Loading...
37 Franklin St - Framing - Ceiling PlanPOINT LOAD FROM HIP RAFTER Sum vertical load capacitiesof Boise joist & rimboard for Backer Block Optional N/AN/AFINALDESCRIPTION:03/25/21N/AN/ADATE:ISSUE:N/AN/AFINAL1st walls LAYOUTSHEET NUMBER: 1NOTES: Scale: 3/8" = 1' rk Miles Inc. 21 West St. West Hatfield Ma.Wright/Safe PassageJOB: Safe passageDESIGNED BY: Doug HodginsSHIPPING INFORMATION:vertical load capacity.See Boise literature for joist vertical load capacity.See Boise literature for joist blockingLoad bearing wall above23/32" min. plywood/OSB high end of rafter. birdsmouth cut in bottom 2x6 one side for 240 PLF max. 2x4 one side for 135 PLF max. DECK FRAMING PLAN 2X8 ROOF RAFTERS 16" O/C 2X12 ROOF RAFTERS 16” O/C 1ST FLOOR FRAMING PLAN ROOF FRAMING PLAN ------- Floor Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R1 1 Spruce-Pine-Fir #2 2 x 6 14' 0" J1 3 v v 12' 0" R2 1 v v 12' 0" J2 9 v v 10' 0" R3 2 v v 10' 0" R4 1 v v 5' 0" Total length: 177' 0" ------- Beam & Ledger Material ------- Type Qty. Product Length ------ ---- ------- ------ G3 2 1-3/4x9-1/2 VERSA-LAM 2.0 3100 12' 0" Total length: 24' 0" ------- Header Material ------- Type Qty. Product Length ------ ---- ------- ------ B1 2 Spruce-Pine-Fir #2 2 x 8 4' 0" Total length: 8' 0" B2 2 Spruce-Pine-Fir #2 2 x 10 7' 0" Total length: 14' 0" B4 2 Spruce-Pine-Fir #2 2 x 8 4' 0" Total length: 8' 0" All product names are trademarks of their respective owners CEILING FRAMING PLAN SOLID BLOCKING OR METAL BRIDGING CEILING FRAMING PLAN BUILD DOWN GARAGE WALLS TO ACCOMIDATE FOR LARGER JOISTS HEADER & BEAM LAYOUT ROOF TRUSSES 24” O/C OVERFRAME TO ROOF BELOW ITS2561188 TOP MOUNT HANGERS ITS25695 TOP MOUNT HANGERS HHUS410 LVL HANGER 2 SIMPSON STHD14 STRAPS EMBEDDED INTO POUR 3RD FLOOR FRAMING LAYOUT This layout has been created using the information from the plan provided, and/or verbal information from the general contractor. r.k Miles assumes no responsibility for this layout if altered during construction or any of the structural members shown are not supplied by r.k. Miles It is the responsibility of the building contractor / owner to install and / or oversee the installation of all the engineered wood components to assure compliance with the manufacturers specifications.If any changes are made to this project after the completion of our layout contact RK Miles immediately ------------- Connector List ------------- ID# Qty Model Number Note Carrying mbr fasteners (top/face) Carried mbr fasteners (hip/jack) Skew Slope Top Detail ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- H1 4 LUS26 4 10d 3 10d C17128X.pdf ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- R1 R2 R3 R3 R4 J116" ocJ2 16" oc B12 plyB2 2 ply B42 plyG3 2 ply H1H1