Loading...
18-035 66 EMILY LN BP-2021-1249 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 18-035 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2021-1249 Project# JS-2021-002075 Est.Cost: $47000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: INSIGHT VENTURES LLC DBA INSIGHT SOLAR114618 Lot Size(sq.ft.): 42383.88 Owner: VON ROSENBACH SHELBY Zoning: Applicant: INSIGHT VENTURES LLC DBA INSIGHT SOLAR AT: 66 EMILY LN Applicant Address: Phone: MS'trance: 89 MARKET ST (413) 338-7555 WC' NORTHAMPTONMA01060 ISSUED ON:4/28/2021 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 32 PANEL 10.88 KW ROOF MOUNTED SOLAR SYSTEM WITH INVERTER POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department _Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NOR HA TON 01WOLATION OF ANY OF ITS RULES AND REGULATIONS. I • V , . TAIT Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 4/28/20210:00:00 $75.00 212 Main Street, Phone(413)587-1240,Fax:(413)587-11272 Louis Hasbrouck—Building Commissioner ` '%���� gp9t The Commonwealth of Massachusetts 2 J W Board of Building Regulations and Stare mds <90 F R �J UNIPALITY Massachusetts State Building Code, 780 .„,,qt��o,,,N�, USE Building Permit Application To Construct, Repair, Renovate Re sed Mar 2011 Tio One-or Two-Family Dwelling ---:'-40' 10 o 4/S `, ✓� ,_ T Section For Official Use Only ''�• ,` Building Permit Number: J Date Applied: r jo i Falk) I 7 . Y • ii/(2.Y/ / Building Official(Print Name) Signature la Dale SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assess s Map& Parcel Numbers 66 Emily Lane 35" 1 Q 1.1a Is this an accepted street?yes X no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Lone: Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Shelby von Rosenbach Northampton,MA 01060 Name(Print) City,State,ZIP 66 Emily Lane 415-741-6884 shelbymarie(a7gmail.com No.and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition ❑ Demolition 0 Accessory Bldg. 0 Number of Units Other al Specify: Solar Brief Description of Proposed Work': Installation of 10.88 kW roof mounted solar system. 32 Hanwha 340 Q-cells modules and 1 SE7600 inverter. Will not exceed building footprint but will add 6"to roof height. SECTION 4:ESTIMATED CONSTRUCTION COSTS Estimated Costs: Item (Labor and Materials) Official Use Only 1. Building $ 15,510.00 1. Building Permit Fee: $ Indicate how fee is determined: 2.Electrical $ ❑Standard City/Town Application Fee 31,490.00 ❑Total Project Cost3(Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $ List: 5. Mechanical (Fire $ Suppression) Total All Fees Check No.( Check Amount: Cash Amount: 6.Total Project Cost: $ 47,000.00 0 Paid in Full 0 Outstanding Balance Due: City of Northampton ` '!1 Massachusetts "'�z i, yid .(//''' ! DEPARTMENT OF BUILDING INSPECTIONS .%,0. 2- 212 Main Street • Municipal Building Northampton, MA 01060 t ,,�,1 PROCEDURE FOR OBTAINING A BUILDING PERMIT FOR NEW 1 &2 FAMILY DWELLING,ADDITIONS, POOLS, DECKS,ACCESSORY STRUCTURES, FENCES,GROUND MOUNTED SOLAR, ETC. 1. Building Permit Application signed by legal owner and filled out by owner or authorized agent. 2. One set of plans and specification of proposed work(digital and hard copy). 3. Site Plan with location of proposed structure(s)and setbacks. 4. Construction Debris Affidavit filled out and signed by applicant. 5. Worker's Compensation Insurance Affidavit filled out and signed by applicant. 6. Contractors must supply a copy of CS License, HIC Registration and proof of Liability Insurance. 7. Energy Conservation Compliance Certificate(new/replacement windows). 8. Home Owner's License Exemption Form filled out and signed by homeowner(if applicable). 9. Note any Conservation and/or Special Permit requirements (if applicable). 10. Driveway Permit(if applicable). 11. Proof of Water and Sewer entry fees paid(if applicable). 12. Trench Permit-public land by DPW/Private land by Building Dept. 13. Stretch Energy Code—all new construction will require a HERS Rater Affidavit to be submitted with permit application before issuance of permit. SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS l 14618 10i'31/2023 Edmund P.Sepanski License Number Expiration Date Name of CSL Holder List CSL Type(see below) U PO Box 130 No.and Street Type Description U Unrestricted(Buildings up to 35,000 cu.ft.) Otis,MA 01253 R Restricted I&2 Family Dwelling City/Town,State,ZIP M Masonry _ RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 413-446-5112 Ed(a'getinsightsolar.com I Insulation Telephone Email address D Demolition _ 5.2 Registered Home Improvement Contractor(HIC) 192102 06/08/2022 Insight Ventures,LLC dba Insight Solar HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 59C North Street eric(agetinsightsolar.com No.and Street Email address Hatfield,MA 01038 413-338-7555 City/Town,State,ZIP Telephone SECTION 6:WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ® No . 0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Insight Solar to act on my behalf, in all matters relative to work authorized by this building permit application. Shelby von Rosenbach 4/27/21 Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Leah Visconti 4/27/21 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage,fmished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" City of Northampton oti i Massachusetts * t tiA DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street • Municipal Building � p„ a Northampton, MA 01060 r bg0t��' CONSTRUCTION DEBRIS AFFIDAVIT (FOR ALL DEMOLITION AND RENOVATION PROJECTS) In accordance of the provisions of MGL c 40, S54, a condition of Building Permit Number is that all debris resulting from this work shall be disposed of in a properly licensed waste disposal facility, as defined by MGL c 111, S 150A. The debris will be disposed of in: Location of Facility: 59C North Street. Hatfield. MA 01038 The debris will be transported by: Name of Hauler: Insight Solar Signature of Applicant: L i"4 Az& Date: 4/27/21