Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Friedman 4 (Permit) 2020-10-21
12'-10"5"5'-8"7 3/4"5"1'-7"11'-0" 5 1/8"10'-1 7/8"5 1/8"5"7'-3 3/4"10"7'-2"2"Demo existing screen / plexiglass wall systems Deck Screen Porch Teagno Construction Inc.18x2410/21/2020 3:43:24 PM1/4" = 1'-0"1 Main Floor Existing 6'-3"1'-1"1'-0 3/4"6'-3"6'-3"1'-1"1'-0 3/4"6'-3"10'-1 7/8"2'-1"2'-1"2'-4 5/8"2'-1"2'-6 1/2" Deck 3 Season Porch Replace existing wood storm door with new Provia door Harvey Vinyl Porch system with sliding windows -confirm pet screening option 4 4'-10 3/8"5"4'-10 3/8"Teagno Construction Inc.18x2410/21/2020 3:43:26 PM1/4" = 1'-0"1 Main Floor Proposed 12'-0 1/4"Existing Deck Proposed Addition Property LineSetbackJames Ave#34 Teagno Construction Inc.18x2410/21/2020 3:43:26 PM1 2 1" = 10'-0"8 Site Proposed 1 2 3 4 5