Loading...
23A-114 (13) NORTHAMPTON CO-OP BANK n CQ �( ENERGY SYSTEMS U1 ---1 BASIS OF DESIGN NARRATIVE NOV 2 4 2004 FLORENCE,MA l� V DEPT OF WILDING INSPECTIONS NOM Information required pursuant to the Massachusetts State Building Code 780 CMR, 1301.8.4.1. Owner: Northampton Co-Op Bank Designers of Record: Lindgren& Sharples, P.C. Consulting Engineers Date of Submittal: November 22, 2004 1. Design Intent • This project consists of a new branch bank building and retail building. This project will include the installation of new gas fired furnaces and air conditioning for both buildings. • The Project is located at 8 Main Street. The Building Use Group for the Bank Building is Business B with construction type 3B unprotected. The retail building is mercantile construction 3B as defined by the Massachusetts State Building Code. • The building consists of approximately 2,400 square feet of floor space on one level for the Bank, and 2,600 square feet of floor space for the Retail Building. • Both buildings are new construction with exposed standing seam metal roof and exposures on north, south, east and west elevations. The operating schedule is 12 hours/day six days per week... L&S 1081 Page 1 • Heating will be supplied from two gas-fired high efficiency furnaces per building, each sized and controlled to achieve operating flexibility and efficient operation. • Lighting and power systems have been designed to provide proper ambient light, accent lighting as well as operating flexibility and efficient operation. • The designer of record will verify that the systems have been installed in substantial accordance with the approved construction documents, in conformance with 780 CMR 1301.8.4.4. 2. Basis of Design • The following are the assumptions used to calculate the capacities and parameters for the building components. HVAC Interior temperature set points: • 70 deg. F. heating when occupied; 55 deg. F. heating when unoccupied. • 74 deg. F. cooling when occupied; 90 deg. F. cooling when unoccupied. Outdoor ambient design temperatures: • 0 deg. F. winter • 87 deg. F. db, 73 deg. F. wb summer Occupancy • 24 - Bank • 45 - Retail Envelope • 3035 sf gross wall area - Bank • 381 sf gross glass area - Bank • 3081 sf gross wall area - Retail • 372 sf gross glass area - Retail • 14'-0"envelop wall height • All walls are masonry with furred-out metal studs. • Glass is double-glazed, low-E, insulating glass. • Glass and walls have a north, south, east, and west exposure. L&S 1081 Page 2 • Mechanical outside ventilation air is provided at 15 cfm/occupant. Lighting • 50 foot candles ambient lighting provided offices—Bank. • 5 foot candles general lighting for Retail Building—(temporary). • 1.2 watts per gross square foot for ambien�lighting. • 30 foot candles general lighting for all corridor, storage areas. 3. Sequence of Operations and Interactions HVAC • Heating will be provided by two gas-fired furnaces (per building). Each unit will be controlled buy local programmable thermostat allowing for variable space set points and occupancy schedules. • Fresh air motorized dampers will be open during all occupied periods providing code-compliant ventilations. Fresh air damper will be closed during off-hour unoccupied periods. Lighting • Emergency lighting and exit sign lighting will be fed from self contained battery packs. • All lighting will be controlled by local switches. 4. Systems and Equipment Capacities HVAC • The new furnaces and cooling coils will be a �onstant volume air system. The furnaces are hi efficiency 92% conder . style. Each unit is rated for t� Y ( ) g Y 93,000 Btuh heating, 48,000 Btuh cooling, and will provide 400 cfm of outside ventilation air. Lighting • The ambient lighting system will be accomplished with a combination of direct and indirect fluorescent fixtures. The lighting controls will be located locally and operated with ease. L&S 1081 Page 3 5. Testing • The following tests and inspections shall be performed by the General Contractor with the Owner and the Owners representative present. The test and inspections must comply with the criteria stated for the work to be accepted. HVAC • Inspect new furnaces, coils and fans for any physical damage. There shall be no dents or distortion of the metal. • Inspect new furnaces, coils and fans for any unusual noise or vibration. There shall be no unusual noise or vibration when the unit is operating. • Inspect new piping and equipment for leaks. • The HVAC system shall be tested to verify that the final TAB report is correct. Readings within 10% of those listed on the final TAB report shall be considered acceptable. If the readings are not acceptable, then all systems in the space must be balanced and a new final TAB report prepared. After the new final TAB report is issued, all HVAC systems in that space will be tested to verify that the new final report is correct. • Verify that the HVAC system is functioning correctly. The control valves shall operate when the space sensor calls for heat and the air conditioner must function when the space sensor calls for cooling. The outside air damper shall open when the temperature control system is in the occupied mode and shall remain closed when the temperature control system is in the unoccupied mode. Lighting • Demonstrate that the time clocks controlling the lighting system automatically turn the lights off and on at the prescribed times. • Inspect that all lamps in all the fixtures are functioning. 6. Operation Manuals and Maintenance Manuals When the buildings are completed and ready for occupancy, the General Contractor shall provide the following items before the review and final testing will begin. L&S 1081 Page 4 HVAC • Two complete sets of operating manuals. • Two complete sets of maintenance manuals. The manuals shall cover all new HVAC equipment. Electrical • Two complete sets of operating manuals. The manuals shall cover occupancy sensors,time clock controls, and light fixtures 7. Record Drawings and Control Documents When the both buildings are complete and ready for occupancy, the General Contractor shall provide the following items before the review and final testing will begin. • As-Built Drawings for the HVAC, electrical, and lighting systems. • Copy of the final test, adjust and balance (TAB)report. ***END OF NARRATIVE*** REPORT BY: Marvin Blakley ers/1256/admin L&S 1081 Page 5 " gal 19AA I< Envelope Compliance Report Massachusetts Commercial Code rn2 C UMc beck-EZ Sofiu are Version 2.4 Release 1 ! Data filename:1\1:\04019-NCR-FLorence\Uocumenv',Com Chcck energy analysis bank cck.cck Li l NOLV ,21 200Section l: Project Information 4Project Name: Nunhampton Cooperative Bank-Banl:fiuilding OEPTOr fHSP ,JR Main Street � 9� �CT10ryS 1060 Florence. M A 01060 Dc5igner/Contractor: Kuhn Riddle Architect; 7 North Pleasanst Street Amhcrnt.MA 01002 Document Author: Erica Gccs AIA Section 2: General Information Building Location: Northamptcn.Massachusetts Climate 7one: 14a Heating Uegrce (ba,c 65 dcgrce.s F): 6894 Cooling Dcercc Da%s(base 65 degrees F): .i-)7 Building Use Method of Compliance: Whoic Building Method Building 7 ire _-, Floor Arta Office 2401 Project De:criprton(check unc): •_ New C'onstructton —Addition Alteration _Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Air Lcakake.Component Certif5catinn,and Vapor Retarder Requirements Inspection Approved Initial Date (Y/N) All joint~and penetrations are caulked.gasketed, weather-stnpped,or uthcntisc sealed _ Window,,doors,and>kylighu certified as meeting leakage requirement: Component R-value:&U-factors labeled as certified Vapor retarder inaulied Climate-Specific Requirements Gross Caviry Cont. Proposed Budget Component Namt,'Dcscription Area R-Value R-Value U-Factor U-Factor Rool'l: All-Wood Joi::VRafter/Trua 2401 38.0 0.0 0.028 0.054 Exterior Wall 1: Solid Concrete or Masonry=8'• rtlrring: Metal 2731 16.2 0.0 0.120 0.079 Windov. l: Wood Frame. Double Pane with Low-E Clear.;hgc 0.28 21R --- --- 0.430 0.547 Window 2: Metal Frame with Thermal Break.Triple Pane N."ith Low-E Tinted.shvc US 31 --- --- 0.630(b) 0.547 Door 1: Solid 21 - --- 0.180 0.127 EXLcrior Wall 2: Mctal Frame. 16" O.C. 254 0.0 19.0 0.047 0.079 Window 3: Metal f=rame with Themial Break. Double Pane with Low-E Clear.shgc 0.28 70 --- --- 0.280 0.547 Door 4. Air Lock Entry 62 — -- 0.630(b) 0.127 Interior Will 2: Nfetal Frame. 16" o.c. 1036 5.0 5.0 0.094 0.127 Floor l: Unheated Slab-Un-Grade, Depth 4 R.ie) 220 — 10.0 -- — (a) Budget l!-launr..arc u,vd for 3ul'a.are baseline calculations ONLY,and arc not code requirements. (b)Claimed perfonnancc dim not cxcaed dcfaulrc in Tahlcs 1301.9.: 1.No manufacturer certification required. (c)Ccrtain building uac qTc-require crnrinuous under-:Irh in-•uLiiirn(,cam Massachusetts Code Section 1304.2.7 and 1304.2.S). Envelope PASSES: Design 2R°ln boner than code Section 4: Compliance Statement The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the Massachusetts C otnmcrcial Code requirements in COMcheck-EZ Version 2.4 Release 1. 09-ICs} 2&;6 Principal Envelope Designer-Name Signature Date 11LJV`! 1JLJ lllal 'f1V LV J1 vt1 a�vua• • �✓✓...... •�.•..-� v � Lighting Compliance Certificate Massachusetts Commercial Code CONlcheck-L•Z Sollmurc Venion 2.4 Rcicasc 1 Data filename: M:\0401 A -NCB -FLorencecDocumenta\Com Check energy analysis bank:cckcck Section l: Project Information Project Name: North=pton Cooperative Bank-Bank Building R Main Street Florence. MA 01000 Designer'C'ontractor. Kuhn {fiddle A.rchi ects 7 North Pleasarst Street Amherst.MA 01002 Docwnent .kuthor: Erica Gees AIA Section 2: General Information Building Location: Northampton,Massachuscru Climate Zonc: 14a Heating Degree Days(base 65 degrees F): 0894 Cooling Degree Days(base 65 degree:F): 507 Building Use Method of Compliance: Whole Building Method Building Type _ _ __ __ __ Floor Area Office ?401 Project Description(check:one): New Construction Addition _Alteration _Unconditioned Shell(File Aifida,-it) Section 3: Requirements Checklist Inspection Approved Initial Date (Y/N) Controls, SA itching.and Wiring lndcpcndcnt controls for each space(switclvoccupancy sensor) Exceprinns Securiry lighting,building lobby/retail store/mall Master switch at entry to hoteUmotel guest room Two s vuchc>. dimmer. or occupancy sensor in each space providing a uniform illumination pattern Exceplium: Only one luminaire in space; Aii occupant-:encin„, device controls the area: The area is a corridor.starage.restroom.or lobby Photocelllwtmnomical time,witch on exterior lichts Exccpriat.c. i.arge covered irzi.,requiring lighting during daylight hours Tandem wind one-lamp and duce-lamp ballasted luminaires _ E•xceprinns: Electronic high-frrqucncy ballasted luminaires not on same.witch Interior Lighting 11' r v yv ry •.�.- .-v-vv-v-r ------ ---- TSA%1 Lighting Application Worksheet Massachusetts Commercial Code CONIcht�ck-FZ Software Ver.ion 2.4 Release l Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Wats Buildin!T\pc _ (Q) (watts./ft2) (B x C)- Office )_Offce 2401 1.3 3121 Total Allowed Watts= 3121 Section 2: Actual Lighting Power Calculation A B C D C F FLUUre fixture Dc,criptiun/ Lamps/ it of Fixture ID Lamp Description;WauaKe Per Lamp/Ballast Fixture Fixtures Watt. D( x F) A C'FILING RECESSED 124"TR 17W/Electronic 2 17 34 578 B CFTT TNC'r RF.CESSM/ 24"TRU 32W!Flectronic 2 6 64 384 D ('L•ILNG RL•CL•SSL•D/48" f8 32W/Electronic 2 8 64 512 E CEILNG RECESSED/48" TR 32W/Electronic 1 2 34 68 F CF.U..NG RFCESSFT)/Other/F..lectronic 2 2 64 128 G CUL1NG RECESSED/Other/ L•'lectronic 2 6 52 312 H CEILING RECESSED/Other/ Electronic 1 7 32 224 i PF.ND-,,NT /Incandescent 6OW 3 1 180 180 L RECC'ESSD SOFFIT 148"T8 32W/Electronic 2 4 64 256 N SURl'ACE PLNDANT 148" T8 32W/Electronic 2 ? 64 128 P CEILNC'r PENDANT/Incandescent 60W 3 1 180 180 Q WAT.I. Si RFACF/24" TR 17W/Electronic 2 1 34 34 R WM l 12r-CI'SSF0 /OTher/Electronic 1 2 32 64 U UNDLIL COUNTER LIGHT/24" 'r8 17W/Llectronic 1 2 17 34 Total Actual Watts= 3082 Section 3: Compliance Calculation If the Tourl.411an•cal [Fairs minus the Toral,lcrua/Warts is greater than or equal to zero.the building complies. Total Allowed Watts= 3121 Total Actual Watts= 3082 Project Compliancc= 39 Lighting PASSES: Dc>ign 1^/4 better than code ii. rv. vi sv.ry • u. Fav rv..s..r� ..�.+.. ..�........ ....�.. � .. Total actual watt.: must he less than or equal to total allowed watts Allowed Wan; Actual WAILS Complies(Y'N) 3131 3092 YES Exterior Lighting Typc(a)of cxtcnor lighting sources: fluorescent Metal Halide _ High-Pr. Sodium _ Excepl ul1!': Specialized signal.directional. and marker lighting. lighting highlighting exterior features of historic buildings: advertising signage:safcty or security lighting: lout-voltage landscape lighting. Section 4: Compliance Statement The proposed lighting design represented in this document is consistent with the building plans,bpecifications and other calculations submitted With thi;permit application. The proposed lighting system has been designed to meet the Massachusetts Commercial Code requirements in COMcbecl:-EZ Vcrsion 2.4 Release 1. t I 2.)4+-f , Principal Lighting Da!zigner-Name Signature Date -- - - - — - - - -- krGTAIL, Envelope Compliance Report Massachusetts Commercial Code COMchc-cd-EZ Software Version 2.4 Release 1 Data filen:unc: M:'04018 -NCB -FT.orence\Documentt\Com Check energy analysis retail.eck Section 1: Project Information Project Nan-tc: Northampton Cooperative Bank-Retail Building R Main Street Florence, MA 01060 Dc,igncr/Contractor: Kuhn Riddle Architects 7 North Plcasanst Street Anihergt_MA 01002 Documcnt.Author: Erica Gees AIA Section 2: General Information Building Location: Northampton,Massachusetts Climate Zone: l4a 1 leating Degree Days(bane 65 degrees F): 6894 Cooling Degree Days(base 65 degrees F): 507 Building U:ie Method of Compliance: Whole Building Method Building TyRc door Area Retail 2660 Protect Decription (check one): New Ccn-,trUCLIon Additien Alteration Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Air Leakage, Component Certification, and Vapor Retarder Requirements Inspection Approved Initial Date (Y/1) All joints and penetration:are caulked,gasketed. weather-stripped. or otherwise sealed Windows.doors.and skylights certified as meeting leakage requirements Component R-value.&U-factors labeled as certified Vapor retarder installed e- Climate-Specific Requirements Gros Cavity Con(. Proposed Budget Component N3me/Oz.:crip6on Area R-Value R-Value U-Factor U-Factor Roof 1: .411-Wnod.lni:t/Rafter/Truss 2660 38.0 0.0 0.028 0.054 L`Merior Wall 1: Solid Concrete or lviasonry>8" Furring: Meral 3081 16.2 0.0 0.120 0.079 Window 1: Wood I-rame,Double Pane with I-ow-E Clcar.:hgc 0'F 270 --- -- 0.430 0.547 Door l: Solid 42 — -- 0.179 0.127 Door 4; Glass,Clear, 4)gc 0.54 102 — -- 0.430 0.547 Floor 1: Unheated Slahb-On-Grade, Depth 4 ft.th1 216 — 10.0 -- -- (:11 BudFut l)-hicu�n arc used For suftware ha.�clme calculations ONLY.and are not code requirements. (b)Cmain builtdine use typrs require continuous under-slab insulation(sc c Massachusens Code Section 13(43 2.7 and 13(4 .2.8). Envelope PASSES: Design 29"4 better than code Section 4: Compliance Statement The proposal (mvelope deign represented in this document is consistent with the building plans, specifications and other calculations submitted with(his permit application. The proposed envelope system has been designed to meet the NfissachuFetuz Commercial Code requirements in COlvicheck-EZ Version 2.4 Release 1. Wo 04 Principal Em clupe Designer-Name Signature Date Lighting Compliance Certificate Massachusetts Commercial Code COMcheck--EZ Softu-are Version 2.4 Rclease 1 Daft filename:W04018 -NCB-FLorencc''Docum nts\Com Check energy analysis retail.cck Section 1: Project Information Project Name: Northampton Cooperative Bank-Retail Building 8 Main Street Florence,MA 01060 Designer/Contractor: Kuhn Riddle Architects 7 North Pleasanst Street Amherst.MA 01002 Document Author: Erica Gees AIA Section 2: General Information Building Location: Northampton,Massachnaems Climate 'Lone: 14a Heating Dcgrec Day.(b3-.;c 65 degrees F): 6894 Cooling Degree Days(base 65 degrees F): 507 Building Use Method of Compliance: Whole Building Method Building Type Floor Arca Rctail 2660 Project Dezzcription (check one): Ncw Cunstructiun Addition Alteration Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist inspection Approved Initial Date (YIN) Controls.$,-i itching. and Wiring Independent controls for each space(switch/occupancy sensor) Excepliuns: Security lighting.building lobby/retail store/mall Master switch at entry to hotel/motel guest room Two switches, dinuner,or occupancy sensor in each space providing I a uniform illum I narion pattem Exceptions: Only one luminaire in space: An occupant-scmiing dt-\•icc controls the arca: The area is a corridor, storage.restroom, or lobby PhotocclUastronomical time switch on cxtcrior lights l;xceprin ns: Large cuN,crcd areas requiring lighting during daylight hours Tandem wired one-lamp and three-lamp ballasted luminaires Exceptions: Electronic hich-frcquency ballasted luminaires not on same switch Interior Lighting Total actual watts must be less than or equal to total allowed watts Allowed Watts Acmal Watts Complies(Y,N) 5054 2892 YES Exterior Lighting Type(s) of cxtcrior lighting sources: _Fluorescent _Metal Halide —High-Pr. Sodium Exceptinns: Specialized signal. directional,and marker lighting; lighting highlighting cxtcrior features of historic buildings, advertising signage: Safety or Security lighting: low-voltage landscape lighting. Section 4: Compliance Statement The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this pemtit application. Tlie proposed lighting system ha_s been designed to meet the Mascachusemq Commercial Code requirements in COMcheck-L•Z Version 2.4 Rckwe 1. Principal Lighting Dciigner-Name Signature Date R ZTAIL. Lighting Application Worksheet Massachusetts Commercial Code COMcheck-E7-Sofnvarc Version 2.4 Rcicasc 1 Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Wath Wats Building Tjre , _ (ft—')) (warts/fr2) (B x C) Retail 2660 1.9 5054 Total Allowed Watt-= 5054 Section 2: Actual Lighting Power Calculation A B C D E F Fixture Fixture Description i Lamps/ R of Fixture ID lamp Description i Wattage I'er Iam»! Halla-t Fixn,re Fixtures Watt. (D x E) 1 Tcmproary Cagc Light/Incandescent 100W 1 27 100 2700 E Ceilina Recessed/48" T8 32W!Electronic 1 2 32 64 N Surface mounted/48" T8 32W/F,lectronic 2 2 64 128 Total Actual Watt-= 2892 Section 3: Compliance Calculation !f the Total:l//aired 11*aus minus the Total.4crual Warts i.-greater than or equal to zero,the building complies. Total Allowed Wats= 5054 Total Actual Watt,= 2892 Project Compliance= 2162 Lighting PASSES: Design 43%better than code I NORTHAMPTON CO-OP BANK f C',� ENERGY SYSTEMS B SIS OF DESIGN FLORENCE,MA AItRATIVE pEN�F gar�vSGN, 010 Information required pursuant to the Massachusetts State Building Code 780 CMR, 1301.8.4.1. Owner: Northampton Co-Op Bank Designers of Record: Lindgren & Sharples, P.C. Consulting Engineers Date of Submittal: November 22, 2004 1. Design Intent • This project consists of a new branch bank building and retail building. This project will include the installation of new gas fired furnaces and air conditioning for both buildings. • The Project is located at 8 Main Street. The Building Use Group for the Bank Building is Business B with construction type 3B unprotected. The retail building is mercantile construction 3B as defined by the Massachusetts State Building Code. • The building consists of approximately 2,400 square feet of floor space on one level for the Bank, and 2,600 square feet of floor space for the Retail Building. • Both buildings are new construction with exposed standing seam metal roof and exposures on north, south, east and west elevations. The operating schedule is 12 hours/day six days per week... L&S 1081 Page 1 • Heating will be supplied from two gas-fired high efficiency furnaces per building, each sized and controlled to achieve operating flexibility and efficient operation. • Lighting and power systems have been designed to provide proper ambient light, accent lighting as well as operating flexibility and efficient operation. • The designer of record will verify that the systems have been installed in substantial accordance with the approved construction documents, in conformance with 780 CMR 1301.8.4.4. 2. Basis of Design • The following are the assumptions used to calculate the capacities and parameters for the building components. HVAC Interior temperature set points: • 70 deg. F. heating when occupied; 55 deg. F. heating when unoccupied. • 74 deg. F. cooling when occupied; 90 deg. F. cooling when unoccupied. Outdoor ambient design temperatures: • 0 deg. F. winter • 87 deg. F. db, 73 deg. F. wb summer Occupancy • 24 - Bank • 45 - Retail Envelope • 3035 sf gross wall area - Bank • 381 sf gross glass area - Bank • 3081 sf gross wall area - Retail • 372 sf gross glass area - Retail • 14'-0" envelop wall height • All walls are masonry with furred-out metal studs. • Glass is double-glazed, low-E, insulating glass. • Glass and walls have a north, south, east, and west exposure. L&S 1081 Page 2 • Mechanical outside ventilation air is provided at 15 cfin/occupant. Lighting • 50 foot candles ambient lighting provided offices—Bank. • 5 foot candles general lighting for Retail Building—(temporary). • 1.2 watts per gross square foot for ambient lighting. • 30 foot candles general lighting for all corridor, storage areas. 3. Sequence of Operations and Interactions HVAC • Heating will be provided by two gas-fired furnaces (per building). Each unit will be controlled buy local programmable thermostat allowing for variable space set points and occupancy schedules. • Fresh air motorized dampers will be open during all occupied periods providing code-compliant ventilations. Fresh air damper will be closed during off-hour unoccupied periods. Lighting • Emergency lighting and exit sign lighting will be fed from self contained battery packs. • All lighting will be controlled by local switches. 4. Systems and Equipment Capacities HVAC • The new furnaces and cooling coils will be a constant volume air system. The furnaces are high efficiency (92%) condensing style. Each unit is rated for 93,000 Btuh heating, 48,000 Btuh cooling, and will provide 400 cfm of outside ventilation air. Lighting • The ambient lighting system will be accomplished with a combination of direct and indirect fluorescent fixtures. The lighting controls will be located locally and operated with ease. L&S 1081 Page 3 5. Testing • The following tests and inspections shall be performed by the General Contractor with the Owner and the Owners representative present. The test and inspections must comply with the criteria stated for the work to be accepted. HVAC • Inspect new furnaces, coils and fans for any physical damage. There shall be no dents or distortion of the metal. • Inspect new furnaces, coils and fans for any unusual noise or vibration. There shall be no unusual noise or vibration when the unit is operating. • Inspect new piping and equipment for leaks. • The HVAC system shall be tested to verify that the final TAB report is correct. Readings within 10%of those listed on the final TAB report shall be considered acceptable. If the readings are not acceptable, then all systems in the space must be balanced and a new final TAB report prepared. After the new final TAB report is issued, all HVAC systems in that space will be tested to verify that the new final report is correct. • Verify that the HVAC system is functioning correctly. The control valves shall operate when the space sensor calls for heat and the air conditioner must function when the space sensor calls for cooling. The outside air damper shall open when the temperature control system is in the occupied mode and shall remain closed when the temperature control system is in the unoccupied mode. Lighting • Demonstrate that the time clocks controlling the lighting system automatically turn the lights off and on at the prescribed times. • Inspect that all lamps in all the fixtures are functioning. 6. Operation Manuals and Maintenance Manuals When the buildings are completed and ready for occupancy, the General Contractor shall provide the following items before the review and final testing will begin. L&S 1081 Page 4 HVAC • Two complete sets of operating manuals. • Two complete sets of maintenance manuals. The manuals shall cover all new HVAC equipment. Electrical • Two complete sets of operating manuals. The manuals shall cover occupancy sensors,time clock controls, and light fixtures. 7. Record Drawings and Control Documents When the both buildings are complete and ready for occupancy, the General Contractor shall provide the following items before the review and final testing will begin. • As-Built Drawings for the HVAC, electrical, and lighting systems. • Copy of the final test, adjust and balance (TAB)report. ***END OF NARRATIVE*** REPORT BY: Marvin Blakley ers/1256/admin L&S 1081 Page 5 Envelope Compliance Report Massachusetts Commercial Code u (j i CONIchecA-EZSofivare Version 2.4 Release 1 �aV [U Fq Data filename:M:'�0401 A-NCR-FLorence`d)ocumenb,Com Chcck energy analysis bank cck.cck L �VEFT_OTr 11 SS ECTIONS R'HAat,�JON,M,A Section l: Project Information 01060 Project Name: Northampton Cooperative Bank-Bank Building F Main Street Florence, MA 01060 Dcoigncr/Contractor. Kuhn Kiddle Architect.; 7 North Plcasanyt Street Arnher.,i.MA 01002 Document Author. Erica Gccs Ain Section 2: General Information Buildine Location: Northampton.Massachusetts Climate lone: 14a Heating Degree Day,(base 65 dcgreex F): 6894 Coolinc Dcercc Days(base 65 decrees F): .i07 Building Use Method of Compliance: NVhoic Building Method Ruildine'l,me Floor Arra Office 2401 Project ne:cripnon(check onc): Ne1v Construction Addition Alteration Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Air Leakage,Component Certification,and Vapor Retarder Requirements Inspection Approved Initial Date (Y/N) All points and penetrations are caulked,ga•keted, weather-stnpped.orothcrulsc sealed _ Window,,doors,and skylights certified as meeting leakage requirement; Component R-value.&U-factors labeled as certified _ Vapor retarder inaolled -- - - - 1wel. Climate-Specific Requiremenca Gross Cavity Cont. Proposed Budget Component Name/Description Area R-Value R-Value U-Factor U-Factor Roof l: All-wood Joist/Raftel-/Truss 2401 38.0 0.0 0.028 0.054 Exterior Wall I: Solid Concrete or Masonry=8- Furring: Metal 2731 16.2 0.0 0.120 0.079 Windom. 1: \Vood 1•rame, Double Pane with Low-E Clcar.shgc 0.28 218 --- --- 0.430 0.547 Window 2: Metal Frame with Thermal Break.Triplc Panc with Low-E Tinted.shoe 0,28 31 --- --- 0.630(b) 0.547 Door 1: Sulid 21 --- --- 0.180 0.127 Exterior Wall?: Mctal Frame. 16" o.c. 254 0.0 19.0 0.047 0.079 Window 3: Metal game with Themial Break_ Doublc Pane with Low-E Clear.shgc 02 70 --- --- 0?80 0.547 Door 4: Air Lock Entry 62 — -- 0.630(b) 0.127 Interior W-60i 2: 1`tetal Frame. 16" o.c. 1036 5.0 5.0 0.094 0.127 Floor l: Unheated Slab-On-Gude, Depth 4 fuc) 220 — 10.0 — — (s'I l3udEct I1-lactim are ua,:d for 3ufo%are ba whnc i:alculations ONLY,and arc not code requirements. (b)Claimed pcif nnancc docs nor exceed dcfatiltc in Tahlcs 1301 A' 1.No rn.,inufacturcr certification required. (.e)Certain building use rypt.-require crnrinuow.under-Imb in�ulaiictn(see M3e\u.:huSewo Code Section 1304.2.7 and 1304.2.5). Envelope PASSES: Design 28°'n bencr than code Section 4: Compliance Statement The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculanons submirred with this permit application. The proposed envelope system has been designed to meet the Massachusetts C ommcrcial Code requirements in CONIcheck-E[Version 2.4 Release 1. 619-l.0-+ G6a6SIR' til M/041- Principal Envelope Designer-Name Signature Datc ISM Lighting Compliance Certificate Massachusetts Commercial Code CONlcheek-EZ Soll urc Version 2.4 Release 1 Data filename:M:10401 R -NCB -FLorencelDocuments\Cam Check energy analysis basil:cck.cck Section l: Project Information Project Name: Northampton Cooperative Bank-Bank Building R Main Srreet Florence.MA 01060 Design er'C'ontnctor: Kuhn Riddle Architects 7 North Pleasant Street Amherst.MA 01002 Docwnant Author: Erica Gees AIA Section 2: General Information Building Location: Northampton,:Massachuacru Climate Zone: 14a Heating.Degree Days(base 65 degrees F): 6994 Cooling Degree Day,(base 65 degrees F): 507 Building Use Method of Compliance: Whole Building:Method Building Type _ _ __ __ ,_ __ Floor Area Office 2401 Project De.4cription(check one): New Construction Addition _Alteration _Unconditioned Shcll(File Affidavit) Section 3: Requirements Checklist Inspection Approved Initial Date (YIN) Controls,Switching.and Wiring Independent controls for each space(switclvoccupancy sensor) Exceptions: Security lighting,building lobby/reran store/mall blaster�wirch at entry to hotel/motel guest room Two suitchcs. dimmer. or occupancy sensor in each space providing a uniform illumination pattern £xcepriuns: Only one luminaire in spaec; A,t occupant-aenzmg device controls the area: The area is a corridor.storage.re:atroom.or lobby PhoLuce I11w mnomical time switch on exterior lieltits Exceprion.N. Large covered areas requiring lighting during daylight hour, Tandem wired one-lamp and three-lamp ballasted luminaires _ Lxceprinns: Electronic high-frrqucncy ballasted luminaires not on same.witch Interior Lighting 15�•�1 K Lighting Application Worksheet Massachusetts Commercial Code CONIcheck-EZ Software Version 2.4 Release I Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Watts Buildinp-TNpr (ft2) (watts/ft2) (B x C) Office 2401 1.3 312) Total Allowed Watts= 3121 Section 2: Actual Lighting Power Calculation A B C D E F Fixture I'ixturc Dc,cription/ Lamps/ a of Fixture ID Lamp Description/W;itlxkc Pcr Lamp/Ballast_ Fixture Fixtures WattD( x Fl A CFILING RECESSED/24"TR 17W/Electronic 2 17 34 578 B CFTT ING RF.CFSSFD/24" TRU 32W!Electronic 2 6 64 384 D CLILNG KL•CLSSLU/48" 178 32W/Electronic 2 8 64 512 E CEILNG RECESSED/49" TR 32W/Electronic 1 2 34 68 F MING RFCFSSF.D/Other/F..lectronic 2 2 64 128 G CUL1NG RECESSED/Other/ L•'lectranic 2 6 52 312 H CEILING RECESSED/Other! Electronic 1 7 32 224 ! PENDANT/Incandescent 60W 3 1 180 180 L RECCESSD SOFFIT 148"T8 32W/Electronic 2 4 64 256 N SURFAC L•' PLNDANT/48" T8 32W/'Electronic 2 2 64 128 P CEII NG PFNDANT/' Incandescent 60W 3 1 180 180 Q WAT.T.1;17RFACF./24" TR 17W !Electronic 2 1 34 34 R W-\I 1. IZFCI'SSFD/OTher/Flectronic 1 2 32 64 U UNDLR COUNTER L1GH'1'%24" '1'8 17W/Mectronic 1 2 17 34 Total Actual Wath= 3082 Section 3: Compliance Calculation If the Tautl.4/1oired If'WIN minus the Toral,1 crux/ I'Varts is greater than or equal to zero.the building complies. Total Allowed Watts= 3121 Total Actual Watts= 3082 Project Compliance= 39 Lighting PASSES: Deign 1"/„better than code Total actual watt.: muet he less than or equal to total allowed watts Allowed Watts Actual Watts Complies(YN) 3121 3(1R2 YES Exterior Lighting Type(;)of cxtcnor lighting sources: _rluortscent Metal Halide _ High-Pr. Sodium _ facepliuns: Specialized signal.dircctional. and marker lighting: lighting highlighting exterior features of histone buildings: advertising:ignagc:safety or security lighting: low-voltage landscape lighting. Section 4: Compliance Statement The propoxed lighting design represented in this document i.�consistent with the building plats,specifications and other calculations submitted with thk permit application. The proposed lighting system has been designed to meet the Ma«achutetts Commercial Code requircmcnt�in COMcheck-EZ Vcrsion 3.4 Release 1. f-K1i est- ()c5 A - ti I 2,J a'-f - Principal Lighting Designer-Name Signature Date i Envelope Compliance Report Massachusetts Commercial Code COMchrc 6-EZ Software Version 2.4 Release I Data filename: M:`•0401 S -NCS -FT.orence0ocuments\Com Check energy analysis retail_cck Section 1: Project Information Project Namc: Northampton Cooperative Bank-Retail Building R Main Street Florence,MA 01060 Dc.igncr/C'omractur: Kuhn Riddle Arclutects 7 North Plcasanst Street Anther,L MA 01002 Document Author: Erica Gees AIA Section 2: General Information Building Location: Northampton,Massachusetts Climate Zone: l4a I leating Degree Days (baae 65 degrees F): 6894 Cooling Degree lays(base 65 degrees F): 507 Building Uie Method of Compliance: Whole Building Method Building Type Floor Area Retail 2660 Protect Dez-cription (check one): New Construction Addition Alteration Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Air Leakage, Component Certification, and Vapor Retarder Requirements Inspection Approved Initial Date (Y/?) All joints and penetration: are caulked.gasketed. weather-stripped. or otherwise sealed Window,,,doors.and :kyligltts certified as meeting lc3kagc requirLmLnui ___... . Component R-value.&U-factors labeled as certified Vapor retarder installed 2�T�L Climate-Specific Requirements Gross Cavity Cont. Proposed Budget Component Name0e,:erintion Area R-Value R-Value U-Factor U-Factor Roof 1: .411-Wnnd.loi:dRafter/Trus, 2660 38.0 0.0 0.028 0.054 Exterior Wall 1: Solid Concrete or Masonry>8" Furring: Meral 3081 16.2 0.0 0.120 0.079 Window l; Wood I-rame.Double Pane with I-ow-E Clear.shgc U.'F 270 -- -- 0.430 0.547 Door l: Solid 42 — -- 0.179 0.127 Door 4; Glass,Clear,rhgc 0.54 102 — -- 0.430 0.547 Floor 1: Unhcated Slab-On-Grade,Deptlt 4 ft.ih) 216 — 10.0 -- -- (al BuctFct U-rii�u,r�arc u>ed for solmarc ha:zc1ine calculations ONLY.and are not code requirements. (b)Cu-nain huildine use i\pes require conrinuous under-slab insulation(sa:Massachuscns Code Section 1304?.7 and 1304.2.8). Envelope P.xSSES: Deign_R"w better than code Section 4: Compliance Statement The proposed envelope de iun represartted in this document is consistent with the building plant.;. specifications and other calculations,ubmittcd Ntith(his permit application. The proposed envelope system has been designed to meet the Massachusem; Commercial Code requirements in COlvicheck-EZ Version 2.4 Release 1. hick 61�% tlA d&aar� -- IfIILI 04 Principal En N clupe Designer-Natne Signature Date Lighting Compliance Certificate Massachusetts Commercial Code COMchcck-EZ Soiiu-are Version 2.4 Release 1 Data filename:M:\04018 -NCB -FLorencc'Oocum nts\Com Check energy analysis retail.cck Section 1: Project Information Project Name: Northampton Cooperative Bank-Retail Building R Main Street Florence,MA 01060 Designer/Contractor: Kuhn Riddle Architects 7 North Pleasanst Street Amherst-MA 01002 Document Author: Erica Gees AIA Section 2: General Information Building Location: Northampton,Massachusetts Climate 'Lone: 14a Heating Degree Days(bast 65 degrees F): 6894 Cooling Degree Days(base 65 degrees F): 507 Building Usc Method of Compliance: Whole Building Method I Building Type Floor Arca Rctail 2660 Proiect Dezzcripuon (cheek one): New Cun-,tructiun Addition Alreration Unconditioned Shell(bile Affidavit) Section 3: Requirements Checklist Tnspection Approved Initial Date (YrN) Controls.Sri itching. and Wiring Independent control,for each space(switch/occupancy sensor) Excepliuns: Security lighting.building lobby/retail store/mall Master:Witch ar entry to hoteUmorel guest room Two switches, dinuner,or occupancy sensor in each space providing I a uniform illum narion pattern Exceprion.�: Only one luminaire in space: An occupant-scmiing dt\•icc control; the area: The area is a corridor, stnrage.restroom,or lobby Photocell/a.;tronomical time switch on exterior lights EYceprin n c: Large cu\,crcd areas rcyuiring lighting during daylight huurs Tandem wired one-lamp and three-lamp ballasted luminaires Exceptions: Electronic hich-frequency ballasted luminaires not on same switch Interior Lighting Total actual waus must be less than or equal to total allowed watts Allowed Watts Actual Watts Contplies(Y,N) 5054 2892 YES Exterior Lighting Type(s) of cxlcrior lighting sources: Fluorescent _Metal Halide —High-Pr. Sodium Exceptions: Specialized signal, directional, and marker lighting; lighting highlighting ruerior features of historic buildings: advertising signage: safety or security lighting: low-voltage landscape lighting. Section 4: Compliance Statement The proposed lighting design represented in this document is consistent with the building plans,specification-,and other calculations submitted with this permir application. The proposed lighting system has been designed to meet the Massachusetts Commercial Code requirements in COMcheck-L•Z Version 2.4 Rcic&-e 1. Principal Lighting Dc:�igncr-Name Signature Date R ZTA i .. Lighting Application Worksheet Massachusetts Commercial Code COMcheck-E7_Softiearc Version 2.4 Rcicasc 1 Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Watts Buildine Tire _ (ft2) (warts/fr2) (B x C) Retail 2660 1.9 5054 Total Allowed Watts= 5054 Section 2: Actual Lighting Power Calculation A B C D E F Fixture Fixture Description/ Lamps/ 9 of Fixturc Lamp Description/ Watraee I'er limn! hlallaci Fixn,re Fixtures Watt. D( x E) I Tcmproary Caec Light/Incandescent 100W 1 27 100 2700 E Ceiling Recessed/48" T8 32W/Electronic 1 2 32 64 N Curface mounted/49" T8 32W/F,lectronic 2 2 64 128 Total Actual Wath= 2892 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Actual Warts is greater than or equal to zero,the building complies. Total Allowed Warts= 5054 Total Actual Watb= 2892 Project Compliance= 2162 Lighting PASSES: Design 43%better than code I TRANSMITTAL No. 00058 AQUADRO & C,E.RRI-�l l PO Box 656•Notthatnpton M A 09060 •P 413 5844022-F413 5840011 PROJECT: NCB - Florence Branch DATE: 11/24/2004 TO: Northampton Building Department REF: Energy Compliance 212 Main Street Northampton , MA 01 T6LL E C k u-`Yl—-FAX#PAGES i NOV 2 4 2004 ATTN: Ton Patillo �" - y I nF�nr PI III N&Ir,IksoECTIONS� .. WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: Shop Drawings V Approval Approved as Submitted Letter Your Use Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: R Returned ❑ Specifications ❑Attached ❑ Returned for Corrections ❑ Other: ❑Separate Cover Via: ❑ Due Date: ITEM NO. COPIES DATE ITEM NUMBER REV.NO. DESCRIPTION STATUS 2 11/24/200, Envelope Compliance Report 2 11/24/200, Energy System Narrative Remarks: ✓7 I CC: Signed: Bryan Gleason Expedition 10