Easthampton Road stormwater excerpt.pdfPlatinum Self Storage Stormwater Drainage Report
Easthampton Road Northampton, Massachusetts
R Levesque Associates, Inc. Page 1-1
1. INTRODUCTION
The applicant, Platinum Self Storage, is proposing to construct a self-storage facility located on a
currently vacant parcel identified as lot 15-32-E in East Longmeadow, Massachusetts. Currently,
there are no stormwater best management practices located on the project site. Generally,
stormwater runoff from the property is tributary toward existing wetland areas north of the site and
low points located off the property to the east.
The proposed project involves the following:
1. Construction of 2 buildings to house storage units;
2. Construction of associated site improvements including an office building and access drives;
3. Installation of underground utilities to the office building including, water service, sanitary
sewer, electric and communication services;
4. Construction of a stormwater management system including deep-sump hooded catch
basins, underground infrastructure, proprietary sedimentation devices, bioretention areas
and extended dry detention basins with sediment forebays.
This report has been prepared to document the compliance of the proposed stormwater
management system. The stormwater system has been designed to meet the standards set forth in
the City of Northampton Stormwater Management Ordinance as well as the Massachusetts
Department of Environmental Protection Stormwater Management Handbook.
Platinum Self Storage Stormwater Drainage Report
Easthampton Road Northampton, Massachusetts
R Levesque Associates, Inc. Page 3-1
3. STORMWATER MANAGEMENT SYSTEM
R. Levesque Associates, Inc. has prepared the following drainage system calculations for the
proposed project site. These calculations were performed to document compliance with the
guidelines set forth by Chapter 281 – Stormwater Management Ordinance of the Code of
Ordinances of the City of Northampton, Massachusetts as well as the Massachusetts Department of
Environmental Protection Stormwater Management Handbook (MassDEP Handbook). A detailed
hydrologic analysis of the system was completed in order to evaluate the performance of the
stormwater management system components, see Appendix C – Pre- and Post-Development
Hydrologic Analysis. The proposed stormwater management system will collect runoff from on-site
impervious areas and utilize stormwater best management practices to provide water quality
treatment, groundwater recharge, and peak discharge rate attenuation.
3.1 Drainage Calculations
R. Levesque Associates, Inc. utilized the HydroCAD software program, Version 10.0, developed by
HydroCAD Software Solutions LLC, in order to create and analyze the site hydrology. The
HydroCAD software is based upon the Soil Conservation Service (SCS) “Technical Release 20 –
Urban Hydrology for Small Watersheds” and “Technical Release 55 – Urban Hydrology for small
Watersheds” which are generally accepted industry standard methodologies. The analysis was
conducted in order to establish the peak discharge rates and estimated run-off volume from the
project site. This was accomplished to properly evaluate pre- and post-development conditions
during various storm events. Contributing drainage areas were identified and soils, surface cover,
watershed slope, and flow paths were evaluated to develop the necessary HydroCAD model input
parameters.
Drainage calculations were performed for the Pre- and Post-Development conditions for the 24-
hour, 2, 10, and 100-year Type III storm events. The total rainfall for each of the storm events
was based upon data provided by the United States Department of Commerce Technical Paper
No. 40 – Rainfall Frequency Atlas of the United States. The total rainfall values used in the
hydrologic modeling for each event are shown in the following table:
Table 3.1: Design Rainfall Data
2-year, 24-hour storm 10-year, 24-hour storm 100-year, 24-hour storm
3.00 inches 4.50 inches 6.40 inches
Platinum Self Storage Stormwater Drainage Report
Easthampton Road Northampton, Massachusetts
R Levesque Associates, Inc. Page 3-2
3.1.1 Design Points
In order to compare the difference between pre- and post-development peak flows, existing and
proposed watersheds were delineated. Three subcatchments draining to two Design Points (DP)
were established with flow paths representing the longest time of concentration of run-off in each
tributary watershed. For this analysis, the design points were determined as follows:
DP-1: This design point represents runoff from the property which is tributary to the existing
drainage infrastructure in Easthampton Road;
DP-2: This design point represents the runoff from the property which is directed off-site
towards the westerly property line.
3.1.2 Pre-Development Hydrology
The project area under existing conditions was broken down into three (3) sub-catchments
discharging to the two design points as described above. The sub-catchments were delineated
based on the existing topography of the parcel and surrounding areas. The existing watershed
areas are shown on the attached Figure 4 entitled “Pre-Development Watershed Plan”. Peak
discharge rates for the design point are depicted in Table 3.1.4 below.
3.1.3 Post-Development Hydrology
The project area under proposed conditions was broken down into seven (7) sub-catchments
discharging to the same design points as the existing conditions. The proposed watershed areas
are shown on the attached Figure 5 entitled “Post-Development Watershed Plan”. Peak
discharge rates for the design point are depicted in Table 3.1.4 below.
Platinum Self Storage Stormwater Drainage Report
Easthampton Road Northampton, Massachusetts
R Levesque Associates, Inc. Page 3-3
3.1.4 Peak Discharge Rates
The table below summarizes the Pre and Post-Development peak discharge rates for each Design
Point:
Table 3.1.4 Pre- and Post-Development Peak Discharge Rates
2-year storm (cfs) 10-year storm (cfs) 100-year storm (cfs)
Pre- Post- Pre- Post- Pre- Post-
Design Point 1 1.64 1.63 5.95 5.55 13.16 12.89
Design Point 2 1.06 0.52 2.78 2.22 5.34 4.72
As depicted in the table, the post-development peak discharge rates do not increase over pre-
development peak discharge rates for each of the storm events presented. This is accomplished
by providing onsite attenuation with the proposed bioretention areas and detention basins.
3.2 Hydraulic Analysis
R. Levesque Associates, Inc. utilized the Hydraflow Storm Sewer Extension for AutoCAD Civil 3D
2012 software program, Version 9, developed by Autodesk, Inc., in order to analyze the hydraulic
capacity of the proposed underground infrastructure. The analysis was conducted in order to
verify that the proposed conveyance piping has sufficient capacity to convey up to and including
the 24-hour, 100-year storm event. The data from the analysis was used to properly size the
conveyance piping such that there is no or minimal surcharge of stormwater above the rim
elevations within the paved areas. As part of the input parameters required for the hydraulic
analysis, the tributary inlet areas were delineated based on topography, any additional connected
discharges, characteristic land use coverages and flow paths, see Figure 6 – Inlet Area Plan. A
minimum Time of Concentration (Tc) of (6) minutes was used in the calculations. Please refer to
Appendix D for the hydraulic analysis of the proposed stormwater management system.
3.3 MassDEP Stormwater Management Standards
R. Levesque Associates, Inc. has designed the proposed stormwater management system to be in
compliance with the MassDEP Stormwater Management Standards. Chapter 1, Volume 3 of the
MassDEP Handbook outlines specific calculations, and other information, that must be submitted
with each report to document compliance. The following summary highlights elements of the
proposed project and how they apply to each standard.