2020-Engineer EstimateProject Preliminary Design Estimate
570.2 HOT MIX
ASPHALT CURB T
FT $8.750 30.000 $262.50
453.HMA JOINT
SEALANT
FT $1.100 63.000 $69.30
482.3 SAWCUTTING
ASPHALT
PAVEMENT
FT $3.000 63.000 $189.00
116.REMOVAL OF
TEMPORARY
STRUCTURE
LS *$500.000 1.000 $500.00
120.1 UNCLASSIFIED
EXCAVATION
CY $28.000 150.000 $4,200.00
125.TOPSOIL
EXCAVATED AND
STACKED
CY $21.500 30.000 $645.00
452.ASPHALT
EMULSION FOR
TACK COAT
GAL $8.000 40.000 $320.00
101.CLEARING AND
GRUBBING
A $25,050.00
0
0.050 $1,252.50
102.51 INDIVIDUAL
TREE
PROTECTION
EA *$260.000 1.000 $260.00
129.2 OLD PAVEMENT
EXCAVATION
SY *$70.000 46.000 $3,220.00
402.13 PAVEMENT
MILLING MULCH
FOR SHOULDERS
FT *$4.500 17.000 $76.50
450.22 SUPERPAVE
SURFACE COURSE
– 9.5 (SSC –
9.5)
TON $124.000 25.000 $3,100.00
450.31 SUPERPAVE
INTERMEDIATE
COURSE - 12.5
(SIC -12.5)
TON $187.500 25.000 $4,687.50
150.ORDINARY
BORROW
CY $40.000 4.000 $160.00
151.GRAVEL BORROW CY $72.000 70.000 $5,040.00
152.PROCESSED
GRAVEL
CY $40.000 71.000 $2,840.00
Item #Description Units Type Unit Price NFA - Other State Funds - Site Specific Total
Friday, September 13, 2019Measure System:E
Description:Northampton - Edwards Square Bike Ramp
Date:
District:2
Project:1
Project Preliminary Design Estimate
832.WARNING-
REGULATORY AND
ROUTE MARKER -
ALUMINUM PANEL
(TYPE A)
SF $12.000 18.000 $216.00
869.06 6 INCH
REFLECTORIZED
YELLOW LINE
(EPOXY)
FT *$0.490 64.000 $31.36
841.5 SUPPORTS FOR
GUIDE SIGN (D8
-P5 POSTS)
STEEL
EA $40.000 3.000 $120.00
868.06 6 INCH
REFLECTORIZED
WHITE LINE
(EPOXY)
FT *$0.490 40.000 $19.60
864.07 PAVEMENT ARROW
AND LEGENDS
(EPOXY)
SF *$20.000 16.000 $320.00
620.13 GUARDRAIL, TL-
3 (SINGLE
FACED)
FT $26.380 18.000 $474.84
765.SEEDING SY $2.000 155.000 $310.00
697.SEDIMENTATION
FENCE
FT $6.000 150.000 $900.00
752.TOPSOIL
REHANDLED AND
SPREAD
CY $20.000 20.000 $400.00
707.8 STEEL BOLLARD EA *$1,050.000 1.000 $1,050.00
Total Amount $30,664.10 $30,664.10
Item #Description Units Type Unit Price NFA - Other State Funds - Site Specific Total