24C-147 LETTER May 22, 2017
Richard Flynn
1 Arlington Place
Northampton, MA 01060
Mr. Flynn,
In November 2016 we received a Permit Application for electrical work to be performed at the above
address. It was submitted by Romeo Beaulieu &Sons to wire a system 2000 boiler. Typically, once the
work is complete, the electrician will call to schedule an inspection to ensure that it has been installed
correctly and safely. We never received that call and the inspection does need to be performed. We
were unable to locate a phone number for you, so are attempting to reach you via mail. Please give us a
call to schedule a time for the Electrical Inspector to come out,the inspections are quick and can be
done at a time of your choosing. Thank you.
Meghan Cahill
Inspections
Building Department
212 Main St
Northampton, MA
413-587-1271
a