Loading...
36 Hampden Street stormwater excerpt.pdf 9-14-2020 Northampton, MA 32 Perkins Ave Pioneer Development, LLC Prepeared For: Northampton, MA 36 Hampden Ave Location: Stormwater Report Notice Of Intent 413-626-8167 Chesterfield, MA 01012 PO Box 262 The Engineer Group, LLC The Engineer Group LLC 413-626-8167 36 Hampden St Northampton, MA MA Notice Of Intent Storm Water Report Massachusetts Department of Environmental Protection (DEP) - Stormwater Management Standards As demonstrated below, the proposed Project complies with the DEP Stormwater Management Standards. Standard 1: No New Untreated Discharges or Erosion to Wetlands The Project has been designed to fully comply with Standard 1. The Best Management Practices (BMPs) included in the proposed stormwater management system have been designed in accordance with the Massachusetts Stormwater Handbook. Supporting information and computations demonstrating that no new untreated discharges will result from the Project are presented through compliance with Standards 4 through 6. Standard 2: Peak Rate Attenuation The project is a redevelopment, and it has been designed to comply with Standard 2 to account for the proposed increase in impervious area on the site. The rainfall-runoff response of the Site under existing and proposed conditions was evaluated for storm events with recurrence intervals of 2, 10, 25 and 100- years. Drainage areas used in the analyses are shown on page 4 of the drawings. The HydroCAD model is based on the NRCS Technical Release 20 (TR-20) Model for Project Formulation Hydrology. Printouts of the HydroCAD analyses are included in the Appendix. A table on Drawing 4 presents a summary of the existing and proposed conditions peak discharge rates. The results of the analysis indicate that there is no increase in peak discharge rates between the pre- and post-development for the 2yr, and 10 yr storms. Standard 3: Stormwater Recharge The project is a redevelopment, and has not been designed to comply with 9-14-2020 Page 8 of 10 The Engineer Group LLC 413-626-8167 36 Hampden St Northampton, MA MA Notice Of Intent Storm Water Report APPENDIX A Standard 2 Peak Rate Calculations HydroCAD 5-30-2020