MIN: 85% 2 SPACES/UNIT 1"=30'-0" 0 603015 90 SCALE 1" = 30'-0" IF PRINTED ON 24" x 36" PAPER. EXISTING LAMP POST TO REMAIN LIMIT OF WORK AREA 10,500 S.F. SEPTIC TANK APPROXIMATE LOCATION SEPTIC LEACH FIELD APPROXIMATE LOCATION CONCRETE WALKWAY CONCRETE ENTRANCE PAD ASPHALT DRIVEWAY CONCRETE WALKWAY CONCRETE ENTRANCE PAD LIMIT OF WORK AREA 14,575 S.F. SEPTIC TANK APPROXIMATE LOCATION SEPTIC LEACH FIELD APPROXIMATE LOCATION 20' REAR SETBACK15' SIDE SETBACK15' SIDE SETBACK15' SIDE SETBACK15' SIDE SETBACK20' FRONT SETBACK 20' REAR SETBACK PROPERTY LINE APPROXIMATE LOCATION NEW 3 4" WATER SERVICE TAP COORDINATE WITH DPW FFE: 307.0' FFE: 307.0' EROSION CONTROL NOTES 1. Erosion control measures shall be incorporated in the sequence of construction to prevent sediment-laden runoff from leaving the site, and shall, where applicable, consist of at least the following procedures: a.A siltation fence along downslope site boundaries prior to commencing any other work. Fence material shall be Mirafi 140N, Trevira 1127, or approved equal. b. Temporary barrier of haybales around catch basins and drain inlets to prevent sediment-laden runoff from entering drainage system. c.New or regraded slopes of 3:1 or greater shall receive spread straw and/or seed and fertilizer as per plans. New or regraded slopes of 2:1 or greater shall be blanketed with Curlex erosion control matting, or approved equal; provide temporary slope erosion control where required. d.Fill and grading shall be treated with slope stabilization seeding or ground cover and straw mulch upon completion. 2. All haybale and silt fence erosion and sedimentation checks shall be placed prior to beginning work as per the plan and as per the appropriate detail specification. 3.Wherever haybale or silt fence filters are used, they shall be maintained in good working condition until ground cover is reestablished. Silt fence shall be periodically cleaned as necessary to assure proper and effective functioning. Haybales shall also be replaced as necessary, to provide adequate function. 4. Natural vegetation shall be retained wherever feasible up to the scheduled start of construction activity in the area. Where possible, clearing shall immediately precede construction activity. 5.No erosion of any bank edge shall be allowed under any circumstances. 6. Soil stockpiles shall be shaped and seeded with temporary cover as per seeding specifications or mulched if grading is to be delayed over winter. The downhill toe-of-slope of all stockpiled soils shall be protected by staked haybales or silt fence. 7.If any questions arise regarding erosion and sedimentation control measures, the Project Landscape Architect shall be consulted immediately. 1. Existing conditions and topography taken from a partial field survey by Berkshire Design Group, Northampton, MA. 2.Project benchmarks are indicated on the plan sheets. 3. The Contractor shall be responsible for a thorough site examination to determine the extent of demolition necessary to prepare the site for construction and shall verify all items to be demolished or salvaged with the Landscape Architect prior to beginning work. 4. Care shall be taken not to damage any items designated to remain; repair or replacement of damaged items designated to remain shall be at the Contractors' expense. 5. Disposal of property designated to be removed shall be at the direction of the Landscape Architect or Owner, and shall conform to all applicable laws and regulations. All salvagable material shall be delivered by the Contractor to storage areas designated by the Landscape Architect. Contractor shall remove all existing unsuitable materials from the site. 6. The Contractor shall protect existing trees to remain with 2"x 4"x 6'-0" stakes and snow fencing. Prior to removing trees, Contractor to notify Landscape Architect within 14 days for review of all trees to remain and be removed. 7. All topsoil shall be stripped from grass areas to be removed and stockpiled in an area designated by the Owner. 8. The Contractor shall use temporary fencing to control the site during construction. Prior to the finalization of the project, the Contractor shall remove all temporary fencing and barricades. 9. The locations of existing underground utilities are shown in an approximate way only based on available data and all utilities may not be shown. Prior to construction, the contractor shall contact Dig Safe at 1-800-322-4844 to request utilities to be marked on the ground. The contractor shall be responsible for determining the exact location of all existing utilities before commencing work. The contractor agrees to be fully responsible for any and all damages which might be occasioned by his/her failure to exactly locate and preserve any and all utilities. 10. All boundary monuments shall be protected and/or preserved during demolition and construction. Should any boundary monument be destroyed and/or altered as a result of demolition and construction, it shall be the responsibility of the party incurring the damage to obtain the services of a professional land surveyor to replace and reset said monument. 11. Refer to structural and geotech drawings for excavation and fill requirements under foundations. 12.The plan shows aggressive measures to preserve significant trees. If any of the trees do not survive the construction process or need to be removed for net zero solar, then per §350-6.12(B)(3) no tree replacement is proposed as no location is feasible that does not block rooftop solar photovoltaic cells. EXISTING CONDITIONS/ DEMOLITION NOTES WATER VALVE (TYP.) LOCUS MAP WHEN AT LEAST 50% OF UNITS ARE AFFORDABLE UNDER SECTION 350-6.12 Not applicable per lot (Average of 32,000 SF for the project) 70 FT 80 FT 20 FT 15 FT 20 FT 35 FT -- 32,005 SF 230.93' 135.29' 47' 73' 55' 26.3' -- 94% 45,386 SF 319.53' 138.24' 34' 79' 46' 26.3' -- 95% LOT 1 LOT 2 PROPOSED PER WSP ZONING PROPOSED EASEMENTEXISTING ASPHALT SIDEWALK TO REMAIN ASPHALT DRIVEWAY EXISTING LAMP POST TO REMAIN EXISTING SIGNIFICANT TREE (1)TO BE REMOVED APPROXIMATE LOCATION PER §350-6.12(B)(3) NO TREE REPLACEMENT IS PROPOSED AS NO LOCATION IS FEASIBLE THAT DOES NOT BLOCK SOLAR PV ARRAY 5' MIN. COVER TO RESIDENCE SYSTEM/METER VALVE BOX NORTHAMPTON STD. 3/4" CURB STOP NORTHAMPTON STD. 3/4" TYPE K COPPER WATER SERVICE 3/4" CORPORATION STOP EX. WATER MAIN FINISH GRADE STREET FINISH GRADE STREET SEE PAVEMENT SECTION FLOW FILL, PER EXCAVATABLE NORTHAMPTON STD. SAND BEDDING WATER SERVICE TRENCH SECTION 3" 3/4" HDPE NORTHAMPTON STD. SCALE: WATER SERVICE CONNECTION01NOT TO SCALE SCALE: BITUMINOUS DRIVEWAY PAVEMENT02NOT TO SCALE APPROXIMATE LOCATION NEW 3 4" WATER SERVICE TAP COORDINATE WITH DPW WATER VALVE (TYP.) EXISTING SIGNIFICANT TREES (3) TO REMAIN PROVIDE TREE PROTECTION DURING CONSTRUCTION EXISTING SIGNIFICANT TREES (3) TO REMAIN PROVIDE TREE PROTECTION DURING CONSTRUCTION 3/4" WATER SERVICE LINE 3/4" WATER SERVICE LINE EXISTING SIGNIFICANT TREES (2) TO REMAIN PROVIDE TREE PROTECTION DURING CONSTRUCTION EXISTING SIGNIFICANT TREE (1) TO REMAIN PROVIDE TREE PROTECTION DURING CONSTRUCTION EXISTING SIGNIFICANT TREE (1) TO REMAIN PROVIDE TREE PROTECTION DURING CONSTRUCTION HOUSE FOORPRINT ENVELOPE APPROXIMATE LOCATION 20' FRONT SETBACK PROPERTY LINE HOUSE FOORPRINT ENVELOPE APPROXIMATE LOCATION 12" (IF NOT CURBED) 1-1/2" MassDOT HMA TOP COURSE 2-1/2" MassDOT HMA BINDER COURSE 12" COMPACTED GRAVEL BASE (95% MIN DENSITY) 4" PROCESSED GRAVEL OVER 8" TYPE B GRAVEL BORROW NOTE: IF UNSUITABLE CONDITIONS ARE ENCOUNTERED, DEPTH OF BASE MATERIAL MAY BE INCREASED IN THE FIELD. UNDISTURBED OR COMPACTED SUBGRADE SYNTHETIC FILTER FABRIC IN VEHICULAR AREAS TO BE MIRAFI 500X ALL PRUNING BY QUALIFIED ARBORIST TO ANSI A300. INSTALL FENCING AT THE TREE DRIP LINE PRIOR TO SITE WORK AND REMOVE ON COMPLETION. FOR NEW UTILITIES: TRENCHING BY HIGH-PRESSURE WATER ON ONE SIDE OF TREE ONLY. ROOTS REMAIN INTACT. 3'-7 3/4" 1'-5 1/2" MIN.2 3/16" DRIPLINE FOR NEW UTILITIES: NO TRENCHING ZONE - BORING & DRILLING ONLY. NOTE: VERIFY STATUS OF ALL TREES WITH LANDSCAPE ARCHITECT PRE-CONSTRUCTION. LOCATE FENCE TO GROUP TREES AS DIRECTED BY LANDSCAPE ARCHITECT TIE ORANGE PLASTIC TAPE FROM LOWEST OVERHANGING BRANCHES PROTECT ROOT SYSTEM FROM DAMAGE, COMPACTION, CONTAMINATION, FILL & EXCAVATION NOTE: IF PAVEMENT OR FOUNDATION EXIST, FENCE MAY BE LOCATED INSIDE DRIP LINE AT EDGE OF PAVEMENT. HEIGHT OF TREE SECTION ORGANIC MULCH WATER TREE INSIDE FENCE FOR NEW UTILITIES:TRENCHING BY MACHINE AND HAND-DIGGING AT LEAST 6" WIDE TO CLEANLY TRIM ROOTS. MAX. TWO SIDES OF THE TREE. SCALE: TREE PROTECTION03NOT TO SCALE PROPOSED 35" 25" 28" 35" 24" 26" 27" 24" 25" 20" 29"28" 21" LOAM & SEED LOAM & SEEDLOAM & SEED CODE PS QA QR QUANTITY 11 1 1 SIGNIFICANT TREES: TREES > 20" DBH 350-6.12(B)(3) When significant trees on the property are cut they shall be replaced on-site with new trees to the extent feasible without blocking solar photovoltaic or hot water systems, but no payment in-lieu is required when such planting is not feasible. Full mitigation is required for cutting public shade trees. SPECIES PINUS STROBUS QUERCUS ALBA QUERCUS RUBRA COMMON NAME WHITE PINE WHITE OAK RED OAK DBH RANGE 20"-35" 35" 21" STATUS ALL PRESERVED PRESERVED REMOVED, NOT REPLACED, PER 350-6.12(B)(3) QA QR PS PS PS PSPS PS PS PS PS PS PS SEE ANR PLANSPROPOSED PROPERTY LINESEE ANR PLANSSEE ANR PLANSPROPOSED PROPERTY LINESEE ANR PLANSPROPOSED PROPERTY LINESCALE: DRY WELL04NOT TO SCALE 4" PVC INLET W/ 1% MIN. SLOPE.8" MIN.3'-2" MIN.6" MIN.1" DIA. PERCOLATION HOLE KNOCK OUTS. SCORE AND KNOCK OUT ALL HOLES BEFORE WRAPPING THE FLOW WELL WITH LANDSCAPE FABRIC. FINISHED GRADE FWSD69 4" SCH. 40 SURFACE DRAIN INLET WITH GRATE FWAS24C 24" DIA. FLOW WELL COVER. FWBP24 24" DIA. FLOW WELL BOTTOM. FWSPS3 (3) FLOW WELL SIDE PANELS. 1'-0" MIN. 3 4" TO 1 1 2" CLEAN GRAVEL BACKFILL RECOMMENDED. NOTE: ·MUST BE INSTALLED 10' AWAY FROM STRUCTURE OR FOUNDATION. FWFF67 POROUS FILTER FABRIC WRAP. 4" DIA. DRAINAGE CONNECTION HOLES. UTILIZE HOLES AS NEEDED FOR INLETS AND OUTLETS. DRY WELL FROM ROOF DRAINAGE 400 SQ FT (1 2 ROOF AREA) DRY WELL FROM ROOF DRAINAGE 400 SQ FT (1 2 ROOF AREA)