Loading...
CONTRACT amendment-224-20-1-Marion Excavating-CDBG-ramps-WF6.17.20201 Contract # CITY OF NORTHAMPTON MASSACHUSETTS Contract Agreement for Construction of Northampton Shared Use and Sidewalk Ramps Project )LUVW$PHQGPHQW THIS AGREEMENT, executed this _____day of -XQH, 2020 by and between 0DULRQ([FDYDWLQJ&R ,QF1HZ/XGORZ5RDG6RXWK+DGOH\0$hereinafter called "Vendor" and the City of Northampton, a municipal corporation in the County of Hampshire, Commonwealth of Massachusetts, party of the second part hereinafter called "Owner." WHEREAS, Contract #224-20 ($255,955) covers the work in the base bid and alternatives 1 and 2; WHEREAS, This contract amendment adds alternative 3 from the original bid to the contract (ramps #28, 29, and 30); WHEREAS, the plans and specifications for the additional are shown in the initial contract, as amended by the attached plan and proposal. The deadline construction substantial completion is extended to August 31, 2020 and fully complete to September 1, 2020. THE OWNER shall pay the Vendor for the performance of this contract amendment in the of sum of Fifty-Two 7KRXVDQGFour+XQGUHGDQGSixty-Two and 72/100 Dollars ($52,462.72) as a lump sum flat rate (not based on line items) in accordance with the terms of this contract and the above referenced plans. EXCEPT AS HEREIN NOTED, all contract terms, conditions, and certifications remain unchanged. 3 The vendor does not have a Northampton office. IN WITNESS WHEREOF the Owner caused these presents to be signed in quadruplicate and approved by David Narkewicz its Mayor and the said Vendor has caused these presents to be signed in quadruplicate and its official seal to be hereto affixed by its officer or agent thereunto duly authorized (by the attached corporate resolution). This instrument shall take effect as a sealed instrument. 0DULRQ([FDYDWLQJ&R,QF, Vendor Authorized Signatory E\LWV Title Date Certificate by Corporation to Sign Contract At a duly authorized meeting of the Board of Directors of the 0DULRQ([FDYDWLQJ&R,QFheld on __________. (Date) At which all the Directors were present or waived notice, it was voted that, the Authorized Signatory of this company, be and he hereby is authorized to execute contracts and bonds in the name and behalf of said company, and affix its Corporate Seal thereto, and such execution of any contract or obligation in this company's name on its behalf by such officer under seal of the company, shall be valid and binding upon this company, A TRUE COPY, ATTEST: (Clerk) Place of Business: Date of this Contract: CITY OF NORTHAMPTON: ______________________Date ____________ Wayne Feiden, FAICP, Director of Planning and Development _______________________Date ___________ Joyce Karpinski, City Auditor, approved as to appropriation. _______________________Date ____________ Joe Cook, Chief Procurement Officer, approved as to c. 30B compliance Date Mayor David Narkewicz Marion Excavating Co., Inc. P.O. Box 13 749 New Ludlow Rd. South Hadley, MA 01075 Phone: 413-536-1267 Fax: 413-536-2230 PROPOSAL Page 1 To: Northampton Shared Use & Sidewalk Ramps Wayne Feiden Director Planning & Sustainability City of Northampton 210 Main St, City Hall Northampton, MA 01060 Change Order: CO 01 Job Number: 2060402 Date: 6/16/20 Description Change Order 1 Pine Street Ramps 28, 29, & 30. This pricing is based on 6/12/20 adjusted ramp design & existing project specifications. Scope of work includes: Mobilize Equipment. Furnish & install tree protection. Furnish & install silt sack & compost tube erosion control . Furnish & install temporary chain link. Furnish & install temporary safety signs. Furnish & install traffic management cones/drums. Furnish & install temporary accessible pedestrian route. Police detail as needed. Saw cut, remove & dispose existing asphalt pavement & sidewalk. Install previously stacked straight granite curb from temporary laydown yard (Construction Services). Furnish & install new radius granite curb. Furnish & install supplemental gravel for fine grading, excluded full depth gravel replacement. Fine grading for sidewalks & asphalt patching. Furnish & install cement concrete wheelchair ramps w/detectable warning mats. Furnish & install asphalt curb patching & 5’x 5’ asphalt sidewalk tie-in patch. Furnish & install thermoplastic traffic markings. Furnish & install permanent traffic signs. Loam & seed disturbed areas. Curb fabrication & delivery lead time applies. Thermoplastic markings will be all locations at one time, no separate mobilizations. Proposal Total:$ 52,462.72 Acceptance Accepted by: Title: Date: