Loading...
Friedman 4 (Permit) 2020-10-21 (1)12'-3"10'-0"15'-11 1/4"14'-2 3/4"16'-9"4'-5 3/4"8'-2 3/4"2'-5 1/4"4'-2 1/4"12'-10"9'-7 1/2" 4'-7 1/4" 5"5'-8"7 3/4"5"1'-7"11'-0" 5 1/8"10'-1 7/8"5 1/8"5"7'-3 3/4"10"7'-2"2"Demo existing screen / plexiglass wall systems Demo shakes Demo for new door Main House Den Garage Deck Screen Porch Bath 7'-4 3/4"Demo skylight Demo Window Existing 11" exposure painted shakes Proposed addition location Demo screen and plexiglass Demo Shakes Demo Shingles Demo skylight Proposed addition location1'-6"Demo shingles Demo shakes Teagno Construction Inc.18x24(413) 549-0803 design@teagnoconstruction.comTitlePageScale: TEAGNO CONSTRUCTION INC. Revisions 10/26/2020 8:41:54 AMAs indicated Existing Plans and Elevations A.1 2020-10-21 Permit Set 20-056 Friedman 34 James Ave Northampton Description Date Schematic Design 2 2020-09-03 Walkthrough Set 2020-09-08 Permit Set 2020-10-21 1/4" = 1'-0"1 Main Floor Existing 1/8" = 1'-0"2 West Existing 1/8" = 1'-0"3 North Existing 4 3D Existing 2'-10"4'-0" 6'-9 1/8" 9'-7 1/8"8'-0 1/8"3'-10"3'-2"4'-10 1/8"1'-10"Shower W/D 3'-0" 1 A.3 3 A.3 3'-0 1/8"2'-10" 9'-7 1/2" 4"2'-8"2'-2 5/8" 6'-4 3/4"6'-3"1'-1"1'-0 3/4"6'-3"6'-3"1'-1"1'-0 3/4"6'-3"10'-1 7/8"2'-1"2'-1"2'-4 5/8"2'-1"2'-6 1/2" Main House Garage Bath Den Bath Deck 3 Season Porch Infill skylight opening above -patch & repair ceiling Tile Floor 12x12 1 1 Laundry Box location Replace existing wood storm door with new Provia door Harvey Vinyl Porch system with sliding windows -confirm pet screening option Replace existing wood storm door with new Provia door 1 3 2 5 4 PC Repair existing rot on post Repair nail hole in wallboard Repair / replace existing plaster on this Garage wall only Replace existing asphalt driveway - widen by 3" on each side to allow for better manuverability 4'-10 3/8"5"4'-10 3/8" Cedar shakes to match Shingles to match Infill area above - both sides New awning window -match width and head height (Elevate ELCA2931?) Verify window height on site New Marvin Elevate ELDH2636 Siding to match Harvey 3 season porch wall system Teagno Construction Inc.18x24(413) 549-0803 design@teagnoconstruction.comTitlePageScale: TEAGNO CONSTRUCTION INC. Revisions 10/26/2020 8:41:57 AMAs indicated Proposed Plans and Elevations A.2 2020-10-21 Permit Set 20-056 Friedman 34 James Ave Northampton Description Date Schematic Design 2 2020-09-03 Walkthrough Set 2020-09-08 Permit Set 2020-10-21 1/4" = 1'-0"1 Main Floor Proposed 1/8" = 1'-0"4 North Proposed 1/8" = 1'-0"5 West Proposed 6 3D Proposed New framed glass shower door 4'-0"New 2x4 wall 16' o.c. Slab 2x6 ceiling joist 16" o.c.8'-0"R-49 Cellulose insulation R-49 Closed cell foam 2x10 roof rafters 16" o.c. 2x10 floor joists 16" o.c. R-30 insulation 7'-8"2x6 studs 16" o.c. R-22.5 Closed cell foam New 2x8-2 Headers R-22.5 Closed cell foam 2'-11 7/8"3'-9 1/8"2'-10" 9'-7"8'-0"2'-8" Wall mount med cab Swanstone walls and base (or similar) 2'-10" Hook Towel bars Grab bars Harvey Vinyl Porch system with sliding windows -confirm pet screening option 9'-11 7/8"12'-11"2'-1 7/8"Cut access / vent in existing concrete wall Vent in wall Existing cantilever12'-0 1/4"10'-0" Existing Deck Proposed Addition 19'-0"18'-3 3/4"Property Line Setback Property LineSetbackJames Ave#34 Site dimensions are approximate and are based on GIS information provided by the City of Northampton and site measurements Teagno Construction Inc.18x24(413) 549-0803 design@teagnoconstruction.comTitlePageScale: TEAGNO CONSTRUCTION INC. Revisions 10/26/2020 8:41:59 AMAs indicated Sections and Interior Elevations A.3 2020-10-21 Permit Set 20-056 Friedman 34 James Ave Northampton Description Date Schematic Design 2 2020-09-03 Walkthrough Set 2020-09-08 Permit Set 2020-10-21 1/4" = 1'-0"1 Section A 1/4" = 1'-0"3 Bath North Wall 1/4" = 1'-0"4 Bath West Wall 1/4" = 1'-0"5 Bath East Wall 1/4" = 1'-0"6 Bath South Wall 1/4" = 1'-0"2 South Elevation Proposed Window Schedule Mark Model Height Width Count Manufacturer Description Comments 1 ELDH2636 2'-11 3/4"2'-1 1/2"2 Marvin Elevate DH .28 U Value 2 ELCA2931 2'-7"2'-4"1 Marvin Elevate Casement .27 U Value 1/4" = 1'-0"7 Foundation Proposed 1" = 10'-0"8 Site Proposed Shelf inside vanity WORK LIST / SPEC LIST: Tile: • Bath floor to be 12x12 similar to kitchen in style and color Plumbing: • Replace one additional toilet upstairs (not shown) • Toilets to be elevated in height w/ elongated seat • Sink to be integral with countertop • Moen Fixture package -similar to MBath • Add second lower handheld shower mount location (similar to existing) • Replaced existing Kitchen sink faucet • REPAIR -MBath shower water pressure low -fixture limitations, or something else? Architectural Millwork: • Vanity cab to have mid shelf (cut for plumbing) • Countertops to be Swantstone • REPAIR -Kitchen cabinet hinges to be replaced 6-10 doors (Cup hinges) Windows: • All new windows to be Marvin Elevate, Painted interior, white hardware • REPAIR -3-4 windows sash ropes / weights Storm Windows: • 8 Storm windows to be repalced with new Electrical: • Check Smoke / CO detectors and replace if necessary (Not in Contract) Misc Carpentry: • Repair water table on Shed • Patch GWB in Sitting Room (next to new bath door) Repair Work: • Repair tree damage to house and shed as required. Confirm with insurance appraisal and update insurance company and necessary Door Schedule Mark Width Height Comments Description Finish Count 1 2'-8"6'-8"Left Hand Solid Core - 2 Panel Paint 1 2 2'-8"6'-8"Bi-fold Bi-Fold Paint 1 3 2'-6"6'-10"Shower Door Glass 1 4 2'-6"6'-8"Replace Storm Door -Verify size Aluminum 1 5 2'-6"6'-8"Replace Storm Door -Verify size Aluminum 1