Friedman 4 (Permit) 2020-10-21 (1)12'-3"10'-0"15'-11 1/4"14'-2 3/4"16'-9"4'-5 3/4"8'-2 3/4"2'-5 1/4"4'-2 1/4"12'-10"9'-7 1/2"
4'-7 1/4"
5"5'-8"7 3/4"5"1'-7"11'-0"
5 1/8"10'-1 7/8"5 1/8"5"7'-3 3/4"10"7'-2"2"Demo existing
screen / plexiglass
wall systems
Demo shakes
Demo for new door
Main House
Den
Garage
Deck
Screen Porch
Bath 7'-4 3/4"Demo skylight
Demo Window
Existing 11"
exposure
painted
shakes
Proposed addition
location
Demo
screen and
plexiglass
Demo
Shakes
Demo
Shingles
Demo skylight
Proposed
addition
location1'-6"Demo
shingles
Demo
shakes
Teagno Construction Inc.18x24(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
10/26/2020 8:41:54 AMAs indicated
Existing Plans and
Elevations
A.1
2020-10-21
Permit Set
20-056
Friedman
34 James Ave
Northampton
Description Date
Schematic Design 2 2020-09-03
Walkthrough Set 2020-09-08
Permit Set 2020-10-21
1/4" = 1'-0"1 Main Floor Existing
1/8" = 1'-0"2 West Existing
1/8" = 1'-0"3 North Existing
4 3D Existing
2'-10"4'-0"
6'-9 1/8"
9'-7 1/8"8'-0 1/8"3'-10"3'-2"4'-10 1/8"1'-10"Shower
W/D
3'-0"
1
A.3
3
A.3
3'-0 1/8"2'-10"
9'-7 1/2"
4"2'-8"2'-2 5/8"
6'-4 3/4"6'-3"1'-1"1'-0 3/4"6'-3"6'-3"1'-1"1'-0 3/4"6'-3"10'-1 7/8"2'-1"2'-1"2'-4 5/8"2'-1"2'-6 1/2"
Main House
Garage
Bath
Den
Bath
Deck
3 Season Porch
Infill skylight
opening
above -patch
& repair ceiling
Tile Floor 12x12
1
1
Laundry Box location
Replace existing wood
storm door with new
Provia door
Harvey Vinyl Porch
system with sliding
windows -confirm
pet screening option
Replace existing wood
storm door with new
Provia door
1
3
2
5
4
PC
Repair existing rot on post
Repair nail hole in wallboard
Repair / replace
existing plaster on this
Garage wall only
Replace existing
asphalt driveway -
widen by 3" on each
side to allow for better
manuverability
4'-10 3/8"5"4'-10 3/8"
Cedar shakes
to match
Shingles to match
Infill area above -
both sides
New awning window -match width and
head height (Elevate ELCA2931?)
Verify window height on site
New Marvin
Elevate ELDH2636
Siding to match
Harvey 3 season
porch wall system
Teagno Construction Inc.18x24(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
10/26/2020 8:41:57 AMAs indicated
Proposed Plans
and Elevations
A.2
2020-10-21
Permit Set
20-056
Friedman
34 James Ave
Northampton
Description Date
Schematic Design 2 2020-09-03
Walkthrough Set 2020-09-08
Permit Set 2020-10-21
1/4" = 1'-0"1 Main Floor Proposed
1/8" = 1'-0"4 North Proposed
1/8" = 1'-0"5 West Proposed
6 3D Proposed
New framed glass shower door
4'-0"New 2x4 wall 16' o.c.
Slab
2x6 ceiling joist 16" o.c.8'-0"R-49 Cellulose insulation
R-49 Closed cell
foam
2x10 roof rafters 16" o.c.
2x10 floor joists 16" o.c.
R-30 insulation 7'-8"2x6 studs
16" o.c.
R-22.5
Closed
cell foam
New 2x8-2 Headers
R-22.5 Closed cell foam
2'-11 7/8"3'-9 1/8"2'-10"
9'-7"8'-0"2'-8"
Wall
mount
med
cab
Swanstone
walls and
base (or
similar)
2'-10"
Hook
Towel bars
Grab bars
Harvey Vinyl Porch
system with sliding
windows -confirm
pet screening option
9'-11 7/8"12'-11"2'-1 7/8"Cut access / vent in
existing concrete wall
Vent in wall
Existing
cantilever12'-0 1/4"10'-0"
Existing Deck
Proposed
Addition 19'-0"18'-3 3/4"Property Line
Setback
Property LineSetbackJames Ave#34
Site dimensions are approximate and are
based on GIS information provided by the
City of Northampton and site
measurements
Teagno Construction Inc.18x24(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
10/26/2020 8:41:59 AMAs indicated
Sections and
Interior Elevations
A.3
2020-10-21
Permit Set
20-056
Friedman
34 James Ave
Northampton
Description Date
Schematic Design 2 2020-09-03
Walkthrough Set 2020-09-08
Permit Set 2020-10-21
1/4" = 1'-0"1 Section A
1/4" = 1'-0"3 Bath North Wall
1/4" = 1'-0"4 Bath West Wall
1/4" = 1'-0"5 Bath East Wall
1/4" = 1'-0"6 Bath South Wall
1/4" = 1'-0"2 South Elevation Proposed
Window Schedule
Mark Model Height Width Count Manufacturer Description Comments
1 ELDH2636 2'-11 3/4"2'-1 1/2"2 Marvin Elevate DH .28 U Value
2 ELCA2931 2'-7"2'-4"1 Marvin Elevate Casement .27 U
Value
1/4" = 1'-0"7 Foundation Proposed
1" = 10'-0"8 Site Proposed
Shelf
inside
vanity
WORK LIST / SPEC LIST:
Tile:
• Bath floor to be 12x12 similar to kitchen in
style and color
Plumbing:
• Replace one additional toilet upstairs (not
shown)
• Toilets to be elevated in height w/
elongated seat
• Sink to be integral with countertop
• Moen Fixture package -similar to MBath
• Add second lower handheld shower mount
location (similar to existing)
• Replaced existing Kitchen sink faucet
• REPAIR -MBath shower water pressure
low -fixture limitations, or something else?
Architectural Millwork:
• Vanity cab to have mid shelf (cut for
plumbing)
• Countertops to be Swantstone
• REPAIR -Kitchen cabinet hinges to be
replaced 6-10 doors (Cup hinges)
Windows:
• All new windows to be Marvin Elevate,
Painted interior, white hardware
• REPAIR -3-4 windows sash ropes /
weights
Storm Windows:
• 8 Storm windows to be repalced with new
Electrical:
• Check Smoke / CO detectors and replace
if necessary (Not in Contract)
Misc Carpentry:
• Repair water table on Shed
• Patch GWB in Sitting Room (next to new
bath door)
Repair Work:
• Repair tree damage to house and shed as
required. Confirm with insurance appraisal
and update insurance company and
necessary
Door Schedule
Mark Width Height Comments Description Finish Count
1 2'-8"6'-8"Left Hand Solid Core - 2 Panel Paint 1
2 2'-8"6'-8"Bi-fold Bi-Fold Paint 1
3 2'-6"6'-10"Shower
Door
Glass 1
4 2'-6"6'-8"Replace Storm Door -Verify size Aluminum 1
5 2'-6"6'-8"Replace Storm Door -Verify size Aluminum 1