Loading...
2020-Engineer EstimateProject Preliminary Design Estimate 570.2 HOT MIX ASPHALT CURB T FT $8.750 30.000 $262.50 453.HMA JOINT SEALANT FT $1.100 63.000 $69.30 482.3 SAWCUTTING ASPHALT PAVEMENT FT $3.000 63.000 $189.00 116.REMOVAL OF TEMPORARY STRUCTURE LS *$500.000 1.000 $500.00 120.1 UNCLASSIFIED EXCAVATION CY $28.000 150.000 $4,200.00 125.TOPSOIL EXCAVATED AND STACKED CY $21.500 30.000 $645.00 452.ASPHALT EMULSION FOR TACK COAT GAL $8.000 40.000 $320.00 101.CLEARING AND GRUBBING A $25,050.00 0 0.050 $1,252.50 102.51 INDIVIDUAL TREE PROTECTION EA *$260.000 1.000 $260.00 129.2 OLD PAVEMENT EXCAVATION SY *$70.000 46.000 $3,220.00 402.13 PAVEMENT MILLING MULCH FOR SHOULDERS FT *$4.500 17.000 $76.50 450.22 SUPERPAVE SURFACE COURSE – 9.5 (SSC – 9.5) TON $124.000 25.000 $3,100.00 450.31 SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5) TON $187.500 25.000 $4,687.50 150.ORDINARY BORROW CY $40.000 4.000 $160.00 151.GRAVEL BORROW CY $72.000 70.000 $5,040.00 152.PROCESSED GRAVEL CY $40.000 71.000 $2,840.00 Item #Description Units Type Unit Price NFA - Other State Funds - Site Specific Total Friday, September 13, 2019Measure System:E Description:Northampton - Edwards Square Bike Ramp Date: District:2 Project:1 Project Preliminary Design Estimate 832.WARNING- REGULATORY AND ROUTE MARKER - ALUMINUM PANEL (TYPE A) SF $12.000 18.000 $216.00 869.06 6 INCH REFLECTORIZED YELLOW LINE (EPOXY) FT *$0.490 64.000 $31.36 841.5 SUPPORTS FOR GUIDE SIGN (D8 -P5 POSTS) STEEL EA $40.000 3.000 $120.00 868.06 6 INCH REFLECTORIZED WHITE LINE (EPOXY) FT *$0.490 40.000 $19.60 864.07 PAVEMENT ARROW AND LEGENDS (EPOXY) SF *$20.000 16.000 $320.00 620.13 GUARDRAIL, TL- 3 (SINGLE FACED) FT $26.380 18.000 $474.84 765.SEEDING SY $2.000 155.000 $310.00 697.SEDIMENTATION FENCE FT $6.000 150.000 $900.00 752.TOPSOIL REHANDLED AND SPREAD CY $20.000 20.000 $400.00 707.8 STEEL BOLLARD EA *$1,050.000 1.000 $1,050.00 Total Amount $30,664.10 $30,664.10 Item #Description Units Type Unit Price NFA - Other State Funds - Site Specific Total