Loading...
18.1120-NHAMPTON-ELEV BLGD B- SOLAR10'-0"25'-0"15'-0"SECOND LEVELFIRST LEVEL15'-0"FINISH PAVINGPER PLANS0'-0"FFE=136.0RETAINING WALL5'-0"BUILDING B - SOUTH ELEVATION000000000000000000000000000000000000000000000000L I N E M A T C HRETAININGWALL5'-0" 8'-0" 10'-0" 25'-0"0'-0"FFE=136.000000000000000000000000000000000000000000000000015'-0" L I N EM A T C H PLATINUM STORAGEGROUP2100 MAIN ST., SUITE 106,IRVINE, CA 92614 - 949-381-3830DATE:18 AUG 2018PROJECT No: 18-07310020'40'STORAGE DIRECT - NORTHAMPTONEASTHAMPTON ROAD -ROUTE 10, NORTHAMPTON, MA2OF 9NORTH27405 PUERTA REAL, SUITE 235, MISSION VIEJO, CA 92691949-525-9229BUILDING B ELEVATIONSSCALE 1 1/2"1'-0"1 OCT 2018NORTHAMPTON ZONING SECTION 350-11.6 (5):THE BUILDING IS DESIGNED TO ACCOMMODATESOLAR POWER INSTALLATION. ROOF DESIGN TOSUPPORT PANELS. ROOF ORIENTATION, CONDUITAND ELECTRICAL SERVICE WILL BE INCORPORATEDSO THAT INSTALLATION CAN EASILY BE ADDEDEITHER AT THE TIME OF CONSTRUCTION OR ATANY POINT THEREAFTER.11/19/2018 6:19:57 PM 10'-0" 25'-0" 15'-0"SECOND LEVELFIRST LEVEL15'-0"FINISH PAVINGPER PLANS0'-0"FFE=136.00'-0"FFE=146.0BUILDING B - EAST ELEVATIONBUILDING B - NORTH ELEVATION10'-0"T.O. PARAPETSECOND LEVEL15'-0"25'-0"FIRST LEVELL I N E M A T C H 8'-0" 9'-2" 15'-0" 15'-0" L I N EM A T C H PLATINUM STORAGEGROUP2100 MAIN ST., SUITE 106,IRVINE, CA 92614 - 949-381-3830DATE:18 AUG 2018PROJECT No: 18-07310020'40'STORAGE DIRECT - NORTHAMPTONEASTHAMPTON ROAD -ROUTE 10, NORTHAMPTON, MA2OF 9NORTH27405 PUERTA REAL, SUITE 235, MISSION VIEJO, CA 92691949-525-9229BUILDING B ELEVATIONSSCALE 1 1/2"1'-0"1 OCT 2018NORTHAMPTON ZONING SECTION 350-11.6 (5):THE BUILDING IS DESIGNED TO ACCOMMODATESOLAR POWER INSTALLATION. ROOF DESIGN TOSUPPORT PANELS. ROOF ORIENTATION, CONDUITAND ELECTRICAL SERVICE WILL BE INCORPORATEDSO THAT INSTALLATION CAN EASILY BE ADDEDEITHER AT THE TIME OF CONSTRUCTION OR ATANY POINT THEREAFTER.11/19/2018 6:20:49 PM 8'-0"9'-4"10'-4"11'-4"BUILDING A - NORTH ELEVATIONBUILDING A - NORTH ELEVATION9'-4" 10'-4" 10'-4" 9'-4" 11'-4" 11'-4" 8'-0"BUILDING A - EAST ELEVATION8'-0"9'-4"10'-4"11'-4"BUILDING A - SOUTH ELEVATION9'-4" 10'-4" 10'-4" 9'-4" 11'-4" 11'-4"BUILDING A - WEST ELEVATION8'-0"BUILDING A - SOUTH ELEVATIONPLATINUM STORAGEGROUP2100 MAIN ST., SUITE 106,IRVINE, CA 92614 - 949-381-3830DATE:18 AUG 2018PROJECT No: 18-07310020'40'STORAGE DIRECT - NORTHAMPTONEASTHAMPTON ROAD -ROUTE 10, NORTHAMPTON, MA2OF 9NORTH27405 PUERTA REAL, SUITE 235, MISSION VIEJO, CA 92691949-525-9229BUILDING B ELEVATIONSNORTHAMPTON ZONING SECTION 350-11.6 (5):THE BUILDING IS DESIGNED TO ACCOMMODATE SOLAR POWERINSTALLATION. ROOF DESIGN TO SUPPORT PANELS. ROOFORIENTATION, CONDUIT AND ELECTRICAL SERVICE WILL BEINCORPORATED SO THAT INSTALLATION CAN EASILY BEADDED EITHER AT THE TIME OF CONSTRUCTION OR AT ANYPOINT THEREAFTER.11/19/2018 6:19:21 PM BUILDING B - NORTH ELEVATION8'-0" 9'-4" 10'-5" 11'-5"PLATINUM STORAGEGROUP2100 MAIN ST., SUITE 106,IRVINE, CA 92614 - 949-381-3830DATE:18 AUG 2018PROJECT No: 18-07310020'40'STORAGE DIRECT - NORTHAMPTONEASTHAMPTON ROAD -ROUTE 10, NORTHAMPTON, MA2OF 9NORTH27405 PUERTA REAL, SUITE 235, MISSION VIEJO, CA 92691949-525-9229NORTHAMPTON ZONING SECTION 350-11.6 (5):THE BUILDING IS DESIGNED TO ACCOMMODATE SOLAR POWERINSTALLATION. ROOF DESIGN TO SUPPORT PANELS. ROOFORIENTATION, CONDUIT AND ELECTRICAL SERVICE WILL BEINCORPORATED SO THAT INSTALLATION CAN EASILY BE ADDEDEITHER AT THE TIME OF CONSTRUCTION OR AT ANY POINTTHEREAFTER.11/19/2018 6:21:13 PM