Loading...
Levee Certification Task 4.4 Letter Report-6.30.20June 30, 2020 File No. 01.0174343.00 Mr. David Veleta, P.E. – City Engineer City of Northampton D.P.W. 125 Locus Street Northampton, MA 01060 Re: Task 4.4 Interior Flooding Evaluation – Review Existing Information Mill River and Connecticut River Systems Northampton, Massachusetts Dear David: In accordance with Task 4.4 of GZA’s proposal to the City dated July 19, 2019, the purpose of this letter report is to present GZA’s review of the prior interior runoff evaluation for the Hockanum Flood Control Pumping Station completed for the City by Tighe & Bond in 2019 and to present GZA’s evaluation of the suitability and completeness of that evaluation relative to requirements of 44 CFR Section 65.10. In addition, this letter report presents GZA’s recommended scope of work for supplementary hydrologic and hydraulic analyses to evaluate the potential for interior flooding during the base flood. The federal regulations pertaining to mapping of areas protected by levee systems indicate that “An analysis must be submitted that identifies the source(s) of such flooding, the extent of the flooded area, and, if the average depth is greater than one foot, the water-surface elevation(s) of the base flood. This analysis must be based on the joint probability of interior and exterior flooding and the capacity of facilities (such as drainage lines and pumps) for evacuating interior floodwaters” (44 CFR 65.10(b)(6)). The U.S. Army Corps of Engineers’ Engineer Manual, “Hydrologic Analysis of Interior Areas” (EM 1110-2-1413)1 provides guidance for a “Coincident Frequency Method” of analysis which computes the percent chance exceedance frequencies of various interior flooding elevations based on the probabilities of exceeding given exterior river stages during different interior storm events. Coincidence is the degree to which the interior and exterior events occur at the same time. The Coincident Frequency analysis provides a method to compute the joint probability of interior and exterior flooding and to determine the base flood (1%) elevation for interior areas. For riverine levee systems, the interior analysis considers interior rainfall events during both low river stages (gravity conditions) and high river stages when the gravity outlets are closed (blocked conditions) and the performance of pumping stations. 1 U.S. Army Corps of Engineers (24 August 2018). “Hydrologic Analysis of Interior Areas”, Engineer Manual EM 1110-2-1413. DRAFT June 30, 2020 File No. 01.0174343.00 Interior Flooding Evaluation – Review Existing Information Page | 2 Proactive by Design The Coincident Frequency Method requires the following components: An evaluation of the frequency distribution of river stage elevations on the exterior of the flood control system (i.e., river stage – frequency curves for the Connecticut and Mill Rivers); An analysis of the runoff delivered to each pumping station from the interior drainage area, for multiple return frequency storm events (e.g., 2-, 5-, 10-, 25-, 50-, 100-, and 500-year storms) based on the selected hydrologic data and precipitation frequency estimates (e.g., NOAA Atlas 14); Pump-head discharge curves and understanding of pumping station hydraulics (pipe sizes, elevations, storage chambers, wet well, gates, etc.); and An understanding of the storage available at each pumping station (stage-storage relationship). The “Facility Evaluation Report” for the Hockanum Flood Control Pumping Station, prepared for the City of Northampton by Tighe & Bond (August 2019) presents a hydrology and hydraulics (H&H) evaluation which included review of the Corps of Engineers’ 19402 design assumptions regarding design flows and the contributing watershed and review of the Corps of Engineers’ 1983 report prepared for the Hockanum Flood Control Pumping Station, Hydrological Review and Analysis of Interior Drainage Facilities. The H&H evaluation included development of a HEC-HMS model used to predict the surface runoff and anticipated flow volume (interior drainage flow rate) to the pumping station for the 10-year return frequency storm event, based on rainfall data from the NOAA Atlas 14 – point precipitation frequency tool. The H&H evaluation included development of stage-storage curves using MassGIS LiDAR data for three separate storage areas within the Old Mill River, as follows: (1) upstream of the Pleasant Street culvert, (2) upstream of the WWTP driveway culvert, and (3) upstream of the flood pumping station. The model was calibrated using continuous flow monitoring data. The 10-year frequency, 24-hour peak flow predicted by the model was 350 cfs. Both the identified pumping station drainage area and design flow predicted by this H&H evaluation were greater than values indicated by the two previous Corps of Engineers reports. The H&H evaluation as described in the Facility Evaluation Report prepared by Tighe & Bond does not satisfy the requirements of 44 CFR Section 65.10, because it does not include a full Coincident Frequency analysis that considers the exterior flooding of the Connecticut River against the capacity of the pumping station. However, based on GZA’s review of the H&H evaluation, it is GZA’s opinion that the model developed by Tighe & Bond, with modification, can be used to estimate interior runoff delivered to the pumping station for return frequency storm events other than the 10-year event. The model can be expanded to simulate pumping through the pumping station against various Connecticut River stage elevations. The results of these simulations can then be used to perform the Coincident Frequency analysis in accordance with EM 1110-2-1413. The Facility Evaluation Report also includes a summary of the components of the pumping station, with a general description of the pumping station operation. The report included a recommendation to replace 2 U.S. Army Corps of Engineers (1940). “Analysis of Design Northampton Pumping Station Item N.4 – Contract”. DRAFT June 30, 2020 File No. 01.0174343.00 Interior Flooding Evaluation – Review Existing Information Page | 3 Proactive by Design the existing axial lift pumps and diesel engines in kind, with newer high-efficiency axial lift pumps equipped with newer diesel-engine technology. The report indicated that the specific sizing of the replacement pumps would need to be developed during final design and based on actual system curve calculations. It is GZA’s understanding that the engineering design to implement the recommendations for pumping station improvements is currently underway. GZA recommends the following scope of work for supplementary hydrologic and hydraulic (H&H) analyses to evaluate the potential for interior flooding during the base flood for the Hockanum Flood Control Pumping Station: 1.Review Tighe & Bond’s HEC-HMS model files to verify input data, calibration, and results. 2.Using USGS or other verified Connecticut River gage data, develop frequency distribution of river stage elevations for the Connecticut River. 3.Expand the HEC-HMS model to update or refine input data as needed, to estimate interior runoff delivered to the pumping station for return frequency storm events other than the 10-year event (i.e., 2-, 5-, 25-, 50-, 100-, and 500-year storms); and to simulate pumping through the pumping station against various Connecticut River stage elevations. 4.Perform Coincident Frequency Analysis to identify the 1% annual chance interior flood elevation based on the joint probability of interior and exterior flooding. 5.Prepare mapping of the 1% annual chance interior flood limits and identify average flood depth. The supplementary H&H analyses will require pump-head discharge curves for the pumps in the Hockanum Flood Control Pumping Station. Given that the City is underway with the design of replacement pumps for the pumping station, GZA recommends that the supplementary H&H analyses incorporate the pump-head discharge curves for the new pumps, provided that they are available at the time of analysis. The alternative is to use the pump-head discharge curves for the existing pumps, which are available as Plate No. 14 in the Analysis of Design document for the Northampton Pumping Station, Item N.4 – Contract, Connecticut River Flood Control Project, Northampton, Mass., prepared by U.S. Army Corps of Engineers, January 1940. Typically, GZA would recommend the field-verification of design pumping capacities, but we do not feel this is advised because the pumps are going to be replaced, likely before System certification is necessary. GZA requests the following information and files from the City to complete the proposed scope of work for the supplementary H&H analyses to evaluate the potential for interior flooding during the base flood for the Hockanum Flood Control Pumping Station: Tighe & Bond’s HEC-HMS model files. Pump-head discharge curves for the proposed replacement pumps under design for the Hockanum Flood Control Pumping Station. GZA notes that if the pump-head discharge curves for the proposed replacement pumps under design are used, our moving forward now with the Coincident Frequency Analysis using those assumed values would DRAFT June 30, 2020 File No. 01.0174343.00 Interior Flooding Evaluation – Review Existing Information Page | 4 Proactive by Design be an excellent verification that the intended pumps—once installed--will be sufficient in capacity to satisfy the requirements of 44 CFR Section 65.10. GZA’s Contract No. WF7-19-2019 for Levee Certification Support was recently amended to include further evaluation of the City’s Flood Control Pumping Stations. Accordingly, GZA has also preliminarily reviewed the existing information available to us regarding the Mill River Pumping System. We have examined and initially assessed the following information: AECOM, City of Northampton, Massachusetts Levee Assessment and Flood Control Alteration Plans for the Connecticut River Flood Control System, Mill River Levee, Drawing M-1, 12/15/15. AECOM, Memorandum to James R. Laurila, P.E., “Engineering Assessment of Connecticut River and Mill River Flood Control Levees, West Street Pump Station Risk Analysis Technical Memorandum (Task 2)”, January 11, 2016. AECOM, Mill River Levee and Flood Control System Assessment Summary Report, May 19, 2016. CDM, Stormwater and Flood Control System Assessment and Utility Plan, Northampton, Massachusetts Department of Public Works, May 2012. City of Northampton, Massachusetts, Department of Public Works, Mill River Left Bank, Mill River Diversion Status Report, August 1, 2016. City of Northampton Emergency Management Department, Local Emergency Flood Plan, March 10, 2006. GZA & Watermark, Pre-Inspection Packet – Mill River Left Bank, Mill River Diversion, Smith College, Northampton, Massachusetts, December 2010. New England Corps of Engineers, Northampton Local Protection Project Connecticut and Mill Rivers Northampton, Massachusetts, Hydrologic Review and Analysis of Interior Drainage Facilities, September 1983. Northeast Survey Consultants, Survey: Preliminary Existing Conditions Plan of Land in Northampton, MA, Hampshire Registry, prepared for the City of Northampton, Sheets 1 to 9 of 9, 07-09-15. Tighe & Bond, Massachusetts Levee Toe Drain Repairs and Improvements Updated 90% Design Plans, February 2020. U.S. Army Corps of Engineers, Record Drawings, Connecticut River Flood Control, Northampton Dike, Diversion Canal – Fiscal Year 1939 Unit, Drawings N.3a - 1 to 10 of 10, March 1939. U.S. Army Corps of Engineers, Record Drawings, Connecticut River Flood Control, Northampton Dike, Diversion Canal – Fiscal Year 1939 Unit, Drawings N.3b - 1 to 44 of 44, March 1939. U.S. Army Corps of Engineers, Appraisal Report, Northampton, Massachusetts, Connecticut River, Local Flood Protection, October 1985. Draft Mill River Flood Control System West Street Pump Station O&M Procedures manual Based on our review to date, we have identified the following data gaps / data needs: The City’s most recent detailed mapping of the storm drainage system that discharges to the West Street Pumping Station, preferably in GIS format. DRAFT June 30, 2020 File No. 01.0174343.00 Interior Flooding Evaluation – Review Existing Information Page | 5 Proactive by Design Elevational information for the West Street Pumping Station (pump intake and discharge line elevations). The completion of the following recommendations would provide the necessary data and information to enable a full Coincident Frequency analysis of the Mill River (West Street) Pumping Station: Field-verification of pumping capacities (pump tests), if feasible. Survey elevations for pumping station components (pump intake and discharge line elevations). If you have any questions or comments concerning the contents of this letter, please contact Rosalie Starvish at 860-550-2777 or rosalie.starvish@gza.com, or Tom Jenkins at 413-563-7986 or thomas.jenkins@gza.com. Sincerely, GZA GEOENVIRONMENTAL, INC. Rosalie T. Starvish, P.E. Thomas E. Jenkins, P.E. Project Engineer Associate Principal/Senior Engineer DRAFT