Loading...
521 herold framing and foundation:: PROJECT TITLE ::01HEROLD/DUNAWAY RESIDENCE ADDITION 3 MASSASOIT AVENUE, NORTHAMPTON, MA 01060FOUNDATION AND FRAMING PLANSDRAWN BY TS5/21/2021STOKES AND COMPANY: 20 TURKEY HILL ROAD, WESTHAMPTON, MA 01027 413-695-226414" TJI AT 16' O.C 2 X 8 KD AT 16" O.C 2X10 PT AT 16" O.C CONTINUOUS MID-SPAN BLOCKING A A 14" TJI AT 16' O.C 2 X 8 KD AT 16" O.C (3) LVL GIRDER (3) LVL GIRDER(2) 2X10 OPEN FOR BSMT STAIR EXISTING HOUSE EXISTING HOUSE 2 X 12 KD AT 16" O.C2 X 12 KD AT 16" O.C. (3) LVL RIDGE 14" TJI AT 24" O.C 2 X 8 KD AT 16" O.C PRE-CAST PIERS FOR DECK SUPPORT FOUNDATION PLAN NTS POURED IN PLACE FOUNDATION WALLS AND FOOTINGS FIRST FLOOR FRAMING PLAN NTS SECOND FLOOR FRAMING PLAN NTS ROOF FRAMING PLAN NTS ROOF PLAN NTS SECTION A-A NTS 7'-8"10'-0"8'-6"FLOOR CONSTRUCTION 14" I-JOISTS AT 16" 0.C. 3/4" T&G ADVANTECH SUBFLOOR 3/4" HARDWOOD FLOORING 1/2" DRYWALL FINISH ON CEILING ROOF CONSTRUCTION EPDM MEMBRANE ROOFING 5/8" T&G ZIP PLY SHEATHING, TAPED AT JOINTS 14" I-JOISTS AT 16" O.C., CONTINUOUS BLOCKING AT PERIMETER 1'-6" 1'-6" WALL CONSTRUCTION 1/2" DRYWALL FINISH 2X6 STUDWALL DENSE-PACK CELLULOSE INSULATION 2" R-WALL, R-10 SHEATHING DRAINAGE PLANE MATERIAL 3/4" FURRING FOR AIR GAP 3/4" T&G SIDING, SEALED BOTH SIDES 8" FOUNDATION WALL 2", R-10 CONTINUOUS INSULATION BOARD 8", 3000 PSI CONCRETE STEM WALL AND FOOTING 1/2 VERTICAL AND HORIZONTAL REBAR AT 48" O.C. 1'-8"10"4"4" REINFORCED SLAB OVER COMPACTED FILL PERIMETER DRAINAGE WHERE REQUIRED