Loading...
dero-parklet installation1 2 www.dero.com | 1-888-337-6729 © 2015 Dero Install (5) Joists per section with 3/8” x 5.5” bolts, washers, and nuts. The flush side of the Joist should be upwards. Assemble the Gap Cover, Deck End, and hinges with ¼” x ¾” carriage bolts, lock washers, and nuts. Place the Gap Cover assemblies on the side of the deck that will be adjacent to the curb and attach with 3.8” x 5” bolts, washers, and nuts. Keep hardware finger-tight. 3 4 Place the 4” square pieces about 100.5” on- center. Use as many pieces as necessary for the length of deck being built. Placement should be close to the final desired location. The whole deck may be nudged using wood 2x4’s as levers. For example, it may be easier to leave the deck 6” from a curb to aid assembly. For installation on a sloped surface, use (1) leveling foot on each piece. PARKLET Installation Instructions - Deck (1 of 2) TOOLS NEEDED Tape measure Level 9/16” Socket wrench and box wrench 7/16” Socket wrench 7/16” Allen wrench www.dero.com | 1-888-337-6729 © 2015 Dero Place (2) Deck Panels per section. Deck Panels should go underneath the lip of the Deck Ends. When all Deck Panels are placed, the Deck Ends should be pressed down and their hardware fully tightened. Nudge deck assembly as close to the curb as possible using wood 2x4’s as levers. Lower the Gap Cover to sit on top of the curb. 5 6 PARKLET Installation Instructions – Deck (2 of 2) www.dero.com | 1-888-337-6729 © 2015 Dero PARKLET Installation Instructions - Railing Place Railing Uprights on (4) outermost deck corners and along deck side adjacent to street. Attach with 3/8” x 1” bolts and lock washers. Keep hardware finger-tight. Attach Railing between Uprights with 3/8” x 1” bolts and lock washers. Shorter Railings are placed on the ends and longer Railings are placed adjacent to the street. Fully tighten all hardware. 1 2 www.dero.com | 1-888-337-6729 © 2015 Dero Refer to cable instructions for details on attaching the cable to the end fittings. Pull the cable taught and confirm the first end fitting is completely seated in the Railing Upright. Mark the cable 1.5” from the inside surface of the last Railing Upright and trim with an angle grinder fitted with a cut-off wheel. Use the side of the cutoff wheel to de-burr the cable end. Attach male end fitting to cable and attach to female fitting with plastic washer and metal washer. Tighten with Allan wrench and repeat with other cables. After tightening last cable, return to previous cable and check tightness. Run the first cable with end fitting, plastic washer, and metal washer through one set of holes in the Railing Uprights. 1 3 4 2 PARKLET Installation Instructions - Cables