32A-216 LETTER May 22, 2017
Claire Hammonds
77 Pomeroy Terrace
Northampton, MA 01060
Ms. Hammonds,
In August 2016 we received a Permit Application for electrical work to be performed at the above
address. It was submitted by Robert Webster Electric for a replacement water heater. Typically, once
the water heater has been installed, the electrician will call to schedule an inspection to ensure that it
has been installed correctly and safely. We never received that call. We did attempt to call you to
schedule an inspection, but your voice mailbox was not accepting messages, so we are attempting to
contact you via mail. Please give us a call to schedule a time for the Electrical Inspector to come out,the
inspections are quick and can be done at a time of your choosing. Thank you.
Meghan Cahill
Inspections
Building Department
212 Main St
Northampton, MA
413-587-1271